OPSM301 MS Project Tutorial

Slides:



Advertisements
Similar presentations
Microsoft Project Tutorial for Chapters 6 & 7
Advertisements

PRJ566 Project Planning and Management Lecture: Network Diagrams.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
CPM, Crashing, Resource Leveling using MS Excel & MS Project
OPSM 639, C. Akkan Before starting this section SAVE AS YOUR EXISTING MS PROJECT FILE AS -part3-1 -part3-1.
MANAGING PROJECT RESOURCES. Resource Allocation Problem  A shortcoming of most scheduling procedures is that they do not address the issues of resource.
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
Microsoft Project.
Project Scheduling Professor Stephen Lawrence Leeds School of Business University of Colorado Boulder, CO
Introduction to Project Management ECE 480 Erik Goodman.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Assignment #17 Solution Monday, March 15, 2015
Project Scheduling Professor Stephen Lawrence Graduate School of Business Administration University of Colorado Boulder, CO
ECE 480 Gantt Charts Revisited. Keys to Successful Gantt Charts USE the default, finish-to-start, constraints obtained by specifying predecessors, unless.
Microsoft Office Project 2007: Managing Projects.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
HIT241 - TIME MANAGEMENT Introduction
Unit4-IT Project BTEC NATIONAL – UNIT 4 Project Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
MANAGING PROJECT RESOURCES
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Unit4-IT Project BTEC NATIONAL – UNIT 4 Project Management MS PROJECT.
OPSM 301 Operations Management Class 19: Project Management: MS Project Koç University Zeynep Aksin
Latifa AlAbdulkarim King Saud University October,2009.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
6 Resource Utilization 4/28/2017 Teaching Strategies
1 Schedule Control with Microsoft Project 2003 P roject M anagement M ethodologies Laura Williams, PMP.
The Network Diagram. When to Do What?  Carrying out one activity after the other may result in project completion, but it will take the longest possible.
Managing the Information Systems Project Cont’d
Chapter 16 – Project Management
Project Management.
Project Management – PTM721S
Chapter 3 Project Management. Chapter 3 Project Management.
RESOURCE SCHEDULING references:
Project Management: PERT/CPM
Project Planning & Scheduling
The Project Schedule and Budget
RESOURCE SCHEDULING references:
RESOURCE SCHEDULING references:
RESOURCE SCHEDULING references:
RESOURCE SCHEDULING references:
ACTIVITY PLANNING AND RISK MANAGEMENT
Project Planning & Scheduling
RESOURCE SCHEDULING references:
Project Time Management.
Chapter 6: Project Time Management
Information Technology Project Management
PROJECT MANAGEMENT WITH CPM/PERT.
Project Management CPM Method Tutorial-p2
In this tutorial you will:
ENGINEERING MANAGEMENT (GE 404)
Stevenson 17 Project Management.
Introduction to Project Management ECE 480 Erik Goodman.
ENGINEERING MANAGEMENT (GE 404)
Project Management © 2004 D. J. Foreman.
Exercise – A small building.
Project Management © 2004 D. J. Foreman.
University of Debrecen Mongolian University of Life Sciences
Project Management © 2008 D. J. Foreman.
Presentation transcript:

OPSM301 MS Project Tutorial

Using Microsoft Project Program 3.1

Using Microsoft Project Program 3.2

Using Microsoft Project Program 3.3

Using Microsoft Project Program 3.4

Using Microsoft Project Program 3.5

Using Microsoft Project Program 3.6

Using Microsoft Project Program 3.7

Exercise: Advertising Campaign Activity Predecessors Time Resource Progress A. Media bids none 2 wks Ali 100% B. Ad concept none 6 Veli 100% C. Pilot layouts B 3 Veli 30% D. Select media A 8 Ali 20% E. Client approval A,C 6 Veli 0% F. Pre-production B 8 Ali 0% G. Final production E,F 5 Veli 0% H. Launch campaign D,G 0

Advertising Campaign project in MS Project Open MS Project, Select View-> Gantt which should be the default Enter task names Enter durations Enter precedence relationships, view network View critical activities: Project>Filtered for:critical Suppose we assign the above tasks to different people: Ali and Veli (Tools>Assign Resources) View>Resource Graph Level resources to alleviate conflict Track project progress  

Resource Allocation in Project Management So far: CPM/PERT methods for scheduling Ignored resource constraints In reality, each task requires at least one resource, resources are mostly shared Resource allocation is assignment of resources to scheduled tasks Scheduleds may have to be changed to accommodate resource issues

Resource Loading The amount of load on each resource (summation over all tasks which need that resource) on a period-by-period basis Good tool in early scheduling A seperate histogram for each resource is developed

Resource Leveling Objectives: Minimize the period-by-period variations in resource loading by shifting tasks within their slack allowances Minimize over-usage of resources Create a smoother distribution of resource usage Reduced set-up costs (hiring, training, laying off) Improves morale Needs less hands-on managemet

Different Approaches possible If time constraint is the priority, no adjustments should be made on the critical path If resource constraint is the priority, project duration can be extended by adjusting critical activities Earliest and Lates Start Times and Slack information is used in Resource Leveling MS Project facilitates resource leveling