Status Optical System KM3NeT

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

The Multi-PMT Optical Module P.Kooijman, University of Amsterdam University of Utrecht Nikhef.
DASAN NETWORKS GPON Training
AtacamaLargeMillimeterArray Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain Fibre Optic Links for IF DTS Roshene McCool Jodrell Bank.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
DKTCOMEGA EDFA Product Line Jesper Broszka, Product Manager.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LOW COST RADAR 2012 CERF PROJECT ERIC WALTON OSU/ESL JULY 2012 ERIC WALTON OSU/ESL JULY
M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July In this talk Preparation of mass construction (including DOM and DU integration)
September 11-12, 2013KM3NeT, CLBv2 Workshop Valencia Peter Jansweijer Nikhef Amsterdam Electronics- Technology Shore station brainstorm 1.
JgimenoIWM-12/1/2004 Fiber Optic module 1 STUDIES AND DEVELOPMENT OF A FIRST FIBER OPTIC MODULE PROTOTYPE Javier Gimeno Vicente.
Tests of STO IF Components S. Weinreb April 15, 2009 Two 1-2 GHz IF amplifier plates and one 5 GHz converter plate for the Texas test flight have been.
DOM INTEGRATION MEETING DAAN VAN EIJK 1 OCTOBER 2015.
Steering committee Mechanics 29/07/ KM3NeT steering committee Edward Berbee - nikhef 2 DU-1 pictures at CPPM.
Ethernet Line Extensions Gigabit PoE Unmanaged Switches M12 Unmanaged Switches.
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
05/07/2010P. LamareBackbone dry solution Dry backbone requirements.
P. Timmer Nikhef Amsterdam Afd. ET. Acceptance test 400V – 12V DC-DC converter Chroma DC Electronic load Delta Elektronika SM 400-AR-4 400V 2A.
Rosanna Cocimano Amsterdam, 5-6 July 2010KM3NeT WPF/L General Meeting Rosanna Cocimano INFN LNS Power plan for detector layout Presented in TDR.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
KM3NeT-Italy Collaboration meeting 27/11/2014 Sistema di trasmissione dati su fibra ottica: Tower Sara Pulvirenti.
Global overview of the Optical Network for KM3Net Phase 1 Sander Mos KM3NeT Collaboration Meeting 30 January 2013 Marseille.
Agenda Mededelingen PMT – Measurements of Hamamatsu PMTs, Erwin – New persons Dorothea – Test area, euipment, etc. VEOC/String – debriefing meeting at.
1 S. Russo, F. Ameli KM3Net WP3-WP5 Joint Meeting :: Paris :: February 2009 Copper backbone data transmission system: first results.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
SEA operations – June 2012 Short summary report R. Papaleo 22 june 2012.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Agenda Mededelingen – equipment for rope stretch test arrived – ropes SK78 40 m for tests arrived – rope DM20 offer asked (6 x 1 km) (1 euro / m, deliverty.
Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.
PPM-DU (WORKING DOCUMENT, DO NOT PUBLISH) A three DOM Detection Unit in place of an Antares string. Nikhef for KM3NeT: PPM-DU optical network DRAFT!, designed.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
KM3NET-IT Tower Power System Rosanna Cocimano for KM3NET-IT Power Group 26 november
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
KM3NeT-Italy Collaboration meeting 28/11/2014 Sistema di trasmissione dati su fibra ottica: Junction Box Sara Pulvirenti.
KBC Networks 2010 Fibre optic Wireless Broadcast Network Transmission Welcome.
A DWDM link for Real-Time data acquisition systems
1-Port Ultra PoE to 4-Port 802.3af/at Gigabit PoE Extender
DAQ read out system Status Report
On behalf of Patrick Lamare
LKr status R. Fantechi.
Concluding remarks E. Migneco
DOM integration meeting
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
Els de Wolf 20 February 2012, Catania
Preparatory Measurement
T1 Electronic status Conclusions Electronics Cards:
Data transport architecture over fiber and/or copper
Junction Boxes for KM3NeT
PPM-DOM. SPM DOM LCM SS-part ILxx
SC of KM3 Vidyo meeting of Thursday, February 18
WP02 PRR: Master Oscillator and RF Reference Distribution
8/16-Port Gigabit 60W Ultra PoE Managed Injector Hub
DT Infrastructure: LV, HV, Gas
DWDM TECHNOLOGY PALTEL TOPLOGY FOR PALESTINE
WP02 PRR: Master Oscillator and RF Reference Distribution
Township of Langley Wireless Data Project
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
RPC Detector Control System
Track Finder Crate, Backplane and Parts
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
RPC Detector Control System
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

Status Optical System KM3NeT 29-July-2015 Steering Committee Meeting - Vidyo

Contents Optical Test Bed at Nikhef Optical network Italy: replacement Raman by 2x EDFA Propagation delay and sensitivity test of SFP receivers for shore station Purchase of SFP receivers for shore station Procurement of remaining optical components Test of JB12/001 for Italy during deployment operation Use of the redundant fiber in Pave penetrator Nikhef 400V/12V DC/DC Convertors Pre-deployment test of DU-1 & DU-2 29-July-2015 Steering Committee Meeting - Vidyo

Optical Test Bed at Nikhef The complete test bed will be housed in one 19inch rack Due to delay for integration of DU-2, now time available for work on test bed Status of the test bed: Front panels of the custom crates are designed and ordered. Custom crates will house the optical components that are not delivered as a 19"crate All optical components available except: - Add-and-drop filters (ch59) used in the DU-base (are ordered) - Raman amplifier for Italian shore station (2 are available for shore station, use 1 temporary in test bed) - new EDFA amplifiers for SC/DC optical path for Italian shore station (2 sets are ordered for shore station, use 1 set temporary in test bed) 29-July-2015 Steering Committee Meeting - Vidyo

Optical network Italy: replacement Raman by 2x EDFA The specifications of the preamp-EDFA and the booster-EDFA are defined. Both EDFA types will have a monitor port on the input and output Quotation requested and received: - preamp-EDFA: 5600 € (excl. VAT) - booster-EDFA: 6200 € (excl. VAT) Two EDFAs of each type are ordered begin-July (lead time: 8 weeks) 29-July-2015 Steering Committee Meeting - Vidyo

Propagation delay test of SFP receivers for shore station Adjusted setup that can also measure the propagation delay of a SFP receiver-only device 29-July-2015 Steering Committee Meeting - Vidyo

Propagation delay test of SFP receivers for shore station RR112SVX-SST SFP receiver-only APD Same receiver as in RSP12SVX-ST5 RSP12SVX-ST5 SFP transceiver APD Candidate receiver used for DU-1 at CPPM RR112SVX-SST SFP transceiver PIN SFP used in the DOMs SFP type/ sn Input Range [dBm] Min RTT [ps] Max PD Difference RR112SVX-SST 32615P51500010 -10.0 till -40 952991 953006 15 32615P51500009 952986 953009 23 RSP12SVX-ST5 32404P41100020 953030 953056 26 32404P41100024 953061 953069 8 RDP12SZX-S45C DY450P43000001 -10.0 till -33 952797 953014 227 29-July-2015 Steering Committee Meeting - Vidyo

BER test of SFP receivers for shore station Setup that can also measure the propagation delay of a SFP receiver-only device 29-July-2015 Steering Committee Meeting - Vidyo

BER test of SFP receivers for shore station RR112SVX-SST SFP receiver-only APD Same receiver as in RSP12SVX-ST5 RSP12SVX-ST5 SFP transceiver APD Candidate receiver used for DU-1 at CPPM RR112SVX-SST SFP transceiver PIN SFP used in the DOMs Input Power RR112SVX-SST 32615P51500010 32615P51500009 RSP12SVX-ST5 32404P41100020 32404P41100024 DY450P43000001 [dBm] BER CL [%] -29 <1E-11 99.92 -30 99.97 -31 1.1E-9 -32 2.8E-7 -33 1.8E-5 -36 99.99 99.98 -37 99.75 99.87 2.8E-10 -38 1.3E-10 4.6E-10 4.9E-9 -39 3.4E-8 5.7E-8 1.0E-10 4.4E-8 -40 2.3E-6 3.0E-6 1.1E-8 4.0E-7 CL = Confidence level 29-July-2015 Steering Committee Meeting - Vidyo

Purchase of SFP receivers for switches in shore station 600 SFP receiver-only devices are ordered - OEsolutions type RR112SVX-SST - 456 devices for Italian shore station - 114 devices for French shore station - 30 spares Price: 118€ (excl. VAT) All devices had to be ordered as one set. Initially ordered and paid by Nikhef. Arrangement needed with CPPM for devices for French shore station (CPPM commitment) 29-July-2015 Steering Committee Meeting - Vidyo

Procurement of remaining optical components Below the remaining optical components still to be purchased by Nikhef. France: - EDFA type-C in DU-base for 6x DU 6 modules - are ordered - Add-and-Drop filters in the DOMs and DU-base for 6x DU 222 devices - are ordered - 18ch DWDM module in DU-base for 6x DU 6 modules - are ordered - 50-200GHz Interleaver in DU-base for 2x DU type-A 2 modules - are ordered - 1x2 splitter in DU-base for 6x DU 30 devices - are ordered - 1x16 splitter in DU-base for 6x DU 6 devices - are ordered Italy: - EDFA type-C in DU-base for 6x DU 18 modules - are ordered - 18ch DWDM module in DU-base for 6x DU 20 modules - are ordered - 80ch DWDM crate for shore station 5 crates - are ordered - Preamp- and booster-EDFA shore station (instead of RAMAN-1) 2x2 crates - are ordered - Part of optical amplifiers for shore station (Nikhef commitment) - wait till after deployment first DUs Almost all remaining components that are a Nikhef commitment are ordered now! 29-July-2015 Steering Committee Meeting - Vidyo

Test of JB12/001 for Italy during deployment operation 29-July-2015 Steering Committee Meeting - Vidyo

Test of JB12/001 for Italy during deployment operation Connection of the JB12/001 to the new installed CTF started in the night from Sunday 19-July / Monday 20-July. Support from optical team of Nikhef was arranged via a Skype group communication. Result of optical tests after deployment and connection of JB12/001: Power on of the infrastructure and electrical tests (resp.: INFN-LNS): ok At first instance the communication with the JB was not working. The preamp EDFA was not working due to a wrong LOS setting. Without using the onshore EDFAs the communication was working. Without EDFAs there is only a few dB optical margin so optical levels should be very close to expected levels otherwise it will not work! ok Changed LOS setting of preamp EDFA. Link working with both EDFAs active! ok Test of communications with the JB (resp.: INFN-LNS): ok The value measure to the ‘Preamp Monitor’ (power meter): -29,87dBm? expected: -36dBm The SFP receiver on the FMC board in the JB: -13 dBm expected: -16dBm Check status of all EDFAs using the output of the GUI: ok Input power received by EDFA-N using the output of the GUI: -15,7 dBm expected: -15dBm 29-July-2015 Steering Committee Meeting - Vidyo

Use of the redundant fiber in Pave penetrator The new penetrator from Pave for the DOMs has 2 fibers instead of 1 fiber. During DOM integration the extra redundant fiber can be used in case of a problem with the default fiber as long as the PMTs are not glued in the upper hemisphere. After gluing the fibers of the penetrator are not accesible anymore. To enable a swap of the penetrator fiber after the DOM is closed, an option could be to connect both fibers inside the DOM using a 50%/50% splitter in the DOM. This will allow to recover a DOM when during the period of testing and integration of the DOM in the DU, the used fiber would fail while the redundant fiber is still OK. Up to now this situation has not occurred. The failure of the penetrator fiber, experienced during the DOM integration of DU-2, would have occurred in both fibers if they would have been present. 29-July-2015 Steering Committee Meeting - Vidyo

Use of the redundant fiber in Pave penetrator The new penetrator from Pave for the DOMs has 2 fibers instead of 1 fiber. Pros Cons In case only the default fiber fails after the DOM is closed, the redundant fiber can be used so the DOM is not lost. Extra 3dB loss in every DOM due to the 50%/50% splitter. (No problem for DOM-> shore path, but problem for SC -> DOM path) Redesign of the fiber tray necessary to house the splitter and 2 extra splice protectors. Extra cost of splitter (~80€). More time needed to mount the optical components in the DOM. Three splices are needed inside the DOM instead of only one. More complex fiber routing inside the DOM. 29-July-2015 Steering Committee Meeting - Vidyo

Nikhef 400V/12V DC/DC Converters Meant to be used in the VEOC of the DU’s at the French site Design change - a DCR has been submitted on Google Drive A small prototype series needs to be produced and tested before production 18 DC/DC converters needed in September for first ORCA style DU in France For this DU a DC/DC converter of same type as for DU-1 will be used. 18 DC/DC converters of old type are back from CPPM and now at Nikhef. They still need to be pressure tested (when Paul Timmer is back from holidays). 29-July-2015 Steering Committee Meeting - Vidyo

Pre-deployment optical test of DU-1 & DU-2 Atten. 10dB Atten. 10dB Also needed: Power supply to power the DU (different for France and Italy!) ROV Test Cable to connet to the base container (different for France and Italy?) Small portable 19” rack to house all equipment 29-July-2015 Steering Committee Meeting - Vidyo