Solaris status Wojciech Kitka, on behalf of CS&IT group and whole Solaris team Touluse,

Slides:



Advertisements
Similar presentations
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Advertisements

Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
2002 November 16 CLS PROJECT STATUS M.S. de Jong Project Leader November 16, 2002 Annual Users’ Meeting.
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
E163: Laser Acceleration at the NLCTA Eric Colby, ARDB For the E163 collaboration Safety Overview Committee Meeting Sept. 19, 2002.
AS Diagnostic Collaboration Mark Boland
Low Emittance RF Gun Developments for PAL-XFEL
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
RREPS'11, Egham (UK) Status of Beam Loss Detector Tests and Developments at PETRA III & ESRF Gero Kube DESY (Hamburg) Introduction: PETRA III Extension.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
ELECTRON MOVING AT CONSTANT VELOCITY
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
Status of Solaris Adriana I. Wawrzyniak On behalf of Solaris Team
ARW 2013 Opening Melbourne, Australia, 15 April 2013 Dr Mark Boland Principal Scientist Accelerator Physics Australian Synchrotron ACAS Deputy Director.
Questions to automatic workshop. 13 BLs financed Another 5 under discussion MAX IV status: Injector linac running since May GeV ring under commissioning.
Alignment of Insertion Device at Siam Photon Source
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
UniDo EPICS Meeting 2003 Status of the DELTA Control System Elke Kasel June 2003.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Tango Meeting Grenoble September 5/ Claudio Scafuri, Elettra ELETTRA Status Claudio Scafuri
Operation Status of the RF Systems and Taiwan Photon Source
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Click to edit Master subtitle style 37th ICFA Advanced Beam Dynamics Workshop on Future Light Sources Status of Beam Loss Detector Tests and Developments.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
NATIONAL SYNCHROTRON RADIATION CENTRE SOLARIS JAGIELLONIAN UNIVERSITY, KRAKOW, POLAND Piotr Goryl Tango Collaboration Meeting, Elettra,
Report Technical Director Storage-Ring-Installation Completed
Operations Machine Simulator.
CALIFES A proposed electron beam test facility at CERN
National SYNCHROTRON Radiation Centre SOLARIS Jagiellonian University, Krakow, Poland Piotr Goryl Motion Workshop, Soleil,
ICE SECTION The coolest place to be! Elias Métral
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
Archiving System News Tango Meeting (Elettra, April 2008)
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
PLC-based control systems at SOLEIL - ICALEPCS 2017
                                                                       TANGO Collaboration Experience for running a multi-site international software project.
Status and prospects of VEPP-5 Injection Complex
Australian light sources: XFEL and Compact Compton Source
Coupling Correction at the Australian Synchrotron
Tango status at Elettra
WP11: electron and proton beam testing
ALBA capabilities towards contributions to the FCC study
JINR NICA beam transfer channels CS
s2Innovation – From Science to Innovation
The EPICS running envirionments in the five accelerator projects
Heating Unit Controller at NSRC SOLARIS
LAL meeting on e+ studies, Oct. 2010
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Advanced Research Electron Accelerator Laboratory
MEIC Cost Estimate Overview
Linac/BC1 Commissioning P
SOLARIS Tango Control System Status
Electron Beam Systems ETC and Methodology
Overview LINAC BOOSTER STORAGE RING 100 Mev Commissioned in 2008
High Level applications development status
Present Status of Orbit Stabilization at SPring-8
ThomX – Commissioning Meeting – 25/01/2018
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
X-Ray Endstation Systems (XES) 2006 Schedule
SNS-PPU upgrades the existing accelerator structure
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Solaris status Wojciech Kitka, on behalf of CS&IT group and whole Solaris team Touluse, 22.06.2016

Wojciech Kitka, 30th Tango Collaboration Meeting Outline Solaris status People Control System at Solaris Summary 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting

Wojciech Kitka, 30th Tango Collaboration Meeting The Machine Overview Solaris is a replica of the MAX IV 1.5 GeV Storage Ring. Injector: 550 MeV linear accelerator Thermionic electron gun 6 S-band normal conducting structures Storage Ring: Energy: 1.5 GeV Current: 500 mA 12 straight sections 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting

Wojciech Kitka, 30th Tango Collaboration Meeting Beamlines BL-04BM – PEEM/XAS – advanced installation Bending magnet based In assembly EMITEC end-station XAFS endstation BL-05ID – UARPES - commissioning Turnkey delivery by Elettra Undulator ID Control system commissioning (Cosylab) PREVAC end-station PHELIX – new beamline I1011 – beamline from Max-Lab 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting

Wojciech Kitka, 30th Tango Collaboration Meeting Solaris status (1) June 2015: - first turn, - electrons stored in Storage Ring – 5.2 mA, 490 MeV. 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting

Wojciech Kitka, 30th Tango Collaboration Meeting Solaris status (2) November 2015: - nominal optics, - electrons in Storage Ring reached 100 mA and 1.5 GeV. 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting

Wojciech Kitka, 30th Tango Collaboration Meeting Solaris status (3) May 2016: - first experiments on UARPES beamline. 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting

Wojciech Kitka, 30th Tango Collaboration Meeting Solaris status (4) June 2016: - electrons in Storage Ring reached 400 mA and 1.5 GeV, - lifetime: 100 min 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting

Wojciech Kitka, 30th Tango Collaboration Meeting People Krzysztof, Piotr Ga. Machine Protection System Personal Safety System Building Management System Michał, Piotr K. IT infrastructure and services Help-desk Łukasz Ż. (MAX-IV), Łukasz D. (50%), Wojciech (50%), Grzegorz (50%), Krystian (50%) Control system software Outsorced Tango and students software development coordination Julia (PhD. student in IT, 30% of time) General software development Database applications Ada, Arek, Maciek (CERN) (diagnostic group) High level software Diagnostic instumentation Tadeusz Information and data sources management Piotr Go. Coordination Virtual accelerator Students non-critical tasks GUIs helper tools 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting

Control System at Solaris (1) 3 instances of Tango: - one for a linac and a storage ring, - one per each of two beamlines. 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting

Control System at Solaris (2) CS upgrade in December 2015 (only for the machine): - Tango 8 -> Tango 9 - CentOS 6.5 -> CentOS 7 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting

Control System at Solaris (3) Tango Community tools in Solaris: Tango 9 (machine) / Tango 8.1.2 (beamlines), Taurus, HDB/TDB/SNAP/Bensikin/Mambo, Sardana, Device servers, … 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting

Wojciech Kitka, 30th Tango Collaboration Meeting Status summary Commisioning stage The machine is integrated Integration of beamlines Preparation for users Challenges: Small team Some technical issues: crashes of DS for Danfysik power supplies 6/21/2016 Wojciech Kitka, 30th Tango Collaboration Meeting

www.synchrotron.pl References: Thank you! Special credits to Darren Spruce and the whole MAX-IV KITS group