Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R

Slides:



Advertisements
Similar presentations
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Advertisements

Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
D.S. proposal 18/12/2003 R. Garoby 1 PROTON DRIVER ACTIVITY Present work program: IPHI-SPL collaboration HIPPI Joint Research Activity [CARE] Proton driver.
H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
CSC, Status of HIPPI – September 2006 Maurizio Vretenar Alessandra Lombardi.
Part2: Cavities and Structures Modes in resonant cavity From a cavity to an accelerator Examples of structures JUAS 2015 Linacs-JB.Lallement - JUAS
CSC, , A. Lombardi. 1 Status of HIPPI – April 2007 Maurizio Vretenar Alessandra Lombardi.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
STATUS OF THE TOP-IMPLART PROTON LINAC P. Nenzi 1, F. Ambrosini 3, A. Ampollini 1, G. Bazzano 1, F. Marracino 1, L. Picardi 1, C. Ronsivalle 1, C. Snels.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Linac4 Status C. Carli presenting (a slightly adopted selection of) slides prepared by and on behalf of M. Vretenar Looking from this point and with a.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
R.G. – 17/03/2003 MORIOND Workshop The SPL* at CERN OUTLINE  Why ?  How ?  Roadmap  Summary * SPL = Superconducting Proton Linac A concept for.
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
THE TOP LINAC PROJECT ISS-ENEA Project to demonstrate operability of a compact proton linac in a medium size hospital HIGH POWER RF TESTS OF THE FIRST.
Parameters of 2 nd SPL feasibility study A.M.Lombardi (reporting for the working group)
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
Alexander Aleksandrov Oak Ridge National Laboratory
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
CARE 05, CERN, HIPPI Activities -HIPPI Structure Highlights -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN.
1 PS Days - Evian / MV The SPL : a High-Power Superconducting H – Linac at CERN  Motivations  Applications  Design features  Improvements.
Linac4 Status 1 M. Vretenar sLHC public event
MP - HIPPI General meeting, Abingdon October 28-30, Side Coupled Linac Design at CERN Side Coupled Linac Design at CERN M. Pasini, Abingdon September.
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
DTL Option for MEIC Ion Injection Jiquan Guo, Haipeng Wang Jlab 3/30/
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
LECTURE 2 modes in a resonant cavity TM vs TE modes
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
UK Neutrino Factory Conceptual Design
The CERN Linac4 history, performance, perspectives
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
WP5 Elliptical cavities
Plans for a Superconducting Proton Linac at CERN
Abstract EuSPARC and EuPRAXIA projects
Linac4 M. Vretenar for the Linac4 design team
Linac4 Beam Characteristics
Complementary ISTC Projects #3888, 3889p
Plans for a Superconducting Proton Linac at CERN
Part2: Cavities and Structures
Superbeams with SPL at CERN
C. Ronsivalle, L. Picardi, C. Cianfarani, G. Messina, G. L
Plans for new LHC injectors R. Garoby
Progress towards Pulsed Multi-MW CERN Proton Drivers
LHC (SSC) Byung Yunn CASA.
Pulsed Ion Linac for EIC
Collective Effects and Beam Measurements in Particle Accelerators
Part2: Cavities and Structures
SLHC-PP kick-off meeting, CERN 9 April 2008
The SPL-based Proton Driver at CERN
Status of the JLEIC Injector Linac Design
Multi-Ion Injector Linac Design – Progress Summary
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R. Garoby) End of the Trilogy on SPL-Linac4… DAPNIA 9/01/2006

SPL = Superconducting Proton Linac a 4 MW / 3.5 GeV linear accelerator to: increase the performance of the CERN high energy accelerators (PS, SPS & LHC) address the needs of future physics experiments with neutrinos and radio-active ion beams DAPNIA 9/01/2006

SPL (2) Initial design (Conceptual Design Report 1): “optimized” for a neutrino factory assumed the use of LEP cavities & klystrons up to the highest energy Revised design in progress (CDR 2): based on updated physics’ requests using 704 MHz RF and bulk Niobium cavities in collaboration with CEA-Saclay & INFN-Milano to be published in 2005 Up-to-date information is available: on the CERN EDMS on the SPL site: http://project-spl.web.cern.ch/project-spl/ DAPNIA 9/01/2006

Three stages are planned: SPL stages Three stages are planned: Stage 1: 3 MeV test place Þ development and test of linac equipment, beam characterization Stage 2: Linac4 New linac replacing the present injector of the PS Booster (Linac2) Front-end of the future SPL Þ improvement of the beams for physics (higher performance and easier operation for LHC, ISOLDE etc.) Stage 3: SPL New injector for the PS, replacing the PS Booster New physics experiments using a high proton flux Þ improvement of the beams for physics and possibility of new experiments DAPNIA 9/01/2006

Linac4 design DTL CCDTL SCL Drift Tube Linac 352 MHz 13.6 m 3 tanks 3MeV 40MeV 90MeV 160MeV DTL CCDTL SCL Drift Tube Linac 352 MHz 13.6 m 3 tanks 5 klystrons 4 MW Cell-Coupled Drift Tube Linac 352 MHz 25.2 m 24 tanks 8 klystrons 6.4 MW Side Coupled Linac 704 MHz 28 m 20 tanks 4 klystrons 12.5 MW 3MeV line (H- source, IPHI RFQ, chopper line) Duty cycle: 0.1% phase 1 (Linac4) 15% phase 2 (SPL) 4 different structures, (RFQ, DTL, CCDTL, SCL) 2 frequencies Total Linac4: 86.3 m , 18 klystrons Beam current: 40 mA (avg. in pulse), 65 mA (bunch) DAPNIA 9/01/2006

Linac4 Schedule  Linac4 (160 MeV, H-) will double the intensity and brightness of the beam out of the PSB.  Support by the DG for a decision on construction at end 2006. Tentative schedule: 2005-06 Continuation of R&D 2006 (end) Linac4 Design Report (basic design frozen) 2007 Detailed design (=execution drawings!), definition of construction strategy, attribution of contracts 2008-09 Construction 2010 End of installation and commissioning DAPNIA 9/01/2006

IPHI HIPPI ISTC # 2888 & 2889 ISTC # 2875 Linac4 collaborations INDIA: klystron power supplies CHINA: quadrupoles, bendings, buncher IPHI HIPPI ISTC # 2888 & 2889 SCL ISTC # 2875 Network of collaborations for the R&D phase, via EU-FP6, CERN-CEA/IN2P3, ISTC, CERN-India and CERN-China agreements. The same network should support the construction of Linac4. DAPNIA 9/01/2006

Shunt Impedance Effective shunt impedance ZT2 along Linac4 Superfish calculation, not scaled The section between ~90 MeV and ~ 200 MeV is the most difficult for modern linacs: DTL-like structures present a sharp decrease in shunt impedance. Superconducting structures are not yet effective (low real estate gradient). Usual p-mode NC structures (CCL, SCL) at double frequency are considered expensive. DAPNIA 9/01/2006

The nominal Linac4 solution: a Side Coupled Linac Klystron [#] Tanks/Kly. Gradient E0 [MV/m] Power/Kly. [MW] Energy [MeV] N cells/tank 1 5 4 3.00 107.42 11 3.06 125.16 3.15 144.16 2.59 160.2 Tot. Klystr. Tot. tanks Average Grad. Tot. Power Tot. Length. [m] 20 12.46 28.02 RF power source: 4 MW, 704 MHz klystrons similar to SNS – (offer from Thales) DAPNIA 9/01/2006

More on the SCL Chain of cells, coupled via slots and off-axis coupling cells. Invented at Los Alamos in the 60’s. Operates in the p/2 mode (stability). CERN SCL design: Each klystron feeds 5 tanks of 11 accelerating cells each, connected by 3-cell bridge couplers. Quadrupoles are placed between tanks. How it looks like DAPNIA 9/01/2006

Example: the SCL for SNS DAPNIA 9/01/2006

Side Coupled cells Copper units made of one half accelerating cell and one half coupling cell, precisely machined (0.03mm) and brazed. 2 half cells with magnetic field lines 1 half cell with one half bridge coupler DAPNIA 9/01/2006

SNS SCL Construction Cell precision machining on a lathe – RF measurements after machining and before brazing DAPNIA 9/01/2006 Vertical brazing in the oven – final RF tuning, bead-pull measurement of field in the module

Options for CERN SCL construction Present status of Side Coupled Linac studies: * Studied inside HIPPI, jointly by CERN and LPSC Grenoble. Linac design (CERN), thermal analysis (LPSC), RF errors (LPSC, CERN), cell design. * Cold model will be built by LPSC (2006). * Technological model (Cu, brazed) will be built by BINP-Novossibirsk (2006). * INFN-Naples joins now the collaboration (bridge coupler design, stability). The construction of a Side Coupled Linac requires a difficult integration of technologies: Procurement of forged copper - Precision machining on Cu – First RF tuning before brazing – Brazing – Final RF tuning. Note that these technologies are very similar to those used for RFQ’s! Options for construction (2007-2009): Contract with ACCEL (has built the SNS SCL). Construction in Russia (some interest by BINP). Construction in Italy (INFN-Na ready, INFN interest still to be checked) Construction in France…? DAPNIA 9/01/2006

A superconducting alternative to the SCL? SCL can have another meaning: Super Conducting Linac. A SC section could replace the Side-Coupled, providing that we can obtain real-estate gradients ~2.5 MV/m. Needs investment for the cryogenic infrastructure, justified in the optics of an SPL following Linac4. SCL tanks (700 MHz) Spoke cavities (SC) (350 MHz) RF requirements: beam power 2.8 MW  - 20 units 100 kW, 352 MHz - 3 klystrons 1 MW, 352 MHz - 1 klystron 4 MW, 704 MHz DAPNIA 9/01/2006

Spoke, 352 MHz Focusing period in present design 90-160 MeV (FODO): ~ 1.5 m  compatible with Triple-spoke Triple-spoke designed at FZJ for HIPPI (E. Zaplatine): 0.78 m cavity length for b=0.5 E0T = 6.4 MV/m no freq. jump * Low efficiency at 90 MeV. * Do we need a double spoke at lower energy (but b=0.35 probably too low)? * Can we fit it in a cryostat ~ 1.2m long (to keep focusing distance)? * Can we feed 8 of these cavities from a single LEP klystron? DAPNIA 9/01/2006

Elliptical, 704 MHz Elliptical cavities at b=0.5 (CEA, INFN) are giving excellent results. Length ~ 0.9m Designed for 12 MV/m. * Require longer focusing period (~1.5 m). * Low efficiency at 90 MeV. * How many cavities can we feed with one klystron? * We could use the SPL-CDR2 layout, with superconducting quadrupoles and long cryostats, but long R&D time for superconducting quadrupoles. DAPNIA 9/01/2006

Summary for SC options A superconducting option is attractive for the high-energy part of Linac4, but has to compete with the conventional Side Coupled Linac. As a preliminary step in order to compare options we need layouts (mid 2006 ?) for both spoke and elliptical cavities, with a first beam dynamics analysis to be done in the frame of the HIPPI Activity (see ESAC recommendations). To compete with the SCL, average real estate gradient should be > 2.2 MeV/m. The option of cold quadrupoles (as for SPL) can be considered, but time is short to have it fully developed by end 2006. The RF power system can be a cost driver even for a SC linac, if one cannot drive at least 8 cavities/klystron. DAPNIA 9/01/2006

RF tests in SM 18 of prototype structures* for Linac4 Global planning RF tests in SM 18 of prototype structures* for Linac4 * Quotes from R. Aymar (Jan.2005) 3 MeV test place ready SPL approval * “in 2009-2010, to review and redefine the strategy for CERN activities in the next decade 2011-2020 in the light of the first results from LHC and of progress and results from the previous actions. “ Linac4 approval * “… in 2006-2007, to decide on the implementation of the Linac 4 and any increased R&D programme, depending on new funds made available and on a new HR policy” CDR 2 DAPNIA 9/01/2006