Tysan Foundation Limited

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Man- Basket for cranes Design Specifications Safety Work Instructions
Working Around/Under Loads
Boom Lift and Scissor Lift UNIVERSAL STUDIOS
Erecting steel structures Setting up or dismantling cranes or hoists
F&T Inc. OVERHEAD CRANE SAFETY.
MTRC Safety Alert issued on 31-May-2013 draw our highly attention for the innovative improvements. It is possible that a wire rope is able to come off.
Scissor Lift Safety Training
Heavy Concrete Construction Formwork
Drilling Contractor Safety
Present Procedure for cutting stuck casing on Drilling PLATFORM
Fall Protection Falls 4,628 fatal work injuries were recorded in the United States in deaths a week or 12 deaths every day 806 construction related.
Gate Latch The hook is inserted into the eye screw to latch.
Installation. Indoor Unit Installation Typical Installation.
Loading and Transporting Logs Section K of the logging code.
Subpart R Steel Erection
LIGHT-DUTY BELT FASTENER SYSTEMS
Lift Safety EZ Up 10’ Lift. Training Objectives  Identify lift hazards  Understand OSHA equipment requirements  Know how to inspect equipment  Take.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Contract No. : DC/2009/23 Harbour Area Treatment Scheme 2A Harbour Area Treatment Scheme Stage 2A - Upgrading of Preliminary Treatment Works at North.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
OSHA Subpart Q Concrete and Masonry Construction.
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Cranes and Slings 29 CFR and 184.
1 Cranes Module 13. 2Objectives After this module you should be able to – identify the most common crane hazards – take the necessary steps to avoid those.
By: Joseph Martinez University of Michigan Supervisor: Dave Pushka, NuMI Project 3Q120-M Quadrupole Magnet Transport.
Injuries in Nursing Homes u Nursing Homes are ranked fifth among all industries for low back injuries u 17 Injuries For Every 100 Full Time Workers u Nursing.
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Appendices Subpart R Steel Erection
Fall Hazards.
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Installation. Indoor Unit Installation Typical Installation.
Innovative Safety Initiative Award 2015 Presentation Construction of Home Ownership Scheme at Wang Yip Street West, Yuen Long HKHA Contract No
Learning from incidents Neal Stone Director of Policy & Communications British Safety Council Glasgow Caledonian University 10 December 2013.
Georgia Tech Safety and Health Consultation Program
Lifting Operations & Lifting Equipment. LOLER 98  Lifting Equipment must be of adequate strength & stability, as must the load itself  Lifting equipment.
Cranes and Slings 29 CFR and 184
MACHINE GUARDING. contents  What is a Guard?  Why are guards used?  Where should machine guards be used?  Hazardous Machine Areas  Hazardous Actions.
WORKER SAFETY INNOVATION AWARD OMCSA Worker Safety Innovation Award.
Safety Induction to the Lift & Escalator Industry Part 5 - Working Places and Safe Part 5 - Working Places and SafeAccess.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
THE NEW HOME APPLIANCE CLAMPS – GENERATION G. FIELD OF APPLICATION Carton Clamps or Domestic Appliance Clamps are used throughout the logistic chain to.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Blocking a b c d.
Procedure for erection and use of mobile tower scaffolds (Revision 1 – 5 th April 2011) Toolbox talk.
BEARING PILES: H-PILE. BEARING PILES  Structural element, a post or pile, which transfers the weight of a foundation to soil that can support it.  Ideal.
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
1 Unit 8: Part 2 - Mechanical handling NEBOSH Health & Safety Certificate.
The copyright to this material belongs to the Korea Occupational Safety and Health Agency. Unauthorized use and distribution are prohibited. If an individual.
Session 2: Hardware, Hoists, and Hitches
Height Work Safety.
REKORD Rekord is the new Silca key cutting machine for cylinder keys for doors, vehicles and cruciform keys.
Hire Different Varieties of Lifting Gear in UK
ERECT AND DISMANTLE STEEL TUBULAR SCAFFOLDING WITHIN OSHA GUIDELINES.
Working Around/Under Loads
Escalator Installation
Steel Erection 29 CFR 1926, Subpart R
Week 2 Experimentation TS Term 2.
HEAVY-DUTY FASTENER SYSTEMS
Slings and Rigging Overview
Personal Protective Equipment
الســقالات 29 CFR CFR تشير الإحصائيات بأن أكثر من 3 مليون عامل يعملون فى السقالات كل عام. كذلك تشير الإحصائيات إلى إصابة ما يزيد عن.
FALL PROTECTION.
السلامة أولاً SAFETY FIRST.
F&T Inc. OVERHEAD CRANE SAFETY.
Plant 2/3 Wire Machine In House Upgrade
Covanta Mid Atlantic Region Safety ALERT
Unit 8: Part 2 - Mechanical handling
CLEAR FLOOR TWO POST LIFT Operation instruction
Steel Erection 29 CFR 1926, Subpart R
Presentation transcript:

Tysan Foundation Limited Innovative Safety Initiative Award 2016 Category: Safety Operational Device Entry: Ground Operate Safety Clamp for Lifting of H-Pile (於地面操作的垂直吊運工字鐵安全夾鎖) Project: Foundation for the Home Ownership Scheme Development at Kai Tak Site 1G1(B) Contract No.:20140264 Tysan Foundation Limited

Innovative Ground Operate Safety Clamp for Lifting of H-Piles (於地面操作的垂直吊運工字鐵安全夾鎖) Advantages of Ground Operate Clamp for Lifting of H-Piles are tabulated as below: Old Method New Method Advantages Plate 1 Plate 3 The two wire ropes are served as double safety device to avoid pushing down the wire ropes to release the safety pin accidentally. Therefore, double safety device can ensure the H-Piles to be lifted securely without hazard of falling objects. Plate 2 Plate 4 Two separate wire ropes can be easily controlled by worker on ground level and therefore, prevent worker from working at height for rigging and unrigging of H-Pile. manual handling the lifting gears of H-Piles. Deployment of hydraulic working platform or man cage is not required, so eliminate the hazard of the crush to nearby objects within congested H-Piling construction area.

Innovative Ground Operate Safety Clamp for Lifting of H-Piles (於地面操作的垂直吊運工字鐵安全夾鎖) Special alloy steel for the lock pin(鎖針to provide maximum strength & durability Two separate wire (兩條獨立威也) ropes served as double safety devices for unlocking operation Safety Clamp (安全夾鎖) Lifting eye plate (吊孔鐵板) welded on H-Pile

Innovative Ground Operate Safety Clamp for Lifting of H-Piles (於地面操作的垂直吊運工字鐵安全夾鎖) Additional lifting eye plate (吊孔鐵板) welded on H-Pile for safety clamp operation 6mm Full Weld at both ends Dimension of steel plate: (150mm width x 20mm thickness) 3. 400mm from the top of the pile 4. No adverse effect on original H-Pile integrity. Plate 5 Illustration of the steel plate

Reference Diagrams (參考圖): Plate 6 Diagram 1 : Initial stage for erecting the H-pile Prevent relevant workers to work at height for attaching and detaching the lifting gears onto the H-Pile. Tag line will be used to control the movement of the H-Pile. Injuries can be avoided due to the hazard of crush of man-cages in congested H-piling construction area. Plate 7 Diagram 2 : Worker uses the tag line to control the movement of H-pile to designated location for subsequent pile driving.

Reference Diagrams (參考圖): Plate 8 Diagram 3 : Worker keeps using the tag line to guide the suspended H-pile to the designate sitting out location for subsequent pile splicing. Plate 9 Diagram 4 : Connection of H-pile After pile splicing, worker will pull down the two wire ropes to release the lock pin of safety clamp. The safety clamp will be disconnected from the H-pile.

~END~