VOLTAGE PROFILE WORKING GROUP (VPWG)

Slides:



Advertisements
Similar presentations
Bill Blevins Management of the West-North Stability Limit Under the Nodal Market.
Advertisements

Page 1 ERCOT Project Status 1 ERCOT Dynamic Ratings METF March 29, 2012.
Goshen Area Bus Reconfiguration
Testing Workshop: Reactive Capability Testing
ERCOT Nodal Protocols Telemetry Requirements Proposal
TPTF Presentation Registration of PUN Facilities December 19, 2007.
1 New Resource Qualification Testing Sandip Sharma Supervisor, Operations Analysis New Generation Information Forum ERCOT Public November 4, 2014.
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
MP Failover DNS Option 1 for API Failover The same DNS structure that allows ERCOT to fail over services between sites can also be used to allow MPs to.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
Option 2 Summary Wes Woitt CenterPoint Energy 2010 SSWG Chair.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Managing of Limits during Loss of Analysis Tools/ EMS April 23, 2014.
1 State Estimator performance. 2 State of Technology Many metrics have been proposed for measuring State Estimator performance.. PI = min Σ( Z – h i (x))^
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Scheduling and Operating Transmission Devices in the Nodal Environment.
SGR issues associated with ICCP. 2 ICCP handbook update Split Generation Resources Split Generation Resources are modeled separately by each.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
Telemetry and State Estimator Standards Network Data Support Working Group June 16, 2006.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
1/14/10ERCOT ROS / CREZ OGRR1 Why is CREZ Unique? 15 GW of intermittent generation when ERCOT load is less than 30 GW 5000 miles of 345 kV circuits with.
PRS Workshop- NPRR755/NOGRR154 WAN communications of Critical Market Data and Agency-Only QSE Feb 29, 2016.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
Texas Nodal Electrical Buses and Outage Scheduling.
EDS 2 Early Delivery Systems Approach March 2007.
February 17, 2012 Regional Planning Group CREZ Shunt Switching John Adams Principal Engineer.
Nodal Planning Go Live Austin, TX February 3, 2011
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
ROS Presentation: Dynamic Scheduling and EEA Austin, TX September 10, 2009 Steve Isser Vice President and General Counsel Good Company Associates
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Scholarship America Dollars for Scholars
Southern Cross Transmission LLC Owner/Operator of a Merchant DC Tie
Market Trials Update NATF March 2,
LPGRR060, Load Profiling Guide Clean Up Related to LPGRR057
GIC System Model Workshop
Settlement Update Austin Rosel ERCOT February 27, 2017.
Announcements Please read Chapters 9, 10 and 11 HW 8 quiz today
Grid Operations Update
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
ERCOT Market Design & Operations
Southern Cross Transmission LLC Owner/Operator of a Merchant DC Tie
Set Point (GR enters the data)
Current FRRS Language & Explanation of Posted Data
Black Start Overview.
John Dumas Director, Wholesale Market Operations
Southern Cross Directives Planning Items
Phase Angle Limitations
Ancillary Service Trades and Ancillary Service Settlement
Reactive Power Task Force
Project Update and Summary of Project Priority List (PPL) Activity
Reflecting Losses in DR within ERCOT August 22, 2012
Modifications to Planning Charter
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
SINGLE LINE DIAGRAM.
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Presented by: LADWP November 14, 2017
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
EE362G Smart Grids: Architecture
MODELING DG IN BASE CASES
MODELING DG IN BASE CASES
TIPS- Nominations.
Daniel J Marquis PNM Transmission Engineering
Presentation transcript:

VOLTAGE PROFILE WORKING GROUP (VPWG) APRIL 18, 2017

Generator Voltage Set Point Communication (NPRR 776) TOPICS Generator Voltage Set Point Communication (NPRR 776) Examples of the Lost Visibility Problem Potential Solutions Discussed by VPWG 2

Generator Voltage Set Point Communication (NPRR 776) TOPICS Generator Voltage Set Point Communication (NPRR 776) 733 generating units in ERCOT Examples of the Lost Visibility Problem Potential Solutions Discussed by VPWG 3

NPRR776 specifies that TSPs shall telemeter via ICCP Real-Time voltage at POI and Voltage Set Point to the ERCOT KV POI – Real time voltage at the POI where the Generator’s Voltage Set Point changes will be observed Voltage Set Point – TSP-desired Generator setting to adjust voltage control to current ERCOT grid conditions These two data values per Plant will provide “common voltage visibility” between the TSP, ERCOT, the QSE and Generator so that everyone can see in real time how Generator is doing at holding the TSP’s voltage set point.

* Voltage Set Point will be applied here TSPs will submit NOMCRs for (1) the telemetered POI Voltage Measurement Point (it’s called “kv POI”) and (2) the Voltage Set Point. KV POI* KV POI * * Voltage Set Point will be applied here Plant #1 Plant #2

Generator Voltage Set Point Communication (NPRR 776) TOPICS Generator Voltage Set Point Communication (NPRR 776) Examples of the Lost Visibility Problem Potential Solutions Discussed by VPWG 6

Examples of the Lost Visibility Problem With all the different bus configurations, there are often multiple voltage measurement points at the POI. When Bus Outages occur, having only one voltage measurement point lead to problems. Either “common voltage visibility” is lost or point specified gives the wrong voltage (from the Grid, not the Generator).

“Common Voltage Visibility” is Lost Need Primary & Backup points KV POI Lost East Bus Out of Service on Outage Generator online (Tied to the other Bus) Set Point 354 kV

Wrong Voltage! Wrong Voltage is Given- Not Voltage from Generator, but Voltage from the Grid Breaker 11685 Out of Service Should be this one. ( Matches generator flow & voltage) Set Point 141 kV Generator online (Tied to the other Bus)

Generator Voltage Set Point Communication (NPRR 776) TOPICS Generator Voltage Set Point Communication (NPRR 776) Examples of the Lost Visibility Problem Potential Solutions Discussed by VPWG 10

Submit Multiple Voltage Measurement Points to ERCOT For double-bus configurations, TSPs submit NOMCRs for both a Primary POI voltage and a Backup POI voltage points. For Breaker and Half or Ring Bus configurations, may sometimes need to be 3 points submitted.

Accurate Metering Data Available anytime Generation is Online Submit Voltages from Generator's EPS Meter Channel where Available to the TSP (and coincide with the location of the POI) Accurate Metering Data Voltage Measurement Points Primary Available anytime Generation is Online Back-up

Logic could be at TSP or at ERCOT Use Logic, based on whichever Bus Sections are Out of Service, to Determine which Point gets sent to ERCOT for “KV POI” Logic could be at TSP or at ERCOT kV POI Set Point

Use Logic to Pick the Voltage Measurement Point ERCOT already has logic functions available in the ERCOT EMS that could be used to pick the appropriate point. TSPs would need to submit the logic instructions in NOMCRs before these could be set up in the ERCOT EMS. Since TSP’s have not previously used any Logic in NOMCRs, ERCOT has volunteered to provide training to those with an interest.

QUESTIONS?