Resource Asset Registration Form – Business Rule updates

Slides:



Advertisements
Similar presentations
Introductory Circuit Analysis Robert L. Boylestad
Advertisements

ENE 428 Microwave Engineering
Lecture Notes 4 Per Unit System
TRANSFORMERS. TRANSFORMER PARAMETERS Turns Ratio (n) It is defined as the ratio of the number of turns in the secondary winding (N sec ) to the number.
Problem #2-8 A 480 – 120 V, 60 Hz transformer has its high voltage winding connected to a 460 V system, and its low voltage winding connected to a 24/32.8°Ω.
Today’s Topics 1- The per unit system 2-Transformer Voltage Regulation
Circulating Current – load switch open. Circulating Current load switch closed.
Problem Solving Part 2 Resonance.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
Resource Asset Registration Form Version 5.0 / 5.1 Changes for WGRs QMWG Presentation - July 9, 2012.
Alternating Current Circuits
Tubas ELECTRICAL NETWORK STUDY Prepared by : Omar Abu-Omar Ahmad Nerat Sameed banifadel PRESENTATION TO: Dr.MAHER KHAMASH.
RARF Frequently Asked Questions from Resource Entities Ed Geer RARF Workshop III 8/29/2013.
KD Relay Application: Compensator distance relay that provides a single zone of phase protection for all three phases. It provides tripping for phase to.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
Announcements Homework #4 is due now Homework 5 is due on Oct 4
August 30, 2012 Modeling Solar, Storage and Inverter based resources John Adams Resource Integration Planning Working Group.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
Resource Asset Registration Form Version 5.1 Update July 12, 2012.
AN- NAJAH NATIONAL UNIVERSITY OPTIMUM DESIGN AND PERFORMANCE FOR NABLUS NETWORK Submitted To : Dr. Maher Khammash Prepared By : Haitham Sharaf Ahmad Odeh.
ERCOT Wind Survey Leo Villanueva. Abilene Mc Camey Big Spring.
Unit 3 REACTIVE POWER AND VOLTAGE CONTROL.  BASIC REQUIREMENTS OF EXCITATION CNTRL  Excitation Current up to 10’000 amps  Input frequency range from.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
Tapped Tank Circuits Capacitive Tap Operation at resonance:
Lead from the front Texas Nodal 1 Registration Market Call Mar 27, 2009.
1 Update to NATF on Resource Registration Feb 2, 2010.
1 Submitting a RARF Art Deller, P.E. Supervisor, Model Administration New Generation Workshop November 4, 2014.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
UNIT-VII Static Series Compensators
Steady-State Working Group: Resource Modeling Discussion Wes Woitt September 27 th, 2011.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
Siemens PTI GIC Data File Contents Presented to PGDTF February 11, 2015.
Abilene Mc Camey Big Spring. Far West Abilene Area All the values are based on returned ERCOT survey results Total number of Wind Powered Generation.
True-False Questions. A magnetic core material may exhibit hysteresis or saturation but not both.
Part Three – Relay Input Sources
Nodal Planning Go Live Austin, TX February 3, 2011
An- Najah National University Rehabilitation of Nablus Electrical Network by adding a new connection point Submitted To : Dr. Maher Khammash Prepared By.
DCMT PRESENTATION DEVANSH KHARE ( )
Announcements Please read Chapter 6
Registration Data Collection September Window
GC0104 – Demand Connection Code (DCC)
Lesson 26: Transformers and Reflected Impedance
True-False Questions.
Agenda TSOG 8th November
Management Of Tulkarm Electrical Network
BASIC ELECTRICAL TECHNOLOGY DET 211/3
Analysis of the Amplitude and Frequencies of the Voltage Magnification Transients in Distribution Networks due to Capacitor Switching Mohamed Saied Electrical.
Resource Registration Update
GUJARAT POWER OF ENGINEERING AND RESEARCH INSTITUTE (104)
SWAMI VIVEKANAND COLLEGE OF ENGINEERING,INDORE(M.P)
ECE 476 POWER SYSTEM ANALYSIS
Reactive Power and Voltage Control
K. J. I. T institute of engineering 3-PHASE TRANSFORMER. PREPARD BY:-
Wind turbine technology
Passive Shunt Compensation
Design of Electric Power Systems and Utilities
DEC System Voltage Planning - June 2018
Distributed Generation (DG) Modeling Criteria
Protective Relaying Conference
Let’s Review Functions
Energy Conversion and Transport George G. Karady & Keith Holbert
Tubas ELECTRICAL NETWORK STUDY
7.2 Graphing Polynomial Functions
AC Drives Dr. Adel A. El-Samahy Department of Electrical Engineering University of Helwan.
Equations, Performance, Electrical Equivalent Circuits
PRACTICAL TRANSFORMER
Let’s Review Functions
Exercise 9 Power systems.
Let’s Review Functions
Presentation transcript:

Resource Asset Registration Form – Business Rule updates Site Information Tab CMZ now a required field If Generation load Split is 'Y', then Fixed Load Splitting % (for each ESIID's) must total 100 Unit Information Tab ALL: Unit Commercial date must be >= Site-In-Service Date WIND: Latitude of Farm & Tower must be >=25 and <=37 decimal degrees WIND: Longitude of Farm & Tower must be >=92 and <= 107 decimal degrees Parameters Tab ALL: HRL should be <= Real Power Rating (WARNING only) ALL: LRL must be zero for Private Use Network Sites Reactive Capability Tab ALL: Lagging MVAR must be >= MVAR

Resource Asset Registration Form – Business Rule updates Operational Parameters Tab ALL: Minimum On Line Time (Warning! If decimal value is submitted then Downstream System may round it UP) ALL: Minimum Off Line Time (Warning! If decimal value is submitted then Downstream System may round it UP) ALL: Hot Start Time - (Warning! If decimal value is submitted then Downstream System may round it DOWN) ALL: Intermediate Start Time - (Warning! If decimal value is submitted then Downstream System may round it DOWN) ALL: Cold Start Time - (Warning! If decimal value is submitted then Downstream System may round it DOWN) ALL: Max Weekly Starts - Min value 1, Max value is 85 (WARNING) ALL: Max Daily Starts - Min value 1, Max value 13 (WARNING) ALL: Hot-to-Intermediate Time - (Warning! If decimal value is submitted then Downstream System may round it DOWN) ALL: Intermediate-to-Cold Time - (Warning! If decimal value is submitted then Downstream System may round it DOWN)

Resource Asset Registration Form – Business Rule updates CC Transitions Tabs CC: Transitions From Offline required CC: Transitions To Offline required CC: Transitions must not skip configurations (eg: Offline to CC1_2) CC: Should have a Transition for each Configuration (WARNING) Line Data Tab Zero impedance lines within same substation must be modeled on the breaker/switch tab Line Ratings for zero impedance lines must be valid (eg: 9999 not allowed) Capacitor and Reactor Data Tab Connected Device must also be defined either in the Breaker/Switch or in the Transformer Tab This field should be unique (No two capacitors should have the same controlling breaker or switch) Warning if Desired, Minimum, and Maximum voltage fields values have a range not within 10% of the Voltage level of the Bus Bar being Regulated

Resource Asset Registration Form – Business Rule updates Transformer Data Tab Transformer High Side Manufactured Nominal Voltage must equal Voltage at Highest Tap - Step Size voltage to reach Nominal Tap voltage Error if the Transformer Resistance is less than 3 decimals, Warning if the Transformer Resistance is greater than 2 but less than 5 decimals Load Tap Changer must be 'Y' when AVR is ‘Y’ Error if Transformer Resistance to Reactance ratio >1, Warning if R/X >3 Load Data Tab Connected Device must also be defined either in the Breaker/Switch or in the Transformer Tab