Modular Value Stream Safety Map (MOD VSSM)

Slides:



Advertisements
Similar presentations
1 GEO Implementation Plan Task Team (IPTT) GEOSS 10-Year Implementation Plan Reference Document.
Advertisements

Software Quality Assurance Plan
Management Responsibility Procedure Tutorial. Introduction to Management Responsibility In this presentation we will discuss how to write a procedure.
5S Simplified 5S Audit Tool 5S Audit Training. Employ Improvement Initiatives 1 For training purposes only Freeleansite.com 5S Levels Of Achievement What.
Implementing ISO 9001 Our project plan Copyright ©2008 The 9000 Store.
December 3, 2014 Lauren Benishek, PhD & Sallie Weaver, PhD
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
Please take out your SAFETY CONTRACT. M&M’ S AND THE S CIENTIFIC P ROCESS.
FRACTIONS & SHAPES BY:. How many of these are colored red? * out of *.
Absolute Location: Where is your desk? Relative Location: Where is your desk? Cardinal Directions Relative Location of your Local Community using a Michigan.
World Health Organisation WHO Checklist 2011 Jacqui Blackwell.
SPDG Competition FY 2011 Management Plan. (f) Quality of the management plan. (20 points) (1) The Secretary considers the quality of the management plan.
Developing a Local Authority Policy for Safety Audit Jo Horton - Road Safety Engineer Kent County Council
MGT 437 OUTLET Become Exceptional/mgt437outlet.com FOR MORE CLASSES VISIT
MGT 360 Week 3 Learning Team Current Business Practices Audit To purchase this material click on below link
PSY 435 Week 3 Learning Team Employee Selection and Training Paper Write a 1,200- to 1,400-word paper in which you examine the role of industrial/organizational.

Continuous Improvement Project (A Guideline For Sponsors)
Jennifer Shanks – PASS Teacher
5 steps to align your talent strategy to the organisational strategy
High Level Process Overview
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Documentation.
Creating a Action Plan July 2016.
Project 4: Group Client Web Site
INSTRUCTIONS FOR NARRATION
Systems Analysis and Design
Training Course on Integrated Management System for Regulatory Body
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Instructions for Narration
CMS HIPAA Transaction Implementation Status Checklist
Management Responsibility
The PR team chronicles: month one
HCS 588 Competitive Success-- snaptutorial.com
MPA 533Competitive Success/snaptutorial.com
HCS 588 Education for Service-- snaptutorial.com
MPA 533 Education for Service-- snaptutorial.com
HCS 370 Teaching Effectively-- snaptutorial.com
HCS 370 Become Exceptional/ newtonhelp.com. HCS 370 All Assignments For more course tutorials visit HCS 370 Week 1 Introduction to.
HCS 588 Teaching Effectively-- snaptutorial.com
Management of Change Considerations
OHS Staff Introduction Training
G.D.P.R General Data Protection Regulations
TDI-Brooks Procedures
Name: _______________________________
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
INSTRUCTOINS FOR NARRATION
Process Map.
Distraction Tool.
Using Data to Make Decisions
Business Retention and Expansion
Information management and communication
PROCESS TRAINING.
Improvement Report This is a template to be used to summarize and report on an intervention in the work place using the OU/BWC developed tools to improve.
EMERGENCY PLANNING GUIDANCE FOR RAIL MARSHALLING YARDS
Health and Safety Policy   It is the Policy of Manor Scaffolding Limited to comply with the terms of the Health and Safety at Work act 1974 and subsequent.
Connecticut Core Standards for Mathematics
Achieving Certification
ERGO-ALERT INSERT PHOTO OF UNSAFE/IMPROPERWAY OF PERFORMING TASK
IEP REPORT OF PROGRESS AND ACHIEVEMENT K-12
2010 Audit Summary Results YEAR 100% Verified Failed Reduced 2010
Chapter 3: Project Integration Management
Technical Communication
Site (e.g., LARC Embakasi)
Emily Sobczak, CPA Partner Greene Finney, LLP
System Safety Regulation
Validation by Process Owner Validation by Project Leader
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Modular Value Stream Safety Map (MOD VSSM)

PURPOSE Mod VSSM is designed to look at a specific part of a longer process. Difference from traditional VSM: Allows the team to identify more specific problems in a task that may be otherwise be overlooked Inclusion of ergonomic/safety problems of the work task

PROJECT DETAILS Project Details An identifier for the project Specific team members Keep a record for timing of the project

CURRENT STATE Current State Describe the task and how it currently operates Problem statement should describe: What is wrong with the task The focus of the intervention Task Picture to show the current set-up

CURRENT STATE Ergonomic/safety concerns of the current process - Each one should be color coded for the severity Green is mild- limited concern Yellow- moderate concern, should be improved through this process Red- severe concern, needs to be improved immediately Below, document the current productivity level and how safety and production are affected by one another in the current task.

FUTURE PLAN Future Plan To be completed after changes for the current task have been discussed and a plan to implement them has been developed. Safety Improvements Include at least some of the concerns addressed in the current state section and how they will be improved Productivity Improvement Relate to the previous production level and clearly identify how it will be affected by the changes Task Picture of the improved task set-up

FUTURE PLAN Ergonomic/safety improvement - Should include at least some of the concerns addressed in the current state section and how they will be improved. - As before, each one should be color coded for the severity Communication Plan - How employees will be informed of the change Any documents needed to be created or altered to include the updated task Document who will be responsible for carrying out the communication plan and when it should be completed by Sustainability Plan How the process will be reviewed to ensure it is still operating with the new changes Could include but it not limited to an audit schedule or updated training documents Document who will be responsible for carrying out the sustainability plan and when it should be completed by