Pacific Subregional Office, Suva Asian Development Bank

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

Ministry of Electricity and Energy General Authority for Rural Electricity Rural Energy Access Project OFF GRID RURAL ELECTRIFICATION Summary of The Project.
CLIMATE CHANGE ADAPTATION PROGRAM FOR THE PACIFIC (CLIMAP) Presented by Edy Brotoisworo, Sr, Environment Specialist Pacific Department, Asian Development.
Climate Investment Funds SCALING-UP RENEWABLE ENERGY IN LOW- INCOME COUNTRIES (SREP) Investment Plan for Solomon Islands June 2014 Government of Solomon.
Progress and Strategic Directions in the Pacific Brussels, 07 July 2014 Michael Bonte-Grapentin, Senior DRM specialist.
Donors’ Conference on Sustainable Energy for Kosovo
Cambodian Energy Sector Development Ministry of Industry, Mines and Energy Vietnam, Ho Chi Minh, 11 November, 2011 Greater Mekong Subregion Fifth Meeting.
COOK ISLANDS NAMA Presentation November 2013, Warsaw.
Outline of JICA’s Assistance prepared for
FIJI ISLANDS ENERGY CONSERVATION & EFFICIENCY PROGRAMMES.
1 Climate Change - A Challenge for the Pacific Nations The Hon. Tom Roper Board Member, Climate Institute Project Leader, Global Sustainable Energy Islands.
Hybrid Island Initiative for Integrating Renewable Energy in Pacific Islands Tadayuki OGAWA Japan International Cooperation Agency (JICA)
Sustainable Energy at the World Bank: Policies and Experiences Anil Cabraal Lead Energy Specialist Energy and Water Department The World Bank Norway-World.
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
1 An Investment Framework For Clean Energy and Development November 15, 2006 Katherine Sierra Vice President Sustainable Development The World Bank.
The NEP Workshop on Off-Grid Electrification in Myanmar Nay Pyi Taw, January 2015 South-South Cooperation to Power Rural Communities through Renewable.
Summary Outcomes 3 rd PIDF Summit 1-4 th September 2015 Grand Pacific Hotel Suva, Fiji Islands.
1 RENEWABLE ENERGY MARKET TRANSFORMATION PROJECT.
TIMELINE 2010: Fund established by COP decision 2011: Transitional Committee designs Governing Instrument 2012: Board established and begins meeting 2013:
1 Development of Renewable Energy Application in Vietnam Energy and Petroleum Department MINISTRY OF INDUSTRY.
Climate Change Financing: Selected Issues Track 6 Contribution.
MONGOLIA MONGOLIA Urban Sector Operation 4 June 2014 Tuul Badarch, Senior Project Officer (Infrastructure) Mongolia Resident Mission Asian Development.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
Sanjay Garg General Manager PGCIL/ Ministry of Power
GEF Familiarization Seminar Asian Development Bank Cécile L.H.F. Gregory Head Office of Cofinancing Operations Washington DC January 2012.
PWWA: FROM BENCHMARKING TO INVESTMENT Alexander Danilenko Port Moresby, Papua New Guinea.
Third Regional Steering Committee Meeting, Palau, 30 th July -3 rd August 2012 GEF Pacific IWRM Project Status Report.
Global Environment Facility Climate Change 14 May 2004 Siv Tokle GEF Monitoring and Evaluation Unit.
Highlights ( ) PEAG Meeting, Suva, Fiji November, 2015.
Update - GEF Pacific Alliance for Sustainability GEF Expanded Constituency Workshop September 2011 Honiara, Solomon Islands.
INTERNATIONAL RENEWABLE ENERGY AGENCY IRENA Renewables Readiness Assessment Comparative Analysis Silia Kilepoa Ualesi Suva, Fiji Islands 13 November 2015.
VANUATU Renewables Readiness Assessment Report November 2015.
Moving Forward with Clean Energy Priyantha Wijayatunga Principal Energy Specialist, Asian Development Bank
India Development Strategy (FY2012–FY2016) ADB India’s Country Partnership Strategy (2013 – 2017) ADB’s Long-Term Strategic Framework (Strategy 2020)
Renewables in the UK 21 st March 2016 Nikki Brain and Ben Pearce, Power Up North London.
W ORLD B ANK P ACIFIC ENERGY PROGRAM Pacific Power Association Annual Conference Nuku’alofa, Tonga 2 August, 2015.
European Union Energy Projects in the Pacific 25 th Annual PPA Conference Aug 2016, TONGA.
New Zealand Programme Expanding access to affordable, reliable and clean energy Martin Garrood & Merinda-Lee Hassall Pacific Power Association August 2016.
Introduction to the Japan Fund for the Joint Crediting Mechanism (JFJCM) 6 September 2016 Asia Pacific Carbon Forum 2016 Side Event in Jeju Island, Republic.
Pacific Subregional Office
Kenya’s INDC: Actions in the Energy Sector
Kazakhstan’s Economic Overview and ADB Operations 03 September 2017
GEF Support for Renewable Energy in SIDS and The Paris Agreement
Kamleshwar Khelawan, Senior Energy Specialist,
SIDS Lighthouses Initiative
Workshop on financing for renewable energy in SIDS December 2016
Solomone FIFITA, Deputy Director (Energy), SPC
Austrade: Pacific Renewable Energy Project Opportunities Webinar
ENERGY SECTOR PROGRAM AND PIPELINE - Sids
PROSTATE AWARENESS CAMPAIGN
CURRENT STATUS - ENERGY TRANSITION
TILOS: From energy sustainability on a small Greek island to a global disruption in the power sector Zisimos Mantas Business Development Officer, EUNICE.
Off-grid Electrification Department of Rural Development
World Bank Business on Renewable Energy
A Sustainable Energy Solution
Energy Sector Overview Federated States of Micronesia
Micronesian Energy Association (MEA) Green Energy Micronesia (GEM)
About Saint Lucia Located in the Caribbean AREA:238 sq. miles,
NS4960 Spring Term, 2018 China: Expanded Renewables
Challenges and opportunities on Islands’ decarbonisation
SUSTAINABLE ENERGY INDUSTRY DEVELOPMENT PROJECT (SEIDP)
Transforming Island Energy Systems
GCF business model.
ADB’s experience with financing renewable energy projects
GCF – EU Meeting ACCESSING GCF FINANCE 5 November 2018 | ACP, Brussels
Zambia’s roadmap towards 47% emissions reduction
Coping with Climate Change in the Pacific Island Region
Technical Press Briefing LIFE Sub-programme for Climate Action Commission proposal for a new LIFE Regulation ( ) 12 December 2011.
Photo by ADB ADB SUPPORT TO THE PACIFIC WATER SECTOR 9th Pacific Water Conference & Expo in Nuku’alofa, Tonga 9th August 2016 Stephen Blaik, Pacific Department,
Papua New Guinea and Asian Development Bank: “A Growing Partnership”
Presentation transcript:

Pacific Subregional Office, Suva Asian Development Bank 26/02/2018 Financing renewable energy in small island developing states (SIDS) Funding proposal with Pacific SIDS A Regional Renewable Energy Initiative with GCF Pacific Subregional Office, Suva Asian Development Bank Pacific Subregional Office

Brief Recap & GCF Collaboration ADB in the Pacific Renewable Energy Sector GCF application for Fiji 2015 – Fiji Urban Water Supply and Wastewater Management Project. Background Project due diligence Lessons learned moving forward Project Modalities for streamlining processing Donor niche Existing loan/grants in 8 Pacific countries Existing portfolio approx. $350 million 8 technical assistance grants - $16 million Pipeline 14 projects in 9 countries proposed investment $305 million Largest financier to energy sector in the Pacific

The Pacific Financing Facility Approach 26/02/2018 Multi-Tranche Financing Facility A Multi-Country MFF - overall umbrella program, delegating approval for specific projects that meet specific criteria. Technical Assistance - mobilize $5m in TA to assist clients to prepare detailed feasibilities.

The pacific regional program The proposed program will support a paradigm shift from diesel power generation to renewable energy in 8 Pacific Small Island Developing States (SIDS) and place the SIDS on a sustainable, climate resilient development pathway. Participating SIDS include Cook Islands, Federated States of Micronesia, Nauru, Papua New Guinea, Republic of Marshall Islands, Samoa, Tonga and Tuvalu. The proposed investments have all been identified by the SIDS as national priorities and (i) are all included under national energy sector development plans (ii) are included as priority areas to action under each SIDS intended nationally determined contributions (INDC’s) (iii) existing program in country

Cook Islands The subproject in the Cook Islands has been fully developed and is ready for GCF consideration. Cook Islands Renewable Energy Project (CIREP) – complementary initiative. Subsequent subprojects in the remaining seven SIDS will be prepared separately over a three year period and presented to GCF for financing consideration when fully prepared

Program’s comparative advantage 26/02/2018 GCF to address a number of regional barriers by supporting (i) improved sector reform on a regional basis, (ii) knowledge transfer between subprojects in a single program, (iii) improved procurement procedures from a centralized management unit, (iv) improved sector planning due to long term financing security, and (v) promotion of the private sector engagement across a program of activities. Private sector investments (2010-2016 = from 50MW to 112MW …… 2016-2021 = 112MW to 745MW) – requiring an estimated cumulative investment of US$2.7b The remaining 25% of investments are involved in expanding/upgrading distribution networks By number of power generation facilities solar is followed by biomass, hydro, wind and diesel – diesel in most cases doing the heavy lifting with the provision of base load.

For SIDS Lessons learnt from the transformation of the small island grids will provide new approaches in decarbonizing power systems which are directly translatable to other regions. Lessons learnt will be especially valuable to isolated load centers and small remote areas yet to be electrified. The program will support the renewable energy targets of many SIDS.

Renewable Energy Targets 26/02/2018 Country Current Renewable Energy % National Renewable Energy Target Annual Electricity Generation (MWh/annum) 1. COO 15.0% 100% by 2020 34,500 2. TON 13.0% 50% by 2020 55,400 3. RMI 0.4% 20% by 2020 101,000 4. FSM 5.0% 30% by 2020 72,000 5. TUV 29.0% 100% by 2025 5,200 6. NAU 3.2% 31,700 7. PNG 49.9% No target 217,250 8. SAM 26.0% 100% by 2017 140,000

Program’s contribution to targets   Current % Renewable Energy Renewable energy % after program Target % renewable energy Reductions in CO2 emissions (%) Reductions in CO2 (tCO2e/annum) 1. COO 15.0% 49.6% 100% by 2020 TBD 6,730 2. TON 13.0% 57.0% 50% by 2020 3. RMI 1.9% 5.7% 20% by 2020 5.3% 9,800 4. FSM Yap 18.0% 38.0% 30% by 2020 FSM Pohnpei FSM Chuuk FSM Kosrae 10.0% 5. PNG 49.9% No target 6. TUV 29.0% 85.0% 100% by 2025 31.5% 6,300 7. NAU 3.2% 8. SAM 26.0% 100% by 2017

Mitigation component The proposed mitigation investments will include the following: Solar power generation (33MW at approximately 14 sites in 5 SIDS); Wind power generation (10MW in 3 SIDS); Hydropower generation (19MW at 6 sites in 2 SIDS) Energy storage facilities in 7 SIDS; Improved energy access; 25 renewable energy mini-grids (3 SIDS) and solar home systems (2 SIDS).

Adaptation component 26/02/2018 The proposed adaptation investments will include the following: Yap State, FSM: floating solar panels on water reservoir to minimize evaporation and secure water supply; Kosrae State, FSM will relocate distribution lines which currently are located along the main island coastline and are being threatened by coastal erosion and storm-surge flooding; Samoa: flood diversion dam/hydropower reservoir to prevent flash flooding after cyclone activities, and All infrastructure supported by the investment program will incorporate climate proofing into technical design.

Program investment summary 26/02/2018 1. COO IPP support and Upscale Renewable Energy: 3MW battery storage 2. TON Energy Access: 6 mini-solar grids with battery storage, solar home systems Upscale Renewable Energy: 8MW grid-connected solar (6 sites), 6.6MW wind (3 sites), battery storage capacity of 9.8MW/ 21.1MWh 3. RMI Upscale Renewable Energy: diesel control upgrades, network strengthening, 2MW solar, battery storage 4a. FSM Yap Upscale Renewable Energy: 2 wind turbines (2x275kW), battery storage Adaptation/Upscale Renewable Energy: 1.5MW floating solar   FSM Pohnpei Upscale Renewable Energy: 9MW Pohnlangas Solar, 5.5MW Lehnmesi/Nankawad Hydropower, battery FSM Chuuk Energy access: 9 solar-diesel hybrid systems, solar home systems FSM Kosrae Upscale Renewable Energy: 0.5MW solar, Adaptation: 42km distribution grid replacement/relocation 5. PNG Energy access: converting 10 provincial diesel centers to renewable energy (hydropower or solar) 6. TUV Upscaling Renewable Energy: Solar power (3.85MW) and battery storage 7. NAU Upscale Renewable Energy: 8MW solar, battery storage 8. SAM Upscale Renewable Energy: Savaii Hydro (2MW), Savaii Wind Farm (2.75MW), rehabilitation of 2 hydropower plants damaged by Cyclone Evan (8MW) Adaptation: Alaoa Flood Control Dam and Hydropower (3MW)

Sector reform The program will include the following sector reform components: Sector planning (roadmaps and grid integration studies). Power utility management reform and capacity building. Tariff review and reform. Review and revision of regulatory and policy frameworks, and Promote private sector by identifying opportunities for independent power providers (IPP’s), providing transaction advice and designing guarantee products.

Paradigm shift Transition to low-carbon energy sector. The program will create a paradigm shift by supporting the SIDS to overcome the investment and technical barriers to higher integration percentages of renewable energy. Technical integration of intermittent renewable energy poses significant challenges on small grids managed by utilities with relatively low capacity. Private sector engagement. The program will support a paradigm shift of introducing private sector to support the structural shift towards renewable energy. This will be particularly important in SIDS which are unable to mobilize sufficient sovereign financing and require technical support to manage the transition.

Energy Access. There are currently significant disincentives for Pacific corporatized power utilities to increase customers for high cost diesel based generation centers. While grid extension should be a community service obligation, most Pacific countries lack budget to support rural electrification programs. Renewable energy for rural electrification offers a paradigm shift as low cost power generation will allow power utilities to extend grids with lower cost power generation (Hybrid models).

Program financing Subproject ADB Loan Grant Co-financing (grant) Gov GCF (grant) Total   1. COO 4 12 16 2. TON 7 5 3 50 72 3. RMI 2 15 20 4. FSM Yap 1 17 FSM Pohnpei 55 68 FSM Chuuk 23 25 FSM Kosrae 13 5. PNG 60 10 120 6. TUV 26 7. NAU 30 8. SAM 44 63 45 317 472

Estimated Implementation start and end date Program timeline   Country ADB Board Approval Estimated Implementation start and end date 1. COO Q1 2017 Q1 2017-Q1 2020 2. TON Q3 2017 Q3 2017-Q3 2021 3. RMI Q4 2017 Q4 2017-Q4 2021 4. FSM Q4 2018 Q4 2018-Q3 2023 5. PNG Q3 2018 Q3 2018-Q3 2023 6. TUV Q2 2019 Q2 2019-Q2 2022 7. NAU Q3 2019 Q3 2019-Q3 2022 8. SAM Q3 2019-Q3 2024

Cook island renewable energy project (cirep)

CIREP progam relevance Cook Islands is planning a paradigm shift away from sovereign financing to private sector investment to finance the structural shift to renewable energy generation. This is primarily due to ongoing restrictions on raising sovereign financing (familiar tale for SIDS) due to (i) the small size of the economy, and (ii) limited headroom for borrowing. Government is planning to increase private sector investment in renewable energy through both increased penetration of household solar and independent power providers (solar). However, the grid requires increased battery storage to manage the intermittent supply of before it can accept any additional renewable energy. The proposed paradigm shift to private sector investment is unlikely to occur without GCF grant support as Cook Islands cannot finance the required increase in battery storage

Cirep program complementarity In 2016, cofinancing from the Global Environment Facility (GEF) was mobilized to fund a 1 MW / 4 MWh Energy Storage System (ESS) to be installed on Rarotonga under the ADB CIREP. Lithium-ion battery technology has been specified for this subproject, which is referred to as the BESS subproject. With the 1 MW BESS subproject, total grid-connected solar capacity of just under 6 MW can be accommodated without compromising grid reliability on Rarotonga, but additional storage and other grid enhancements are a prerequisite for further solar PV capacity additions. The BESS subproject is just the first step in the transformation of Rarotonga electricity system: at least 60 MWh of additional energy storage will be required to meet the 100% renewable energy target on Rarotonga, and additional storage capacity is needed before further expansion of grid-connected solar PV capacity.

CIREP program complementarity Program covers a second stage of energy storage, referred to as the R- ESS-2 subproject. The R-ESS-2 subproject is being presented for possible financial support from the Green Climate Fund (GCF) which comprises two components: (i) 1 MW / 4 MWh for grid stability, to be installed at the diesel power station; and (ii) 2 MW / 8 MWh for load shifting capability, to be installed at the airport. This additional storage capacity will enable an additional 6 MW of solar PV capacity to be connected to the grid, after which electricity supply on Rarotonga will be approximately 50% renewable energy.

Pacific Subregional Office