TDC2/TCC2 Electrical remedial work /12/14

Slides:



Advertisements
Similar presentations
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Advertisements

Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
DYNAMIC LOAD RESPONSE: As a result of the impressed inverter output wave form. Presenter: Dr Gawie van der Merwe.
SY/Max to Quantum Quick Wiring Adapter (QWA) Frank Prendergast Schneider Electric – Industry System Architect
Auburn University Facilities Prioritization Process Each college will submit up to five projects annually – Ten this first year Projects must cost $50,
Phase Difference = Phase Difference = 0.05.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Welcome to Industrial Electronics Division. Products Loco Products Signaling Products Motor Controllers Industrial Electronics Division.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
SY/Max to Quantum Quick Wiring Adapter (QWA) Frank Prendergast Industrial Solution Center Business Development Manager for Services
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
MOM Report Galina Vankova RAL, MICE Video Conference.
A. Perin, CERN, TE-CRG, 13 June ICL, 13 June 2012 Consolidation of the DFBX CL control system.
41 st LSC – March 21, 2014 G.J. Coelingh, TE-MPE-EE Long Shutdown 1 Status Report The upgrade of 600 A Energy Extraction Systems.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Understanding Electricity
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
IMPACTS OF INSTALLING THE REFERENCE MAGNET PLACEMENT IN B december 2014 Fulvio Boattini & Natacha Lopez Hernandez.
Electrical & Control Power Supplies Trevor Hartnett.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
EN-CV interventions during YETS
NA YETS: schedule week by week S. Evrard.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Solar Photovoltaic Demonstration. The solar panel was developed in 1839 by Charles Fritts, with very high expectations. With the overpopulation of the.
INNOVATION BUS GROUP:INNOTHENTICTECH PHASE 1 REFURBISHED BUS THIS PRESENTATION CONCETRATES ON POWER SUPPLY AND LOADS ONLY.
Time Remaining 20:00.
Gas Coordination Meeting Cabling. General Philosophy Cables between racks within the Surface Gas Building or between racks within the Underground Gas.
Modifications assembly zone CRAB Cavity SM18 View assembly zone with Cavitys LHC cryomodule/string CRAB + gantry/cryomodule SPL (plan: LHCACFGA_T0036)
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
Interventions on electrical distribution and racks’ infrastructure still to be done during LS1 and their impact W.Iwanski.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
Electronics and DAQ status Frontend - covers – Preparation of the final cover version and production Design finished Mounting of RJ45 verified using selective.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
SPS Personnel Protection System Renovation Project
Proposition de routing des cables :
TOTEM Electronics Status
EN-EL-FC Activity Jeremy Blanc, EN-EL-FC.
EN-HE SPS works during EYETS
Phase Camera hardware Nothing really new, only summarising status
SPS EN-CV Planning LS (initial draft)
MPE main activities planned for LS2
RF operation of REX-ISOLDE
Smitty’s Two Minute Drill Overcurrent Protection
TE-MSC activities in SPS during YETS
INTRODUCTION TO LOAD SHEDDING TRANSFORMER
Tonya L. Lewis Advisor: Paladino, Janet, ScD
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
Reasons Behind Electrical Issues in Cars
RF Power for C75 - Resources
Coldex disinstallation
RF Power for C75 - Resources
IV. Measuring Electricity
Starter Questions 24/01/11 A car travels 50km. The journey takes 30minutes. Calculate the speed in km/hr. 2. A plane flies 2000km at an average speed of.
Top 10 List – Electrical Energy
Chemical Potential Energy
Experimental Areas – LS2 planning
2019 Construction Estimates & Bid Results
A B * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * 105
Safety, reliability and maintainability
START OF REVISION OF UR TUNNEL INTEGRATION
Directed Numbers Starter
Chemical Potential Energy
Modified at -
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

TDC2/TCC2 Electrical remedial work 12/12/14 Phase 1 – Electronic starter replacement 82 electronic starters remain in TDC2 to be replaced with non-electronic versions Replacement time approx 30s per starter 1 hour intervention, 2 operatives (+2 ladders) Throughout TDC2 zone. Phase 2 – Electronic Ballast replacement 32 electronic ballasts to be replaced with transformer/diode DC converters Work estimated to take 1-2 person days, located on TDC2 Mezzanine 64 electrical connections to be modified (2 per ballast). 1 day intervention, 2 operatives. Phase 3 – BA80 surface cabling Modification of interlock cable to access control rack behind BA80 turnstyle (EMTE) Correction of control cabling to EBD270/A80 (EL/OP) in PA801 UPS Supervision cabling. No access to TDC2/TCC2 required.