Project “Improving the systems for navigation

Slides:



Advertisements
Similar presentations
EU funds Operational Program National co-funding Priority axes Schemes Projects by Institutions Projects by NGOs Projects by Bulgarian Companies Subcontractors.
Advertisements

By Freddy Delchot Manager Nautical Affairs Maritime Authority Suriname.
Michael Fastenbauer March 21, 2007 M-TRADE Final Conference, Tecnopolo Tiburtino, Rome (IT) Integration of River Information Services in Multimodal Information.
DEVELOPMENT OF THE GIURGIULESTI PORT COMPLEX. Giurgiulesti International Free Port ha, - has the status of a free economic zone - the oil terminal.
OPERATIONAL PROGRAMME ON “TRANSPORT” 2007 – 2013 Vessela Gospodinova Deputy minister of transport Nearer and closer.
RIS Implementation survey and policy evaluation RIS workshop Italy October 2012 Sandra van Putten/Panteia-NEA.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
Company Profiles and Introduction
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
MAKING USE OF IPA IN CROATIA – OPERATIONAL PROGRAMMES UNDER COMPONENTS III AND IV 13 November 2007.
Important considerations & contributions of flourishing shipbuilding industries in Bangladesh Khairul Hassan Doctoral student Maritime Engineering, Kyushu.
II Meeting of the Monitoring Committee of OP “Transport and Transport infrastructure” June 2015 Pravets.
Classification Societies – Contribution to Martime Safety Gesa Heinacher-Lindemann LL.M., Legal Director.
1. 2 Organizational Structure OSX Ownership OSX Leasing OSX Shipbuilding Unit OSX Services Free Float Integrated offshore E&P equipment and services provider.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
HIGH PERFORMANCE GREEN PORT GIURGIU 2012-EU S The project is in line with the Priority Project no 18 Waterways Axis Rhine-Main-Danube of the TET-T.
“SAFETY THROUGH QUALITY” Vessel Traffic Management and Information System on Romanian Danube ( Ro – RIS )
Vukovar, December , 2012 EAEMDR Status Report Bulgaria.
12Introducing Geographical Zones in the Mekong River and related Technical and Operational Requirements for Tankers Objective To assess, identify, define.
Transport Henrik Drake "Ports and Inland Navigation" European Commission, DG Mobility and Transport (DG MOVE ) Common Issues Meeting on RIS Zagreb, 13.
OPERATIONAL PROGRAMME
KIRIBATI National Report
Regional Seminar on Developing a Program for the Implementation of the 2008 SNA and Supporting Statistics INTERNATIONAL PROJECTS MANAGED BY TURKSTAT Alper.
NETWORK PERFORMANCE DEPARTMENT. OUTLINE OF PRESENTATION MISSION VISION STRUCTURE STRATEGIC OBJECTIVE STAFF STRENGHTH ON-GOING ACTIVITIES AND INITIATIVES.
1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.
Operational Programme on Transport Coordination of Programmes and Projects Directorate December 2007 Ministry of Transport.
P UBLIC P ROCUREMENT IN THE K YRGYZ R EPUBLIC MINISTRY OF FINANCE OF THE K YRGYZ R EPUBLIC.
STATE POLICY AND PERSPECTIVES FOR DEVELOPMENT OF THE RAILWAY INFRASTRUCTURE MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF.
An Overview of the Philippine Ports Authority Atty. Oscar M. Sevilla Philippines 2008/TPTWG30/MEG/02 Agenda Item 12.
OPERATIONAL PROGRAMME ENVIRONMENT EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia,
The Almaty Programme of Action A New Global Framework for Transit Transport Cooperation for Landlocked and Transit Developing Countries.
Priorities in the sector “Transport”
ХVII Meeting of the Monitoring Committee of Operational programme “Transport” November 2014 г. Pravets.
Transport Research Institute, Inc. Žilina, Slovakia.
Platform for the implementation of NAIADES State of Play of RIS in Europe RIS Workshop of the Danube Commission Budapest, 11th of April 2011 Andreas Bäck.
IPA, component I: Transition assistance and institutional building Programming process for 2009 Sarajevo, BOSNA I HERCEGOVINA Council of Ministers.
Belgrade, December , 2013 EAEMDR Status Report Bulgaria.
1 Ukraine Higher Education Final conference Kiev 12 November 2015 European Investment Bank 03/02/2016.
Sectoral Operational Programme on Transport Coordination of Programmes and Projects Directorate 2 October, 2006 Ministry of Transport.
EU-Africa Infrastructure Partnership Third Meeting of the Steering Committee 7th April 2010 Implementation of the Joint Statement on second PSC and priorities.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 14 – Transport policy Bilateral screening:
Ministry of Finance National Strategic Reference Framework Communication Strategy 20 June 2008 Second NSRF Monitoring Committee Zornitsa Arsenieva Advisor.
MAIN PRIORITIES IN THE BULGARIAN TRANSPORT POLICY Danail Papazov Minister of Transport, Information Technology and Communications 13 March 2014 Sofia.
RIS & IWW TEN-T Calls 2012 Open Annual and Multi-annual Calls for Proposals Nadia Chellafa – Project Manager – Ten-T Executive Agency.
VI Session of the Monitoring Committee of
NATIONAL RAILWAY INFRASTRUCTURE COMPANY
Monitoring Committee of OP “Transport and Transport infrastructure”
Ministry of Finance Contribution of the Operational Programmes to the implementation of the NSRF objectives Boriana Pencheva Director Management.
VI Monitoring Committee
Development of the Intermodal Transport in Bulgaria
Project BG05M2OR "Student scholarships - phase 1“
Falling while welding on the upper part of bridge worktable
Enabling multi-modality and efficient freight logistics
14th South West Pacific Hydrographic Commission Conference 30 November – 02 December Noumea, New Caledonia COOK ISLANDS Vaipo MATAORA Director Civil.
EMSA- Croatian partner in accession
Pacific Regional Navigation Initiative PRNI
IHO SWPHC Technical Workshop on Implementing Hydrographic Governance
NZ Primary Charting Authority
19th Meeting of the Meso America – Caribbean Sea Hydrographic Commission Guyana National Report by Mr Troy Clarke, Superintendent of Surveys (Ag), Maritime.
[PANAMA MARITIME AUTHORITY, PANAMA]
NM Department of Transportation
Thailand Inland Water Transport System
St. Vincent and the Grenadines
Evaluation Plans in Romania
16th Meeting of the South West Pacific Hydrographic Commission
17th Meeting of the Capacity Building Sub-Committee
DPN OFFICIAL LAUNCH EVENT
Coordination of the National Statistical System of the Republic of Macedonia Kruševo, 2018.
Cosco Shipping Lines Spain. S.L.
OP Integrated infrastructure 2014 – 2020
Presentation transcript:

Project “Improving the systems for navigation and topo-hydrographic measurements on the Danube river - phase 2” 29 November 2016 Sofia

Priority axis IV „Innovations in management and services-introduction of modernized traffic management infrastructure, improvement of transport safety and security“ Total project value: 6 146 508 lv. EFRD: 5 224 531 lv. – 85% National co-financing: 921 976 lv. – 15 % Project start: 31 March 2016 Project end: 31 January 2018

3D visualization of the surveying vessel The vessel will be equipped with modern hydrographic equipment and a laser system, which will serve to take bathymetrical information and create a model of the terrain along the bank, the islands and the bays.  3D visualization of the surveying vessel

Terrain visualisation (lidar and multi-beam) Working with a multi-beam

Visualisation when working with lidar

First steel sheet cut at the shipyard MTG Dolphin A symbolic transmission of a metal plate part of the first cut

Building the superstructure of the ship

Building the hull construction

Hull construction before reversal

Installation and welding of bulkheads in the hull – completed on 70% Overall view

Some of the surveying equipment is delivered

3D visualization of the surveying vessel Overall view /November 2016/

Priority axis V “Technical assistance” Project „Improving of the administrative capacity of EAEMDR in connection with OPTTI 2014-2020 implementation“ Priority axis V “Technical assistance” Total project value: 117 897 lv. EFRD/CF: 100 212 lv. – 85% National co-financing: 17 684 lv. – 15 % Project start: 13 September 2016 Project end: 30 September 2018

Activity 1 - Organization and conduction of trainings Activity 2 - Improvement of the existing office equipment Activity 3 - Optimization of the existing website Activity 4 - Project management

Thank you for the attention! Bozhidar Yankov Director of European Programs, Projects and Public Relations Department appd@appd-bg.org tel: 082/823 130