P. Ferracin on behalf of the MQXF collaboration

Slides:



Advertisements
Similar presentations
LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and.
Advertisements

LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
DOE Review of LARP – February 17-18, 2014 Overview and Responses to Recommendations Giorgio Ambrosio 2/17/14 1.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
ASC 2012, 10/10/2012Test results and analysis of LQS03 – G. Ambrosio 1 BNL - FNAL - LBNL - SLAC Test Results and Analysis of LQS03 Third Long Nb 3 Sn Quadrupole.
Long Racetrack (LR) strategy – G. Ambrosio 1 LARP DOE review - FNAL, June 12-14, 2006 BNL - FNAL - LBNL - SLAC OUTLINE: LR R&D goals & plans Long Racetrack.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
HL-LHC: UPDATE ON MAGNETS
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
Support structure working group video- meeting P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez July 15th, 2014.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Triplet status and plans P. Ferracin, G. Ambrosio, M. Anerella, A. Ballarino, B. Bordini, F. Borgnolutti, R. Bossert, D. Cheng, D.R. Dietderich, B. Favrat,
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
HL-LHC/LARP: International Review of the Inner Triplet Quadrupole (MQXF) Design Executive Committee Report International Review Committee held at CERN.
LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 11 Introduction Giorgio Ambrosio LQS03 Readiness Review LBNL February 21, 2012 BNL - FNAL.
ASC 2012Nb 3 Sn IR Quadrupoles for HL-LHC – G. Sabbi 1 Nb 3 Sn IR Quadrupoles for HL-LHC GianLuca Sabbi for the LARP – HiLumi LHC Collaboration 2012 Applied.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Dan Cheng, Helene Felice HL-LHC Standards and Best Practices Workshop June 11-13, 2014 The US LARP Collaborative Effort Magnet Design and Engineering Tools,
HL-LHC Annual Meeting, KEK, 11/21/14WP3 Summary – G. Sabbi 1 Work Package 3 Summary GianLuca Sabbi, Ezio Todesco 4 th HiLumi LHC – LARP Annual Meeting.
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
QXF protection meeting, 4/29/14HQ High Miits Study – H. Bajas, G. Sabbi 1 HQ02 High MIITs Studies Preliminary findings and next steps Hugo Bajas, GianLuca.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
Logo area Preparation meeting for the International Review of the Inner Triplet Quadruples (MQXF) for HL-LHC P Ferracin, J.Ph. Tock, E Todesco
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Logo area Long magnet manufacturing plan and QC by US HL-LHC-AUP Dan Cheng For the MQXFA team MQXF International Review – CERN, June 7 th – 10 th, 2016.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
HL-LHC Magnet components and assemblies
MQXFPM1 and MQXFS1b Test Results
MQXF Design and Conductor Requirements
11 T Dipole Integration & Plans M. Karppinen
ESAC Review February 2013 CEA Saclay
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
MQXFS short model coils and structures fabrication
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Discussion session on day 1
Mechanical stability and QXF coil winding
MQXF Short Models Status and Plans
P. Ferracin and G. Ambrosio
Quench Protection Measurements & Analysis
SMC Design overview of the construction and project issues
Paolo Ferracin, Giorgio Ambrosio
MQXF updates P. Ferracin October 9th, 2014.
QXF schedule and milestones
MQXFS6 assembly and loading
Presentation transcript:

P. Ferracin on behalf of the MQXF collaboration MQXF update P. Ferracin on behalf of the MQXF collaboration WP3 Meeting CERN 10 December, 2015

Acknowledgments CERN BNL FNAL LBNL LASA A. Ballarino, H. Bajas, M. Bajko, B. Bordini, J.C. Perez, S. Izquierdo Bermudez, P. Fessia, P. Grosclaude, M. Guinchard, M. Juchno, F. Lackner, L. Oberli, H. Prin, J. Rysti, E. Rochepault, S. Sequeira Tavares, E. Todesco, G. Vallone BNL M. Anerella, A. Ghosh, J. Schmalzle, P. Wanderer FNAL G. Ambrosio, R. Bossert, G. Chlachidze, L. Cooley, E. Holik, S. Krave, F. Nobrega, M. Yu LBNL D. Cheng, D.R. Dietderich, H. Felice, R. Hafalia, M. Marchevsky, H. Pan, G. Sabbi, X. Wang LASA V. Marinozzi, M. Sorbi Tampere Univerisity of Technology T. Salmi Paolo Ferracin 10/12/2015 Paolo Ferracin

Outline Overview Short model program Prototype program Paolo Ferracin 10/12/2015 Paolo Ferracin

MQXF project schedule overview 2014-2017 Short model program: 5 CERN-LARP models First single coil test in May 2015 First magnet test in February 2016 2 LARP coils, 2 CERN coils 2015-2019 Prototype program: 2 (CERN) + 3 (LARP) prototypes, Coil fabrication starts in 06/2015 (LARP) and 01/2016 (CERN) First single coil test in 05/2016 (LARP) First magnet test in 03/2017 (LARP) and 05/2018 (CERN) 2018-2024 Series production: 10 (CERN) + 10 (LARP) cold masses Coil fabrication starts in 04/2018 (LARP) and 06/2018 (CERN) First magnet test in mid-2020 Paolo Ferracin 10/12/2015

Outline Overview Short model program Prototype program Paolo Ferracin 10/12/2015 Paolo Ferracin

Short model program First generation coil fabrication After winding/curing After reaction After impregnation Paolo Ferracin 10/12/2015

Short model program First generation coil fabrication 13 first generation coils fabricated 4 “non-usable” coils 001 Cu coil 2 cut coils: 101, 1 Coil 4 used for tooling improvement 9 “good” coils 3, 5, 103, 104 in first test 2, 6, 102, 201, 202 Splice problem in 102 2 models (MQXFS1-2) unless major issues from assembly incident Paolo Ferracin 10/12/2015

Short model program Second generation coil fabrication 15 2nd generation coils to be fabricated in 2016-2017 RRP: 4+6=10 PIT: 5 Fabrication just started (about 7-8 months after new cable geometry fixed) 105 in the reaction oven 106 being wound 7 being wound 3 models MQXFS3-4-5 Paolo Ferracin 10/12/2015

Short model program Single coil test First short coil tested in mirror 91% of current limits Paolo Ferracin 10/12/2015

Short model program Support structures Two identical structures assembled and pre-loaded with aluminium coils at LBNL and CERN Components instrumented with strain gauges Very good agreement Two additional pad/yoke with think laminations to be delivered in 01/16 Total of ~4 short structure available And 2 teams trained for assembly Paolo Ferracin 10/12/2015

Short model program Assemblies and tests MQXFS1_at (1st generation RRP coils) Test: Feb. 2016 @ FNAL MQXFS2 (1st generation RRP and PIT coils) Test: May/Jun. 2016 @ FNAL/CERN MQXFS3 (2nd generation RRP coils) Test: Jul./Aug. 2016 @ CERN MQXFS4 (2nd generation RRP coils) Test: Aug/Sep 2017 @ FNAL MQXFS5 (2nd generation PIT coils) Test: Apr/Jun 2017 @ CERN Paolo Ferracin 10/12/2015 Paolo Ferracin

Outline Overview Short model program Prototype program Paolo Ferracin 10/12/2015 Paolo Ferracin

Prototype program LARP 19 coils to be fabricated 7 of 4 m 12 of 4.2 m Fabrication started in 06/15 Single coil test in 05/16 3 prototypes MQXFA1-2: demos for US-HiLumi by 2017 MQXFSA3 (early 2019): value engineering for US-HiLumi MQXFA2+A3: prototype cold mass (mid-2019) Paolo Ferracin 10/12/2015

Prototype program LARP 2 coils (1 and 1b) being impregnated 1 coil (2) wound and cured 1st long coil with 2nd generation design (3) ready to be wound Procurement of first long structure in progress Paolo Ferracin 10/12/2015

Prototype program CERN 14 coils to be fabricated Cu: 2 RRP: 6 PIT: 6 From 01/16 to 06/18 Single coil test? 2 prototypes by the end of 2018 One with RRP coils, one with PIT coils Paolo Ferracin 10/12/2015

Prototype program CERN W&R tooling delivered to CERN R&I tooling by early 2016 Long oven by 04/16 Paolo Ferracin 10/12/2015