P. Paolucci G. Pugliese M.Tytgat

Slides:



Advertisements
Similar presentations
Project Manager P. Paolucci deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo.
Advertisements

Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.
Data Quality Monitoring for CMS RPC A. Cimmino, D. Lomidze P. Noli, M. Maggi, P. Paolucci.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
RPC Readiness for Data-taking RPC Collaboration 1.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
RPC project status report RPC IB meeting 29 march 2011 Pigi Paolucci.
CMS Databases P. Paolucci. CMS DB structure HLT-CMSSW applicationReconstruction-CMSSW application FronTIER read/write objects.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
Gnam Monitoring Overview M. Della Pietra, D. della Volpe (Napoli), A. Di Girolamo (Roma1), R. Ferrari, G. Gaudio, W. Vandelli (Pavia) D. Salvatore, P.
1 st RPC General Meeting 29 March 2011 Pigi Paolucci RPC project status.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
Databases in CMS Conditions DB workshop 8 th /9 th December 2003 Frank Glege.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
Data Quality Monitoring for the CMS Resistive Plate Chamber Detector Anna Cimmino etc etc etc Università degli Studi di Napoli “ Federico II ” & INFN of.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
4 st RPC General Meeting 28 June 2011 Pigi Paolucci RPC project status.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
CMS ROC Report Patricia McBride May 26, 2005.
University of Wisconsin
RPC Data Certification
Atlas: Upgrade Phase I Massimo Della Pietra.
Japan Participation in Phase-II TDAQ Upgrade
Electronics for RPC Upscope
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
Barrel RPC Conditions Database
To do list production organization and commitments
Pierluigi Paolucci - I.N.F.N. Naples
The IFR Online Detector Control at the BaBar experiment at SLAC
23 Barrel chambers and 12 Endcap chambers
RPC Detector Control System
B904 Status Report by Fred B.
RPC Detector Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
DQM for the RPC subdetector
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

P. Paolucci G. Pugliese M.Tytgat RPC ESP 2011 P. Paolucci G. Pugliese M.Tytgat

ESP 2010 ESP needed = 178 months ESP declared = 307 months ESP accepted = 278 months Accepted 56% more than needed ! 2010 ESP needed includes only the present system Upscope tasks were present but at zero About 64 months were pledged for the upscope 17/01/11 ESP meeting

What we did for the 2011 (I) Review the ESP tasks procedure: Using 2010 data as starting point Working in harness with the old and new LV2 and LV3 coordinators Involving Institution leaders in the analysis of the 2010 data and in the approval of the 2011 ESP Review all the “wrong” 2010 estimations: Hardware chamber: 0 .v.s 9 LV2 and LV3 management: 38 .vs. 18 Prompt analysis: 45 .vs. 12 17/01/11 ESP meeting

What we did for the 2011 (II) Simplify extremely the task structure: Adding all the tasks really needed by the project Using friendly task names Helping institution leaders in the task assignments and then in pledging (future) Monitor constantly the ESP at the RPC IB (future) Keep constant (around 200) the months needed of the present system. Add the upgrade tasks (installation in the 2013) 17/01/11 ESP meeting

2011 summary From 20 to 34 ESP tasks 17 for the present system 12 for the upgrade 4 for LV2 management We increased few crucial item thanks to the 2010 experience and reduced the # of shits (from 4 to 3 shiters per day) Present system ESP needed = 200 months (15 FTE) Upgrade ESP needed = 70 months (7 FTE) Can CMS consider the RPC Operation Manager a central shifter ? 17/01/11 ESP meeting

17/01/11 ESP meeting Project Activity Task Needed (months) Fte Muon-RPC Detector Hardware Technical coordinator 8,00 0,67 Chamber 10,00 0,83 Electronics 3,00 0,25 Services Electronics and DAQ Power System DCS-DSS Electronic configuration Gas Gain Monitor DAQ and online DB 4,00 0,33 Software and DQM DPG coordinator DQM 12,00 1,00 DCS & WBM PVT 6,00 0,50 Simulation Database Prompt Analysis 36,00 Operation Run coordinator Operation Manager shift* 11,00 0,92 CAF shift* Data Manage shiftr* Upgrade Software Bakelite production and test Gap production Chamber design 2,00 Chamber construction 24,00 Chamber test at 904 7,00 0,58 Front-end electronic Trigger electronic R&D at high eta 0,17 Simulation at high eta Management LV3 70,00 7,17 200,00 14,67 270,00 21,83 17/01/11 ESP meeting

Conclusions We learned a lot for the 2010 experience. The new ESP procedures has been approved by the RPC IB. 2011 ESP needed should be very close to what we really need for the operation of the project. Upgrade has been included. Upgrade needed will increase of about 30% in the 2012. 17/01/11 ESP meeting