Learning Curves.

Slides:



Advertisements
Similar presentations
Learning Curve.
Advertisements

Patterns of Responding on Schedules of Reinforcement The Cumulative Record Cumulative Responses Time Key measure of behavior: rate.
Investigating Properties of Linear Relations Cole buying a car.
Nonlinear and multiple regression analysis Just a straightforward extension of linear regression analysis.
Functions in general. Linear functions Functions in general Linear functions Linear (in)equalities.
Mathematical relationships By Dr. Ahmed Mostafa Assist. Prof. of anesthesia & I.C.U.
Chapter 5 Plotting Data Curve Fitting, Good Graphing Practices Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Copyright © Cengage Learning. All rights reserved. 6 Inverse Functions.
VLEKHO-HONIM 1 Exponential functions and logarithms.
3 CHAPTER Cost Behavior 3-1.
Learning Curves Chapter Learning Curve Analysis Developed as a tool to estimate the recurring costs in a production process – recurring.
Productivity and Learning Curves
Differential Equations There are many situations in science and business in which variables increase or decrease at a certain rate. A differential equation.
Performance Improvement  Learning (Improvement of Performance) =  Reduced Production Time and/or Reduced Errors  Learning = Individual + Organizational.
6-1 Slope Objectives 1. find the slope of a line 2.use rate of change to solve problems.
DEPARTMENT OF STATISTICS  What are they?  When should I use them?  How do Excel and GCs handle them?  Why should I be careful with the Nulake text?
STUDENTS WILL BE ABLE TO: CONVERT BETWEEN EXPONENT AND LOG FORMS SOLVE LOG EQUATIONS OF FORM LOG B Y=X FOR B, Y, AND X LOGARITHMIC FUNCTIONS.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Supplement 7 Learning Curves.
Intermediate Systems Acquisition Course Produce/Deploy/Support: Production Manufacturing Page X of Y Welcome to Production Costs and Quality On average,
Lesson 6 & 7 Unit 5. Objectives Be able to find equations for direct variation: y = kx Be able to find equations for inverse variation: y = k/x Be able.
Law of Variable Proportions
IENG 217 Cost Estimating for Engineers Product Estimating.
Correlation and Regression Stats. T-Test Recap T Test is used to compare two categories of data – Ex. Size of finch beaks on Baltra island vs. Isabela.
Warm Up Solve each proportion The value of y varies directly with x, and y = – 6 when x = 3. Find y when x = – The value of y varies.
Fitting Equations to Data Chapter 7. Problems Classwork: 7.1, 7.8, 7.13, 7.22 Homework: 7.2, 7.9, 7.16, 7.23, 7.28.
Bingo Answers Fill in all 25 spaces on your Bingo card, using any of the given answer choices. Do NOT Repeat any choices. y = 2x + 4 y = -1/3 x + 6 y.
Plotting in Excel Ken youssefi Engineering 10.
Plotting in Excel KY San Jose State University Engineering 10.
Department of Mathematics
Cost Estimation & Cost Behaviour
Fitting Equations to Data
FW364 Ecological Problem Solving Class 6: Population Growth
Warm Up Determine for y2 + xy + 3x = 9.
Algebra 1 EOC Summer School
Graphing.
Basic Estimation Techniques
Direct Variation Lesson 8 Alg 2
Concept.
XY Scatter Plots in Excel 2007
Relationships and Graphing
Lesson 3.5 Average Rate of Change (exponential functions)
CHM 103 Sinex The Best-Fit Line Linear Regression.
Chapter 10 Re-Expressing data: Get it Straight
Mathematical Modeling Making Predictions with Data
Cost estimation and behaviour
Proportionality to powers In many situations, one variable may be directly proportional to a power of the other variable. For example, the kinetic.
Algebra November 12, Direct Variation Objective:
What is it and how do I know when I see it?
Introduction Exponential equations are equations that have the variable in the exponent. Exponential equations are found in science, finance, sports, and.
DRILL Given each table write an equation to find “y” in terms of x.
Motion is typically determined by use of stationary reference points.
Continuous Growth and the Natural Exponential Function
Learning and The Learning Curve
Coefficient of Determination
Company Name 7.1- Inverse Variation.
What is it and how do I know when I see it?
What is it and how do I know when I see it?

Direct Variation.
Motion Graphs.
What is it and how do I know when I see it?
What is it and how do I know when I see it?
Hitting the Slope(s).
What is it and how do I know when I see it?
What is it and how do I know when I see it?
What is it and how do I know when I see it?
What is it and how do I know when I see it?
What is it and how do I know when I see it?
REGRESSION ANALYSIS 11/28/2019.
Presentation transcript:

Learning Curves

Learning Curve Introduction Learning Curves are used to estimate the time saving that is experienced when performing the same task multiple times The greater the amount of labour involved in the task, the greater the saving experienced with each iteration

Learning Curve Introduction Clearly manufacturing a ship or airline has a steeper learning curve (greater savings per iteration) than an automated process of making widgets (e.g. previous figure which is steep - ships) Two predominant learning curve theories (though there are more) Unit Theory Cumulative Average Theory Both will be explained using the Canadian Frigate program from the late 1980s and early 1990s

Unit Theory Learning Curve The theory states that the cost decreases by a fixed percentage as the quantity produced doubles The following table reflects an 80% learning curve which means the cost decreases by 20% for each doubling of production (multiply by .8) Unit Number Cost 1 $100 2 $80 4 $64 8 $51.2 16 $40.96 Note: Examples from Cost Estimation by Mislick and Nussbaum

Unit Theory Learning Curve Unit Theory equation Yx = A * xb where: Yx = the cost of unit x A = cost of the first unit x = the unit number s = the slope of the learning curve = 2b Cost of 2x = (cost of x)*s Substituting A*xb for cost & rearrange s = A*(2x)b/A*xb = 2b Using logarithms: b = ln(s)/ln(2)

Unit Theory Learning Curve From the previous example: A=100 Slope of learning curve = 0.8 0.8 = 2b Using logarithms: ln(0.8) = b * ln(2) b = ln(0.8)/ln(2) = -0.3219 Therefore, cost unit x = 100 * x -0.3219 For x = 4, cost = 64.0 For x =3, cost = 70.2

Unit Theory Learning Curve Canadian Frigate Example Ship number Number of hours to build ln(ship number) ln(hours) 1 5,228,212 0.00000 15.46958 2 4,651,262 0.69315 15.35265 3 3,892,713 1.09861 15.17462 4 3,366,301 1.38629 15.02933 5 2,959,776 1.60944 14.90062 6 2,538,396 1.79176 14.74704 7 2,326,265 1.94591 14.65977 8 2,218,333 2.07944 14.61227 9 2,142,963 2.19722 14.5777

Unit Theory Learning Curve Yx = A * xb To determine “b”, use logarithms, i.e. ln(Yx) = ln(A) + b*ln(x) “b” slope of this equation (learning slope = 2b) Graph using Excel Scatter with Markers after converting your costs (hours in this case) and number of units using natural logs Under Chart Tools, select Trendline – more trendline options Then select display equation on chart and display R-squared value on chart

Unit Theory Learning Curve From the chart equation, the slope is -0.4482 which = b From before, if s = 2b, then s = 0.7330 or a 73.3% unit learning curve which is steeper than typical but reasonable given SJSL’s inexperience

Cumulative Average Theory Subtly different from Unit Theory Cumulative average theory is average cost of groups of units while unit theory is based on individual unit cost Therefore, for cumulative average theory (using the previous 80% example): The average cost of 2 units is 80% of 1 unit The average cost of 4 units is 80% of 2 units The average cost of 50 units is 80% of 25 units Doubling your production reduces your average cost by your learning curve (80% for this example)

Cumulative Average Theory Cumulative Average Theory equation YN = A * Nb where: YN = the cumulative average cost of N units A = cost of the first unit N = the cumulative number of units produced As before: s = the slope of the learning curve = 2b Using logarithms: b = ln(s)/ln(2) Cumulative Average Theory usually used for production lots where batches of units are made

Cumulative Average Theory Canadian Frigate example again: Ship number Number of hours to build Cumulative Quantity Cumulative average hours ln(ship number) ln(cum avg hours) 1 5,228,212 0.00000 15.46958 2 4,651,262 4,939,737 0.69315 15.41282 3 3,892,713 4,590,729 1.09861 15.33955 4 3,366,301 4,284,622 1.38629 15.27054 5 2,959,776 4,019,653 1.60944 15.20671 6 2,538,396 3,772,777 1.79176 15.14332 7 2,326,265 3,566,132 1.94591 15.08699 8 2,218,333 3,397,657 2.07944 15.0386 9 2,142,963 3,258,247 2.19722 14.9967

Cumulative Average Theory From the chart equation, the slope is -0.2244 which = b From before, if s = 2b, then s = 0.8560 or a 85.6% unit learning curve which is less steep than unit theory as expected

Unit vs Cumulative Average Theory Cumulative average theory is a less steep curve such that unit learning is always below it Cumulative average is less responsive to variation in costs from unit to unit since it is based on averages Use cumulative if initial production is expected to have large cost variation unit to unit

Unit vs Cumulative Average Theory For Frigate example, which learning curve is better? Hard to tell visually, I used stats, went with unit R2 for unit = 0.9562 vs cumulative = 0.9355 P-value (not shown) unit=5.2x10-6 cum=2.0x10-5