GC0104 – Demand Connection Code (DCC)

Slides:



Advertisements
Similar presentations
AIRWORTHINESS ASPECTS OF AIRCRAFT LEASING
Advertisements

Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Overview of the Rotterdam Convention. Sub-regional Consultation for DNAs 2 Overview of the Rotterdam Convention Structure of the presentation Part 1 -Introduction.
October 8, 2003Ontario Energy Board1 Ontario Energy Board Update E.A. Mills Director – Regulatory Affairs Market Advisory Committee October 8, 2003.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Market Participant Experiences with Demand Side Bidding and Future Direction Linda Roberts, EA Technology Richard Formby, EA Technology.
T&SC Modification Proposal: Clarification of Outturn Availability
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
- 1 - Presentation reference Demand Side Bidding - an IEA Development Project for Competitive Electricity Markets Presentation to Metering Europe 2002.
European Developments Transmission Workgroup 3 rd May 2012.
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
SLIDE 1 Power Of Choice Metering Competition Pre-Final Rule Determination Workshop #2 24 th September 2015 FINAL.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
CAP169 BSSG 12/03/09. 2 Today  Recap on developments to date  Discuss and agree Terms of Reference for the group  Begin to work through proposal, capturing:
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Role of NRAs to incentivise DSOs
Chapter 8. Electrical Systems
GC0096 Electricity Storage Grid Code Requirements
Sub Station.
Agenda TSOG 8th November
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
GC0087 Frequency Response Provisions
Transposition of European Network Codes
Demand Connection Code
GSR022: Review of Security and Economy Required Transfer Conditions
GC0102 – System Management & Compliance
New transparency guidelines
Reactive Power Task Force
Exchange of information between Member States
INTERCONNECTION GUIDELINES
APEC 21st Century Renewable Energy Development Initiative
Review of System Alerts
Transmission Planning Code – Draft Document
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Demand Control Field Trials
Third package December,
Afsnit 7 - Afsluttende bestemmelser
Implementation of Connection Network Codes The French process
Grid Code Development Forum – 6 September 2017
Grid Code Review Panel 16th August 2017
37th IG Meeting South Gas Regional Initiative
KORRR INFORMAL STAKEHOLDER WORKSHOP
Storage Connection requirements
Topic Operational Information Exchange
Update on European Network Codes
EU-IPA12/CS02 Development of the Renewable Energy Sector
Implementation of Connection Network Codes The French process
Afsnit 7 - Afsluttende bestemmelser
EU Netcode Emergency & Restoration
Webinar on imbalance settlement
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Andrius Šimkus │ Energy Community Secretariat Tbilisi, 5 October 2018
Proposer: National Grid NTS Panel Date: 17th April 2014
Institutional changes The role of Bilateral Oversight Boards
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Transmission Planning Code Review
New EU Regulation on General Safety Implementation of Tyre Aspects
National Institute of Wind Energy(NIWE)
Presentation transcript:

GC0104 – Demand Connection Code (DCC) Antony Johnson & Rachel Woodbridge-Stocks 6 September 2017

Overview DCC Background High Level Structure of Work Scope & Proposed Solution General Requirements Short Circuit Requirements Reactive Power Requirements Disconnection and Reconnection Summary / Next Steps

Demand Connection Code Sets rules and requirements for different classes of new Transmission Connected Demand facilities, new Transmission Connected Distribution facilities, new distribution systems, including new closed Distribution Systems and new demand units used by a demand facility or a closed distribution system to provide demand response services to relevant System Operators and relevant TSO’s. Contributes to system security, facilitate use of renewable generation and allow more efficient use of the network and resources for the benefit of consumers Facilitates competition in the European internal electricity market. In GB it assumes that the requirements apply at the Grid Supply Point.

High Level Structure of Work Title I – Articles – 1 – 11 Subject Matter, Definitions, Scope, Application to existing demand facilities, Pumped Storage, Regulatory Aspects, Multiple TSO’s, Recovery of Costs, Public Consultation, Stakeholder Involvement, Confidentiality obligations Title II – Requirements for Transmission Connected Demand Facilities, Transmission Connected Distribution Facilities and Distribution Systems Chapter 1 – General Requirements (Transmission Connected Demand) Chapter 2 – Operational Notification Procedure Title III – Requirements of Demand Units / facilities to provide demand response services to the System Operator Chapter 1 – General Requirements (Demand Side Response) Chapter 2 - Operational Notification Procedure

High Level Structure of Work Title IV – Compliance Chapter 1 – General Provisions Chapter 2 – Compliance Testing Chapter 3 – Compliance Simulation Chapter 4 – Compliance Monitoring Title V – Applications and Derogations Chapter 1 – Cost Benefit Analysis Chapter 2 - Derogations Title VI – Non Binding Guidance and Monitoring of Implementation Title VII – Final Provisions

Title II – Technical Requirements Transmission Connected Distribution Facilities / Distribution System Article 12 - Frequency Range (Annex I) GC0101 Article 13 - Voltage Ranges (Annex II) GC0101 Article 14 - Short Circuit Requirements GC0104 Article 15 - Reactive Power Requirements GC0104 Article 16 - Protection Requirements GC0102 Article 17 - Control Requirements GC0102 Article 18 - Information Exchange GC0102 Article 19 - Demand Disconnection and Reconnection GC0104 Low Frequency Demand Disconnection Low Voltage Demand Disconnection Article 20 - Power Quality GC0102 Article 21 - Simulation Models GC0102

Proposed Solution Create a new section of the Grid Code “European Connection Codes” (ECC) which will duplicate the GB Connection Conditions. The ECC’s will include any additional technical requirements set out in the Demand Connection Code and if there are any conflicting requirements from the CC’s, they will not be included in ECC and the requirements set out in DCC will be included instead.

Title II – General Requirements

Article 14 – Short Circuit Requirements Article 14 of DCC does contain some requirements which on first appearance raise a number of questions particularly in relation to general practice and health and safety During the drafting process these issues were discussed at length and it was agreed and accepted that current GB practice can continue to apply unchanged without causing a conflict with DCC.

Article 15(1) – Reactive Power Requirements (1) Transmission Substation Transmission Connected Demand Facility or Distribution Facility/System Maximum Power Factor Ranges 0.9 Power Factor Lead (48% Maximum Import) 0.9 Power Factor Lag (48% Maximum Export) Example – A Connection Point to the Transmission System has an Import (Demand) of 100MW and an Export (Generation of 100MW). The Maximum Reactive Power Range that the TO can specify at the Connection Point cannot exceed 0.9 Power Factor Lead to 0.9 Power Factor lag (or 48MVAr import to 48MVAr export)

Article 15(1) – Reactive Power Requirements (2) This requirement is new to the GB Grid Code Scope exists for optimal solutions on reactive power transfer between the TO and Demand Facility / Distribution System but the reactive range cannot be greater than 0.9 Power Factor lead to 0.9 Power Factor lag. The Relevant TO may use other metrics other than power factor to set the equivalent ranges (eg %, p.u, Q/Pmax, MVAr etc). The requirements apply at the Connection Point For connection points shared between Power Generating Modules and Demand Facilities any derogation sought in relation to the Connection Point shall be met at that Point and defined in the relevant agreements.

Article 15(2) – (4) – Reactive Power Requirements Transmission Substation Transmission Connected Distribution System The TSO may require that Transmission Connected Distribution Systems have the Capability at the connection point not to export reactive power (at reference 1p.u) at an active power flow of less than 25% of the maximum Import capacity. Example – A Connection Point to the Transmission System has an Maximum Import Capacity (Demand) of 100MW. If the demand at that Connection Point falls to 25MW at a Point in time then there should be no export of Reactive Power at that Connection Point.

Article 15(2) - (4) – Reactive Power Requirements This requirement is new to the GB Grid Code Notwithstanding the requirements of Art 15 (1)(b) the Relevant TSO may require the Transmission connected distribution facility to actively control the exchange of reactive power at the connection point for the benefit of the entire system which shall be through joint collaboration between both parties. The Transmission Connected Distribution System Operator may require the TSO to consider its Transmission Connected Distribution System for Reactive Power Management. Query - How would Power Factor ranges be treated regarding unusual loads such as traction supplies or industrial sites such as arc furnaces etc?

Article 19 (1)(a)– (d) Low Frequency Demand Disconnection Comparison with GB Article 19 (1)(a)-(d) sets out the requirements related to low frequency demand disconnection functional capabilities. These requirements are already specified in GB Grid Code apart from Article 19(1)(c)(iv) – “the low frequency demand disconnection functional capabilities shall allow for operation from a nominal Alternating Current (‘AC’) input to be specified by the relevant system operator, and shall provide the direction of active power flow at the point of disconnection”. Proposal: When CC is replicated and forms ECC, add this requirement.

Article 19 (2)(a)– (f) Low Voltage Demand Disconnection Comparison with GB The GB Grid Code does not specify the requirement for low voltage demand disconnection nor does DCC mandate the requirement for low voltage demand disconnection. Proposal Low voltage demand disconnection requirements will not be stated in the GB Grid Code, however, should low voltage demand disconnection be required in the future it would need to be introduced via the GB Grid Code Governance process and consistent with the requirements of DCC.

Article 19(3)(4) Comparison with GB Code DCC Requirement GB Grid Code Article 19(3) – on load tap changer blocking As with Low Voltage Demand Disconnection, DCC does not mandate a requirement and will not be added to the Grid Code. Article 19(4)(a) – automatic reconnection following disconnection OC.6.7 – Emergency Manual disconnection. Article 19(4)(b) - synchronisation Synchronisation covered in Bilateral Connection Agreement and Relevant Electrical Standards (if it doesn’t cover demand it will be added). Article 19(4)(c) – remote disconnection. Not explicitly defined in the Grid Code but requirements may be covered on a site specific basis in the Bilateral Connection Agreement – Eg Auto Switching Schemes / Islanding Schemes. The general requirement will be added into ECC but the site specific requirements will be specified in agreements.

Questions/comments? The approach will be the same as in GC0100, GC0101 & GC0102. Anything we may want to consider with regards to Articles 14, 15 or 19?

Summary / Next Steps Most of the Title II DCC requirements in Articles 14, 15 and 19 are either new or map to existing GB Code requirements. For the new requirements it is considered that new text consistent with DCC would be applied in the GB Code. There are no National Parameters to select in the Articles discussed. Demand Side Response Services – (Articles 27 – 30) will be discussed at the next meeting (5th October). Title III: Chapter 1 – General Requirements will be discussed next month in GC0104. Title III: Chapter 2 – The Operational Notification Procedure is covered in GC0102. Only the technical requirements for new providers of DSR are covered in DCC. Information on where discussions for commercial aspects of DSR are taking place will be highlighted at the next workgroup meeting.