MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.

Slides:



Advertisements
Similar presentations
Putting Houses on the Path to Lower Energy Consumption. Awareness and Long term planning helps to maximize energy opportunities.
Advertisements

WBS-Construction of House (Example) WBS Dictionary
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
USC Viterbi School of Engineering. Automated Imbedding of Steel Reinforcement Mesh.
OPMA 5364 Project Management Part 5 Project Scheduling
USING MS PROJECT Project management software programs such as Microsoft Project can be used to compute the earliest and latest start and finish times and.
Project Activity Planning
Project Scheduling: PERT-CPM
Chapter 3 Project Management.
PM – TECHNICAL ANALYSIS WORK BREAKDOWN STRUCTURE PRESENTED BY: RASHMI TAK PGDM 09/40.
Land Rights and the Slums
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
CONSTRUCTION SCHEDULING. steps to effective time management Examine the Contract List Major Contractual Obligations Divide Project into Major Work Areas.
ASSIGNMENT 1 Model Answers. Question 1 Q1) Consider building a garden shed project, which involves designing the shed, figuring out what materials are.
Assignment Problems Variation of transportation problems. One-to-one assignment. Workforce assignments, machine assignments, etc. (go to example)
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
EMGT 501 HW #2 Solutions Chapter 6 - SELF TEST 21 Chapter 6 - SELF TEST 22.
7 Set of Floor Plans Primary Considerations
USING MS PROJECT Project management software programs such as Microsoft Project can be used for developing the project schedule We demonstrate the use.
CS 160: Software Engineering October 20 Class Meeting Department of Computer Science San Jose State University Fall 2014 Instructor: Ron Mak
Project Management CPM, PERT, Crashing – An Illustrative Example
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
Building the Houses Sri Lanka Tsunami Reconstruction Project in
© OnCourse Learning. All Rights Reserved. Basic House Construction Learning Objectives  List the primary styles of residential architecture  Describe.
Module 6 Session 6.1 Visual 1 Module 6 Preparing the Work Breakdown Structure (WBS), Responsibility Matrix, and Master Summary Schedule Session 6.1 Preparing.
Building Plans.
Estimating Project Times and Costs
Project Management - PERT/CPM What is project management? Consider building a house: Step A: Prepare site. (5 days) Step B: Build foundation. (8 days)
EGR Project Management Planning Techniques Project manager responsible for developing project implementation plan. Duties includes: Defining.
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
Chapter 12 Network Scheduling Techniques. Scheduling Techniques Gantt or bar charts Gantt or bar charts Milestone charts Milestone charts Line Balancing.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Operational Research (O.R.) case studies. What’s the problem?
MS PROJECT 2013 Project Planning, Scheduling, Monitoring and Control ASSOC. PROF. DR. İBRAHİM YİTMEN FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING.
Orthographic Drawings
Operational strategies Lean production. The adoption of techniques that help to reduce waste.
Project Scheduling Class 7.
Project Management Planning Techniques
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Scheduling and Budgeting Engineers Without Frontiers CEE 402.
How Our Earth Sheltered Homes are Constructed Earthlog ® Equity Group, Inc. The American Dream … The Future is Now
MODULE 6 – RESOURCE LEVELING
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Upon completion of this module, you will be able to:
CE 332 – Construction Engineering and Management
UNIT II Scheduling Procedures & Techniques FLOAT
Major Steps In Building a SFR
Tucson Amateur Astronomy Association
MODULE 10 – PROJECT SERVER
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
MICROSOFT PROJECT MODULE 7 – CRITICAL PATH.
Progress Charts.
Project Scheduling Chapter 14.
Planning and Scheduling a SIMPLIFIED Construction Project
Minuteman Vocational Technical Regional High School Progress
Consulting Captains, LLC
Progress Report 11/10/11.
Ramar-Hall Addition: 2017.
Project Scheduling – Critical Path Method (CPM)
Minuteman Vocational Technical Regional High School Progress
Monte Carlo vs. PERT Tutorial
INTRODUCTION WORK BREAKDOWN STRUCTURE
General Foundry Example of PERT/CPM
Planning assignment in MS-Project
RISER PROJECT F bathroom.
In-Class Scheduling Exercise
Housing & Interiors Explain the benefits of exterior home care
Presentation transcript:

MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE

CLASS DETAILS Jeremy Callinan Wednesday, 6/3/15 Friday, 6/5/15 All sessions: 12:30 pm until 4:30 pm

Overview of classes MODULE 1 – INTRO MODULE 2 – EXAMPLE PROJECT : BUILD A HOUSE – MAKING TASKS MODULE 3 – SETTING UP YOUR PROJECT FILES – WORKING TIME & OTHER OPTIONS MODULE 4 - TASKS & PREDECESSORS MODULE 5 – SETTING UP RESOURCES MODULE 6 – RESOURCE LEVELING MODULE 7 – CRITICAL PATH MODULE 8 – REPORTING MODULE 9 – OTHER EXAMPLE PROJECTS MODULE 10 – PROJECT SERVER MODULE 11 – PROJECT MANAGEMENT TECHNIQUES MODULE 12 – OTHER EXAMPLE PROJECTS Module 13 – TRACKING PROGRESS Note: module 9 also has a glossary

This is what it will look like

Let’s start Check to make sure our project is set up correct (work time, etc) Start adding tasks!

Another example project Task, Duration, and Immediate Predecessor Information for Construction Project IMMEDIATE DURATION TASK DESCRIPTION PREDECESSORS (WEEKS) 1 START -- 0 2 Excavate and Pour Footers 1 3 3 Pour Concrete Foundation 2 1 4 Erect Rough Wall & Roof 3 4 5 Install Siding 4 6 6 Install Plumbing 4 3 7 Install Electrical 4 4 8 Install Wallboard 6,7 5 9 Lay Flooring 8 6 10 Do Interior Painting 8 3 11 Install Interior Fixtures 9,10 3 12 Install Gutters & Downspouts 5 2 13 Do Grading & Landscaping 12 3 14 FINISH 11,13 0