Sinclair Wash Stream Restoration Feasibility Study

Slides:



Advertisements
Similar presentations
WinTR-20 Course February Muskingum-Cunge Flood Routing Procedure in NRCS Hydrologic Models Prepared by William Merkel USDA-NRCS National Water Quality.
Advertisements

Culvert Inventory and Assessment Protocol 2015 Field Season.
Culvert Inventory and Assessment Protocol 2012 Field Season.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Development of the Controlled Assessment task for 2015 By: Helen Robertson FSC London 21 October 2013.
Rock Riffle Design Course
CHARACTERISTICS OF RUNOFF
Dan Vroom Ryan LaReau David Westlund Eric Eylander Team Bridge.
Examples for Mitigation Category 1 and 2 Streams.
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Processing Geospatial Data with HEC-GeoRAS 3.1
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
HEC-RAS.
Texas A&M University, Department of Civil Engineering CVEN 689 Applications of GIS in Civil Engineering Professor: Dr. Francisco Olivera Student: Brad.
Proposed Novato Creek Bank Stabilization Guidelines Questa Engineering Corp.
“We Bring Engineering to Life” 3-D Stream Restoration Design, Monitoring and Beyond David Bidelspach, PE - Stantec Consulting Greg Jennings, PE – NCSU.
Roughness & Mannings n-value
3-in-1 Stream Restoration Using AutoCAD® Civil 3D®, Map 3D, and Autodesk® Storm and Sanitary Analysis Heather Nagel Application Engineer.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
CH 7 - Open Channel Flow Brays Bayou Concrete Channel Uniform & Steady
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Source: %20T.%20Papanicolaou.pdf.
Habitat Restoration Division Coastal Program Partner For Wildlife Program Schoolyard Habitats Chesapeake Bay Field Office U.S. Fish and Wildlife Service.
The flow or movement of water
MA BF REFERENCE CURVES Objective Develop bankfull regional curves and equations for estimating bankfull width, mean depth, cross-sectional area, and discharge.
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
Field Instruction in Surface-Water Hydrology – Not a Summer Course Steve Custer Earth Sciences Montana State University Bozeman, MT
Uniform Open Channel Flow
Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye.
Salt Lake City – Las Vegas High Speed Rail – Alignment Study Student Engineering Associates.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Basic Hydraulics: Channels Analysis and design – I
RESIDENTIAL RAINWATER HARVESTING PROJECT ALTITUDE ENGINEERING, INC. PRESENTERS: HAYLIE BREWER, ERICA KIESOW,& BRETT HIGHTOWER DATE: APRIL 28 TH,
Anthony Alvarado, PE, CFM National Hydraulic Engineering Conference
Water Drainage System Harris County, TX
Bridges Reach analysis Fundamental tool for design
Innovative Designs for the 2013 Colorado Flood Damage
NAU International pavilion expansion
Bridge engineering.
Teaching Geomorphology in the Field
a design technique for achieving fish passage
Using GIS to Plan for and Mitigate Flooding on Tribal Lands
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
Uniform Open Channel Flow
Duncan Floodplain Feasibility Study
San Simon Dam Break Study CENE 476
Highway Drainage: Determining Flow Rates
Time of Concentration.
UH-Downtown White Oak Buffalo.
CTC 261 Hydraulics Storm Drainage Systems
Milltown Phase II Draft Restoration Plan
FEMA and Stream Restoration
Love Field Modernization Program
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Iowa’s River Restoration Toolbox Level 1 / Base Training
Module # 17 Overview of Geomorphic Channel Design Practice
CENE Old Town Frame Company
Module # 8 Channel Evolution Implications & Drivers of Instability
Kastanis- Existing Conditions
Module # 16 Restoring Functions to Streams Through Design
Bellemont Fire Station Addition
Eightmile Creek Barrier Assessment
Longitudinal Profile Survey for Successful Culvert Replacement
Scour Analysis on the west fork of the Duchesne River
Automated Techniques for Hydraulic Modeling Applications
Shaver Creek Permitting
CENE 486 CAPSTONE PRESENTATION APRIL 26th, 2019 ANNA KURN  
Presentation transcript:

Sinclair Wash Stream Restoration Feasibility Study CENE 486C April 28, 2017 Abdullah Alsalman Ahmad Alnemash Abdulrahman Alsabah Mohamed Alhassani

Acknowledgment Client & Technical Adviser: Mark Lamer Grading Instructor: Dr. Wilbert Odem

Project Stakeholders City of Flagstaff Arizona Department of Transportation Northern Arizona University Coconino County City of Flagstaff Community Arizona Game and Fish Department Mohamed

Project Overview Sinclair Wash Location Selected Reach Location Reach Current Condition Project Purpose Milton Rd NAU Skydome Highway I-17 Sinclair Wash Reach Location [1] Selected Reach Reach Aerial Image [2]

Reach Assessment Field Assessment Scour Pool [3] Open Valve Box in the Reach [4] Culverts in the Reach [5]

Geomorphic Assessment Table 1: Stream Classification Location I-17 East McConnell Drive Bankfull WIDTH (ft) 73.79 Channel Bottom Width (ft) 18.00 Bankfull DEPTH (ft) 5.25 Bankfull X-Section AREA (ft^2) 240.95 Width/Depth Ratio 14.06 Maximum DEPTH (ft) 5.33 WIDTH of Flood-Prone Area (ft) 10.67 Entrenchment Ratio 0.14 Channel Material Size (mm) 3.00 Water Surface Slope 0.01 Channel Sinuosity 1.3 Stream Classification F Rosgen Classification Method [6]

Reach Surveying Total Station Surveying Surveying Challenges Reach Topo Map [7]

Hydraulics Assessment Existing Conditions Model Challenges - Inlet Cross-Section Assumptions Table 2: Flow Rates in the Reach Storm Event 2-year 10-year 50-year 100-year Flow Rate (CFS) 130 350 670 890 Surveying The Reach [8]

Hydraulics Assessment Existing Conditions Model HEC-RAS Model I-17 Culvert FUT Culvert S Knoles Culvert Flow Profile View of 100-yr Existing Condition Model [9]

Hydraulics Assessment Existing Conditions Model Table 3: HEC-RAS Results for Current Conditions 100-year flow Station Flow Rate (CFS) Velocity (ft/s) Allowable Down Stream Velocity (ft/s) W.S Elevation (ft) 740 890 1.8 2.5 1002 650 2.1 532 2.2 430 2.3 380 1000 301 300 2.4 299 220 2.7 999.6 118 2.9 77 10 1.6 997.5 3

Hydraulics Assessment Conditions of the Section Unhealthy Section XS-220 XS-118 XS-77 Scour Pool Unhealthy Cross Sections at the Reach [10] Unhealthy Section in the Reach [11] Table 5: Culvert Velocities at Unhealthy Cross Sections Table 4: Velocities at Unhealthy Cross Sections Culvert Storm Event Exit Velocity (ft/s) Allowable Down Stream Velocity (ft/s) FUT 2 2.8 2.5 10 5.8 50 6.2 100 6.8 Storm Event Cross- Section Velocity (ft/s) Allowable Down Stream Velocity (ft/s) 2 year 118, 220 3.2 2.5 10 year 77, 118 2.6 50 year 2.7

Hydraulics Assessment Unhealthy Section Reference Reach Bankfull Characteristics Low Water Crossing Design Improved Section

Hydraulics Assessment Proposed Conditions Model Bankfull Bankful Location in Reference Reach [13] Healthy Reference Reach [12] Table 6: Reference Reach Bankfull Characteristics Reference Reach Bankfull Width (ft) Bankfull Depth (ft) Bankfull X-section Area (ft^2) San Francisco& S Lone Tree 23 1.5 44

Concrete Slab Thickness (inch) Roughness Coefficient (n) Hydraulics Assessment Low Water Crossing Design Design Consideration Table 7: Low Water Crossing Design Results Low Crossing Type Low Crossing Material Concrete Slab Thickness (inch) Roughness Coefficient (n) Unvented Ford Concrete 6 0.016 USDA Low Water Crossing Types [14]

Low Water Crossing Design Existing Crossing at the Reach Used for Flagstaff Urban Trail System Existing Crossing [16] Aerial Picture of the Existing Crossing [15] Existing Crossing [17]

Low Water Crossing Design Bankfull Characteristics Valley Gutter Low Water Crossing Design [18]

Roughness Coefficient (n) Low Water Crossing Design High Velocities Riprap Design Section View of Low Water Crossing Design [20] Table 8: Riprap Design Results Riprap Type D min (inch) D 50 (inch) D max (inch) Riprap Extend (ft) Riprap Volume (ft^3) Roughness Coefficient (n) Rock 3 6 12 115 0.035 Plan View of Low Water Crossing Design [19]

Hydraulics Assessment Proposed Conditions Model New Low Water Crossing Profile View of Proposed Conditions Model at 100-year Flow [21]

Allowable Down Stream Velocity (ft/s) Hydraulics Assessment Proposed Conditions Model Table 9: HEC-RAS Results for Proposed Conditions 100-year flow Station Flow Rate (CFS) Velocity (ft/s) Allowable Down Stream Velocity (ft/s) W.S Elevation (ft) 740 890 1.8 2.5 1002 650 2.1 532 2.2 430 2.3 380 1000 301 1.5 300 1.7 299 1.6 220 999.6 118 77 1.4 10 997.5 3 Table 11: Unhealthy Cross Sections Proposed Condition

Hydraulics Assessment Existing Conditions Model Vs Proposed Condition Model New Low Water Crossing FUT Culvert Profile View of Existing Conditions Model at 100-year Flow [22] Profile View of Proposed Conditions Model at 100-year Flow [23] Table 10: HEC-RAS Existing Conditions Model Results Table 11: HEC-RAS Proposed Conditions Model Results Storm Event Cross- Section Velocity (ft/s) Allowable Down Stream Velocity (ft/s) 2 year 118, 220 3.2 2.5 10 year 77, 118 2.6 50 year 2.7 Storm Event Cross- Section Velocity (ft/s) Allowable Down Stream Velocity (ft/s) 2 year 118, 220 1.6 2.5 10 year 77, 118 2.3 50 year 2.2

Project Schedule Task Expected Actual 1.0 Site Visit 11/21/2016 Table 12: Expected Project Schedule Vs Actual Project Schedule Task Expected Actual 1.0 Site Visit 11/21/2016 1.1 Filed Assessment 11/7/2016 1.2 Sinclair Wash Document 11/14/2016 1.3 Infrastructure Assessment 2.0 Data Collection 12/2/2016 1/2/2017 2.1 Surveying 11/26/2016 3.0 Data Analysis 2/20/2017 2/25/2017 3.1 Geomorphic Assessment 2/10/2017 2/12/2017 3.2 Hydraulic Assessment 2/17/2017 3.2.1 Existing condition Model 3.2.2 Proposed Condition Model 2/19/2017 2/22/2017 4.0 Design Alternative 3/20/2017 4/10/2017 4.1 Low Water Crossing 3/27/2017 4/1/2017 5.0 Project Management 5/9/2017 5.1 50% Report 3/2/2017 5.2 Final Presentation 4/28/2017 5.3 Final Report

Project Hours Breakdown Table 13: Predicited Project Hours Task Project Manager Hours Project Engineer Hours Lab Technician Hours Engineer in Training Intern Hours 1.0 Filed Assessment 3 5 15 20 35 2.0 Data Collection 1 85 90 55 3.0 Data Analysis 2 30 95 75 4.0 Design Alternative 25 10 5.0 Project Management 72 50 Total 80 130 190 220 235 855 Table 14: Actual Project Hours Task Project Manager Hours Project Engineer Hours Lab Technician Hours Engineer in Training Intern Hours 1.0 Filed Assessment 3 6 12 25 35 2.0 Data Collection 24 82 98 55 3.0 Data Analysis 2 28 39 95 75 4.0 Design Alternative 15 5.0 Project Management 72 52 36 8 Total 83 138 193 241 235 890

Project Implementation Cost Table 15: Predicited Project Costs Item Unit Quantity Unit Cost Total Earth Work 40 (yard) 1 8 $ per yard 320 $ Culvert Removal 18 (Square feet) 3 16 $ per square feet 288 $ Concrete Slab 230 (Square feet) 8 $ per square feet 1840 $ Riprap 20 (Square yard) 40 $ per square yard 800 $ Total Cost 3248 $

Project Cost Table 16: Predicited Project Costs Total 56,845 Personnel Classification Hours Rate ($/hr.) Cost ($)   Project Manger 80 145 11,600 Project Engineer 130 85 11,050 Lab Technician 190 65 14,300 Engineer in Training 220 70 13,300 Intern 235 17 3,995 Surveying Equipment 20 2,600 Total 56,845 Table 17: Actual Project Costs Personnel Classification Hours Rate ($/hr.) Cost ($)   Project Manger 83 145 12,035 Project Engineer 138 85 11,730 Lab Technician 193 65 12,545 Engineer in Training 241 70 16,870 Intern 235 17 3,995 Surveying Equipment 26 130 3,380 Total 60,555

References [1], [2] Google Earth Software. [3], [4] Photo Credit Abdullah Alsalman [5] [Online]. Available: https://directives.sc.egov.usda.gov/OpenNonWebContent.aspx?content=17833.wba [6] AutoCAD Drawing [7], [8], [9], [10], [11], [19] HEC-RAS Model [12] US Department of Agriculture Low Water Crossing Manual [13], [14] Photo Credit Mohamed Alhassani [15], [16], [17], [18] City of Flagstaff Storm water Management Design Manual [20] [Online]. Available: http://flagstaff.az.gov/index.aspx?NID=1809 [21], [22], [23] HEC-RAS Model [24] Flood Insurance Study [25] National Stream Flow Statistics Software [26] Previous Capstone Teams (Sinclair Wash Team 2016)

QUESTIONS?