AASHTO 2016 NTPEP Annual Meeting May 9, 2016

Slides:



Advertisements
Similar presentations
DESIGN BUILD NATIONAL PERSPECTIVE by Dwight Horne FHWA.
Advertisements

How Much Do You Know? Consultants -- Test Your Knowledge! Civil Rights Requirements on Federal-Aid Transportation Agreements How Much Do You Know?
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
Utah Procurement Code Training
U.S. Pretrial Services and Probation Office Northern District of Ohio.
SFSP Contracting for Vended Meals Virginia Department of Health Special Nutrition Programs 2014.
Office of the Vice President for Research N ORMAN C AMPUS AND N ORMAN C AMPUS P ROGRAMS AT OU-T ULSA Subpart – C Pre-Federal Award Requirements and Contents.
Office of Purchasing and Contracts Procurement Outreach Training Level II - Module B Special Purchasing Methods.
Moving Ahead for Progress in the 21 st Century (MAP-21) – ROW Impacts Dianna Nausley, HQ RES Assistant Program Administrator Washington State Department.
National Bridge Inspection Standards (NBIS)
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Proprietary Product Certification Process Karen Byram Product Evaluation Administrator, FDOT.
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding Virginia Concrete Conference Richmond, VA March 6, 2014.
FHWA Life Cycle Costs Analysis and Pavement Type Selection Guidance Maryland Concrete 2014 Conference March 18, 2014.
EDUCATION SERVICE UPDATE
Division of Purchase and Contract North Carolina Procurement Conference Raleigh – April 24-25, 2012 New Legislation of Interest Sam Byassee, State Purchasing.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
Understanding M/WBE Compliance A Guide to Achieving Article 15-A Compliance in Human Services Contracting January 2015 Rev (1/2015) 1.
FHWA’s Implementation of the US DOT Contracting Initiative Pilot Program Thursday, June 18, 2015.
Office of Business Development Training
Partnership Agreements Delegation of SBA’s Contract Execution Authority to other Federal Government Agencies.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
Describing Agency Needs
Davis-Bacon, Related Acts, and Your Project Where you can locate the information needed to comply with Davis-Bacon and Related Acts 1.
FAR Part 2 Definitions of Words and Terms. FAR Scope of part (a)This part – (1) Defines words and terms that are frequently used in the FAR; (2)
Training Module: METHOD OF PROCUREMENT County APD Process Training November 16, 2007 California Health and Human Services Agency - Office of Systems Integration.
The Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards The OMB SuperCircular Information for FTA Grantees.
COMPETITION REQUIREMENTS
FAR Part 1 The Federal Acquisition Regulation System.
P ROPRIETARY P RODUCTS Promoting Innovation David Nicol, Director FHWA Office of Program Administration AASHTO Standing Committee on Highways October 15,
National Institutes of Health U.S. Department of Health and Human Services NIEHS SRP Annual Meeting November 18 – 20, 2015 George Tucker Chief, Grants.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
ERYN M H FLETCHER, PE TRANSPORTATION ENGINEER, FHWA Proprietary Items: Federal Requirements.
Federal Procurement of Energy-Efficient Products: Policy Requirements & Purchasing Tools Christopher Payne Lawrence Berkeley National Laboratory June 17,
Shariq Husain, PE INDOT Roadway Review Engineer Highway Design and Technical Support Proprietary Materials – Approval Process.
March 2013 CPO Training Jan Hall, Contracts Manager.
CHARTER REVIEW COMMITTEE Chatham. Charter Review Committee Section 8-2 Periodic Charter Review  At least once every five years a special.
Miscellaneous Property Insurance
Presented by: Fred Kessler Nossaman LLP
FAR Part 2 - Definitions of Words and Terms
Disadvantaged Business Enterprise (DBE) Each Bidder’s (or Proposer’s) Responsibility for Outreach Efforts.
Construction Oversight
Procurement Lobbying Legislation New York State Bar Association
LOCALLY ADMINISTERED PROJECTS
How Does a State Make an Award to Eligible Providers?
Session #2: Local Board Review of AEFLA Applications
Acceptance Process for Manufactured Products by Certification:
Department of Community Development
Georgia Fiscal Management Council
The Rulemaking Process
What PIs working on federally sponsored projects need to know.
The Office of Procurement PURCHASING TRAINING MAY 2018
© 2017 Universal Service Administrative Co.
AASHTO RESEARCH ADVISORY COMMITTEE PROVIDENCE, RI JULY 27, 2016
What PIs working on federally sponsored projects need to know.
Changes to Exempt Categories
Demystifying Article 15A – MWBE Requirements
Purchasing in the 21st Century
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding
2018 AASHTO Civil Rights Conference
The Necessary Criteria for a UNC Modification Proposal
State Innovative Transportation Councils AID Demonstration Program
Buy America and Utility Work
Protecting What We Love Building What We Need – The “H” Factor
SPR-B Research Coordination Webinar
COS RESEARCH ADMINISTRATORS MEETING
Ken Woodruff Civil Rights Program Manager FHWA Indiana Division
Right of Way Certification
STARTING FUNDING YEAR (FY) 2020
Presentation transcript:

AASHTO 2016 NTPEP Annual Meeting May 9, 2016 FHWA Policy Basics: Patented & Proprietary Products under 23 CFR 635.411 John Huyer, P.E. Contract Administration Group Office of Program Administration FHWA Office of Infrastructure

Patented & Proprietary Products - References Construction Program Guide Web Page – Patented & Proprietary Products: http://www.fhwa.dot.gov/construction/cqit/propriet.cfm Revised Q&A – 23 CFR 635.411: http://www.fhwa.dot.gov/programadmin/contracts/011106qa.cfm FHWA 11/30/2011 Memorandum: Information: Guidance on Patented and Proprietary Product Approvals http://www.fhwa.dot.gov/construction/contracts/111130.cfm FHWA 11/14/2012 Memorandum: ACTION: Patented & Proprietary Products: Database of FHWA Approvals http://www.fhwa.dot.gov/construction/contracts/pnpapprovals/121114.cfm Database - FHWA Approvals of Patented & Proprietary Products: http://www.fhwa.dot.gov/construction/contracts/pnpapprovals/approvals.cfm AASHTO APEL State Certified Products: http://apel.transportation.org/CertifiedProduct/Index

Competitive Bidding 23 U.S.C. 112 – “…construction … shall be performed by contract awarded by competitive bidding” Extends to the individual bid items in a contract. Sec. 112. Letting of contracts (a) In all cases where the construction is to be performed by the State transportation department or under its supervision, a request for submission of bids shall be made by advertisement unless some other method is approved by the Secretary. The Secretary shall require such plans and specifications and such methods of bidding as shall be effective in securing competition. (b) Bidding Requirements.— (1) In general.--Subject to paragraphs (2) and (3), construction of each project, subject to the provisions of subsection (a) of this section, shall be performed by contract awarded by competitive bidding, unless the State transportation department demonstrates, to the satisfaction of the Secretary, that some other method is more cost effective or that an emergency exists. Contracts for the construction of each project shall be awarded only on the basis of the lowest responsive bid submitted by a bidder meeting established criteria of responsibility. No requirement or obligation shall be imposed as a condition precedent to the award of a contract to such bidder for a project, or to the Secretary's concurrence in the award of a contract to such bidder, unless such requirement or obligation is otherwise lawful and is specifically set forth in the advertised specifications.

Competitive Bidding FHWA requires a justification to deviate from competitive bidding principles

Competitive Bidding Allowable deviations from competitive bidding principles include Other Methods (with FHWA approval) Special Experimental Project No. 14 Emergencies 23 CFR 635.411

23 CFR 635.411 Allows Federal Participation for Proprietary products when: Bid competitively with equally suitable non-proprietary products, or State certifies: Essential for synchronization, or No equally suitable alternative exists, or Experimental Use, or FHWA makes Public Interest Finding even though other suitable alternatives exist

Construction Proprietary Products issues can come up during construction!! If a Contract Change Order specifies a proprietary product, it must meet criteria in 23 CFR 635.411 for Federal participation. If criteria not met, funding for product must come from non-Federal sources (State DOT, Local Agency, etc.) Sec. 112. Letting of contracts (a) In all cases where the construction is to be performed by the State transportation department or under its supervision, a request for submission of bids shall be made by advertisement unless some other method is approved by the Secretary. The Secretary shall require such plans and specifications and such methods of bidding as shall be effective in securing competition. (b) Bidding Requirements.— (1) In general.--Subject to paragraphs (2) and (3), construction of each project, subject to the provisions of subsection (a) of this section, shall be performed by contract awarded by competitive bidding, unless the State transportation department demonstrates, to the satisfaction of the Secretary, that some other method is more cost effective or that an emergency exists. Contracts for the construction of each project shall be awarded only on the basis of the lowest responsive bid submitted by a bidder meeting established criteria of responsibility. No requirement or obligation shall be imposed as a condition precedent to the award of a contract to such bidder for a project, or to the Secretary's concurrence in the award of a contract to such bidder, unless such requirement or obligation is otherwise lawful and is specifically set forth in the advertised specifications.

Requirements Certifications Public Interest Findings Certified by State DOT No FHWA approval required FHWA can contest the certification State DOT option to accept Local Public Agency (LPA) certification Public Interest Findings FHWA Division Administrator approval required In some States, delegated to State DOT via Stewardship Agreement Can be redelegated to LPAs.

Certifications Must include: Should include supporting documentation. Statement by the appropriate State official certifying that the proprietary product is: Essential for synchronization, or That no equally suitable alternative exists Should include supporting documentation. Unique need being addressed Why other products cannot meet the need

Public Interest Finding Includes: Request from State DOT, including supporting information Approval by FHWA, which considers: Evaluation of equally acceptable products Benefit to public Additional costs, if any Duration and extent of approval Approval may be delegated to State DOT

November 30, 2011 Guidance http://www.fhwa.dot.gov/construction/contracts/111130.cfm Clarifies differences between Certifications and Public Interest Findings Clarifies approval authorities for States and FHWA Clarifies experimental use when participating in certain programs Provides transparency

Certifications vs. PIFs (Old process) Certification = Public Interest Finding No difference in process de facto process – Everything treated as a PIF State DOTs had to request FHWA approval to use proprietary products, even with certifications Problem – Process did not conform to language of regulation.

Certifications vs. PIFs (Old process) Industry Complaint: – Process too Restrictive Asserted that regulation kept innovative products from use Attempted legislative remedies that would have prevented FHWA from contesting certifications

Certifications vs. PIFs (New process) Certification ≠ PIF

Certifications vs. PIFs (New process) Guidance = regulation language Certification Essential for synchronization No suitable alternative Public Interest Finding Other alternatives exist

Experimental Use Proprietary products approved under special funding/evaluation programs do not require additional certifications or approvals under 23 CFR 635.411 Examples: Highways for Life (http://www.fhwa.dot.gov/hfl/ ) Every Day Counts (http://www.fhwa.dot.gov/everydaycounts/ ) Section 1304 of MAP-21 (http://www.fhwa.dot.gov/map21/qandas/qaipd.cfm ) 12. Do the requirements of 23 CFR 635.411 apply to products or processes that FHWA is promoting through special funding/evaluation programs (e.g. Highways for Life, Innovative Bridge Research and Deployment Program, Innovative Pavement Research and Deployment Program. etc)? No. Products which have been approved under special funding/evaluation programs do not need additional certifications or approvals under 23 CFR 635.411 for the use of patented or proprietary products. The FHWA's approval of funding for these evaluation projects is essentially a finding that it is in the public interest to proceed with the evaluation of these unique products. However, additional use of these products on other Title 23-funded projects that are not funded under these special funding/evaluation programs must comply with 23 CFR 635.411.

Experimental Use However, additional use of these products on other Title 23-funded projects not funded under these special funding/evaluation programs must comply with 23 CFR 635.411. 12. Do the requirements of 23 CFR 635.411 apply to products or processes that FHWA is promoting through special funding/evaluation programs (e.g. Highways for Life, Innovative Bridge Research and Deployment Program, Innovative Pavement Research and Deployment Program. etc)? No. Products which have been approved under special funding/evaluation programs do not need additional certifications or approvals under 23 CFR 635.411 for the use of patented or proprietary products. The FHWA's approval of funding for these evaluation projects is essentially a finding that it is in the public interest to proceed with the evaluation of these unique products. However, additional use of these products on other Title 23-funded projects that are not funded under these special funding/evaluation programs must comply with 23 CFR 635.411.

Transparency FHWA posts only FHWA-approved “Public Interest Findings” and Experimental Products on its website Sortable by: State Basis of approval Product name Product type Extent (project, statewide, region/district, etc.) Approval date Expiration Date

FHWA Approvals of Patented and Proprietary Products http://www. fhwa FHWA Approvals of Patented and Proprietary Products http://www.fhwa.dot.gov/construction/contracts/pnpapprovals/approvals.cfm FHWA Headquarters Contact: John Huyer, 651-291-6111

Transparency (as of 10/13/2015) FHWA posts ONLY FHWA approvals of Proprietary Products on FHWA website Total = 566 Experimental products = 34 Public Interest Findings = 532

Transparency (as of 10/13/2015) Other Lists of Specified Proprietary Products: APEL Certified Product Listing website Certifications, Experimental Products, & PIFs = 43 (AZ, CO, CT, ME, MD, MT, NY, OH) State DOT websites Certifications, Experimental Products, & PIFs = 370 (AK, CO, IN, MD, MO, MT, NC, OR, TN, WA, WI, WY) Not on any website Certifications, Experimental Products, & PIFs = 480 Total Products not listed on FHWA web site = 893 Total Products from all sources = 1459

Transparency FHWA recommends that State DOTs post their Proprietary Products to either: APEL Certified Product Listing website (http://apel.transportation.org/CertifiedProduct/Index ); or A publicly accessible website (State DOT website)

Transparency FHWA cannot require that State DOTs post their Proprietary Product information to either: The APEL State Certified Products website at http://apel.transportation.org/CertifiedProduct/Index ; or to A publicly accessible website (State DOT website) Unless FHWA successfully changes the regulation at 23 CFR 635.411 through the rule making process.

Transparency AASHTO APEL Site – State Certified Products 8 State DOTs (AZ, CO, CT, ME, MD, MT, NY, OH) http://apel.transportation.org/CertifiedProduct/Index

Transparency State DOT Web Sites (12) AK, CO, IN, MD, MO, MT, NC, OR, TN, WA, WI, WY Alaska - Public Interest Findings, Approved for Federal Funding Colorado - Findings in the Public Interest Indiana: Programmatic Proprietary Material Approvals Maryland: State of Maryland Patented and Proprietary Products Missouri - Proprietary Item Approvals Montana - Public Interest Findings and Certifications North Carolina - NCDOT Approved Proprietary Products Oregon - Office of Project-Letting Public Interest Findings Tennessee DOT - Proprietary Products Washington State - Current Blanket Proprietary Approvals Wisconsin – Approved Statewide Proprietary Products Wisconsin – Log Sheet of Patented or Proprietary Products Wyoming - Proprietary Products

Patented & Proprietary Products 23 CFR 635.407 vs 23 CFR 635.411 23 CFR 635.407(d) Use of materials made available by a public agency Manufactured Material Material acquired on a competitive basis Commodity Contract Requires use of State DOT-provided Material State DOT Develops Public Interest Finding, FHWA Division Concurs Federal eligible cost ≤ cost to State DOT (include this in contract) May place State DOT in competition with the private sector 23 CFR 635.411 Material or Product Selection Material acquired as a part of a highway construction contract under 23 USC 112 and 23 CFR 635 Subpart D Unit price includes cost to construct Federal Participation for Patented or Proprietary Products Competitive Bidding Certification Experimental Use Public Interest Finding

Questions and Comments

For further information please contact: John Huyer, P.E. FHWA Contract Administration Group (HIPA-30) (651)291-6111 John.Huyer@dot.gov The FHWA Division Office in your state