Foundational Task prioritization: Outcomes of PB meeting

Slides:



Advertisements
Similar presentations
1 Agenda item 4: Work modalities of the revised ISDR system to support the implementation of Hyogo Framework- Elements to be reviewed in groups- & prepare.
Advertisements

Chapter 8: Capacity Building Presented by Co Chair Mr. John Briceño CCAD Central American Countries 11/29/2003.
Capacity Building Mandate We, the participants…recognize the need to support: …A coordinated effort to involve and assist developing countries in improving.
GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee March 2009.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
© GEO Secretariat Capacity Building Committee experience of resource mobilisation Alan EDWARDS EUROPEAN COMMISSION Research Directorate General Environment.
GEO Strategic Plan : Implementing GEOSS
© GEO Secretariat 2.4 Monitoring and Evaluation Activities Craig Larlee / John Adamec Co-Chairs, M&E Working Group GEO 2015 Work Plan Symposium 5—7 May.
Capacity Building and Developing Countries in GEO (summary of workshop discussions) Hilcea Ferreira INPE-Brazil Andiswa Mlisa GEO Secretariat ( Acknowledgement.
2016 Transitional GEO Work Programme Discussion & CONSOLIDATION Session 10, 2015 GEO Work Plan Symposium Geneva, 7 May 2015 Alan Edwards (IPWG) Giovanni.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
GEO Strategic Plan : Implementing GEOSS AN UPDATE GEO WORK PLAN SYMPOSIUM 05 MAY 2015 GENEVA, SWITZERLAND.
6. Strategic Plan : Implementing GEOSS Validating the way forward: Review of feedback from Plenary.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
The Use of the Targets by the Institutions & Development Implementation Board in Monitoring the Work Plan Implementation 2nd GEOSS Science and Technology.
GEO Work Plan Symposium 2014 Data Management Task Force.
CEO Team SEO SIT Technical Workshop 25 – Agenda #16 EUMETSAT 17 th to 18 th September 2015 Committee on Earth Observation Satellites CEOS in the future.
GEO Strategic Plan : Implementing GEOSS IMPLEMENTATION PLAN WORKING GROUP GEO EXECUTIVE COMMITTEE MARCH 2015 GENEVA, SWITZERLAND.
Towards an European Network of Earth Observation Networks (ENEON): Addressing Challenges and Facilitating Collaboration for non-space based Earth Observations.
GEO Implementation Boards Considerations and Lessons Learned (Document 8) Max Craglia (EC) Co-chair of the Infrastructure Implementation Board (IIB) On.
GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.
GEO Partnerships, Objectives and Activities Roundtable: Strengthening UN Engagement with a Special Focus on the Post-2015 Development Agenda Barbara J.
GEO’s Need for Non-space Based Observations and the GEO Vision for GD6 Osamu Ochiai GEO Secretariat November 10 Mexico City.
Support to National REDD+ Action: Global Programme Framework (SNA) Work Plan and Budget 2015 Information and Knowledge Sharing Sessions Twelfth.
GEO 2016 Work Programme Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Florian Wetzel, EU BON Biodiversity and Ecosystem Sustainability 2016 GEO Work Programme Symposium Breakout Session Report 4 May 2016.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
GEO Strategic Plan : Implementing GEOSS Douglas Cripe GEO Work Programme Symposium 2-4 May 2016, Geneva.
UHC 2030 CSO engagement mechanism Bruno Rivalan IHP+ Northern CSO Representative IHP+ Steering committee 21 th June 2016.
Engaging CSOs in UHC 2030 Bruno Rivalan IHP+ Northern CSO Representative IHP+ Steering committee 21 th June 2016.
GI10: GEO-VENER Vision for Energy Initiative Review Team: Mark Reichardt, Lead Tim Haigh, Reviewer Thierry Ranchin, Reviewer.
CEOS Contributions to GEO
Reporting, Monitoring and Evaluation
GEO ExCom and the GEO Programme Board Priorities and expectations for 2017 Robert-Jan Smits EC GEO Principal and Lead ExCom Co-Chair for 2017 Geneva,
4th Assessment of Progress Against the GEOSS 2015 Strategic Targets
Summary of the Outcomes of the 1st AfriGEOSS Steering Committee Meeting Humbulani Mudau DST, South Africa 1st AfriGEOSS Symposium 27 – 29 April 2016.
The Group on Earth Observation The water related activities Vanessa Aellen Technical Expert for Water 16 may 2017, Tuscaloosa.
Giovanni Rum, GEO Secretariat GEO Work Programme Symposium
Review of Candidate GEO Initiative “Geohazard Supersites and Natural Laboratories 2.0” Prepared by: Review Team Lead: Jonathon Ross – CEOS Delegation (Alternate)
Subgroup 2 - Foundational Tasks structure review and recommendations for the WP Francisco Chavez (POGO, lead), Ivan Petiteville (CEOS), David.
GEO Strategic Plan : Implementing GEOSS
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
GEO and GEOSS 42nd CEOS WGISS Osamu Ochiai Paola De Salvo GEO Secretariat 19 September 2016 Frascati, Italy.
Programme Board 6th Meeting May 2017 Craig Larlee
Capacity building coordination Mark Noort HCP International Andiswa Mlisa GEO secretariat GEO WP Symposium Geneva, Switzerland May 4th, 2016.
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
Review of integrated PSM resources and tools and introduction to group work Upjeet Chandan ICCM FTT 17th February 2016.
GEO Programme Board Report
GEO-Global Water Sustainability
GEO Capacity Building Coordination Capacity Building in GEO WP 2017 – 2019 Capacity Building Coordination TT GEO Programme Board Meeting 23 – 24 May.
WMO Integrated Global Observing System (WIGOS) 16-RA VI Side Event Helsinki, Finland, 11 September 2013 Dr Miroslav Ondráš, Dr Wenjian Zhang (WMO) Dr.
Measuring Outcomes of GEO and GEOSS: A Proposed Framework for Performance Measurement and Evaluation Ed Washburn, US EPA.
2017 WPS Break-Out Session: Addressing Gaps
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
GEOSS EVOLVE Osamu Ochiai GEO Secretariat CEOS WGISS-43
Oceans and Society: Blue Planet
Knowledge Translation
Links with GEO.
High level seminar on the implementation of the
EuroGEOSS initiative CEOS WGISS-46 meeting Anica Huck October 24, 2018
Engagement with GEO Kerry Ann Sawyer, NOAA, CEOS SIT Chair Team
State of World’s Cash Report:
Portfolio, Programme and Project
CEOS Response to IPWG on Draft GEO Strategy
Working Group 3 Thematic Clustering
CEOS Engagement with GEO
Global Platform on Disaster Risk Reduction May 17th 2019
Presentation transcript:

Foundational Task prioritization GEO Programme Board 21 September 2016 Geneva, Switzerland

Foundational Task prioritization: Outcomes of PB meeting Programme Board reached consensus on Foundational Tasks with greatest priority for WP2017 – 2019 at meeting on 7th – 8th Sept. Review of priorities provided to EXCOM as answer to request and to GEOsec (as initiator and with a key role for Foundational Tasks). PB Subgroup refined recommendations (approach & scope within FTs) to guide GEO in focussing this part of WP 2017 – 2019. As second stage PB made suggestions for GEOsec and Community on how elements not a priority as FTs might be implemented in WP 2017 – 2019 as part of synthesized recommendations below. The Foundational Task review process will have to be continued by the next PB (drawing i.a on progress report from GEOsec)

Synthesized recommendation from PB Priority Foundational Tasks for WP 2017 – 2019, GEO Community led GEOSS Development and GCI Operations Synthesized recommendation from PB GD-02 Advancing GEOSS Data Sharing Principles DSP are a key success story of GEO and are important. PB recommend to streamline activities in period 2017 - 2019, de-scoping some activities from the FT. GD-03 GCI Operations (includes some key elements of GCI development) GCI Operations are a critical part of GEO and is explicitly cited in Strategic plan as an example of FT. PB recommends FT to focus on core of operations of GCI, bringing in key elements from old GD-04. Evolution or exploratory activities from both FTs to be shifted to an initiative or (if not resourced from community) dropped. GD-05 Coordination of satellite Earth observations The FT is an enabling 'coordination activity' (consistent with priorities for FT in strategic plan) within which space agencies work to ensure completeness/continuity of satellite observations to support current and future GEO community activities, flagships and initiatives. It will be a key part of the effort to respond to the outcomes from GD-09 [user requirements]. It is a community-lead activity, with no expectations of specific / exceptional GEOSEC resourcing. GD-06 Coordination of in situ Earth Observation Resources In-situ coordination was a known weakness requested to be strengthened in GEO. Cannot create value along value chain with insecure foundational observations. Longer term investment. PB recommends a community led FT with scope and approach altered could connect better with existing domain coordination mechanisms & communities. Focus GEOsec support on weakest domain and maturing of community leadership. Progressively strengthen to needs in GEO WP. Improve link to existing inventory type products rather than creating new products. Keep link to GD05 strong and explicit. De-scope citizen observations.

Synthesized recommendation from PB Priority Foundational Tasks for WP 2017 – 2019, GEO Community led GEOSS & Community Development Synthesized recommendation from PB GD-07 GEONETCast Development and Operations PB recommends that this activity is a critical part of GEOSS operational infrastructure. GEONETCast is a system that operationally facilitates discovery, access and use of EO by diverse user communities – especially from developing countries. This enabling activity cuts across SBAs and includes elements of infrastructure and data/information. Strong links to Capacity Building Coordination and GCI operations needed. GD-09 SBA process: Systematic determination of user needs / observational gaps and Knowledge Base development GD09 user needs identification is key element of assuring GEO adds value. FT scope somewhat confused by inclusion of exploratory activities on knowledge base and lack of specificity about gap analyses (which, who, when). PB recommends to streamline FT on the design and undertaking user needs processes stepwise (ex by SBA) with investment of Community and significant GEOsec resources (Trust Fund and secondments). Exploratory activities on knowledge base should be shifted to CA (if support from community) with a view to include in later FT, with support from Initiatives/Flagships to collect/curate the info. CD-01 Capacity building coordination A failure to effectively build capacity around use of data and information to support decision making is a critical risk for the success of the GEO strategic plan. Growing a FT coordination activity on capacity building does not remove GEO community responsibilities in initiatives and flagships to undertake capacity building. The FT can enable more effective delivery of capacity building, creating more widespread visibility, deployment, and improved uptake of training, best practice and use. PB recommends a community led FT on capacity building coordination, building on previous WG, and keeping whole of WP perspective (drawing on capacity building elements described) whilst working to extend successful aspects of regional capacity building models (such as in AFRIGEOSS) to other domains and regions.

Synthesized recommendation from PB Priority Foundational Tasks for WP 2017 – 2019, GEO Secretariat led GEOsec operations Synthesized recommendation from PB SO-01 Management and Support (includes resource mobilization) SO-02 Communication and Engagement SO-03 Monitoring and Evaluation

Synthesized recommendation from PB Synthesized recommendation from PB Suggestions on how Foundational Tasks with less priority might be handled in WP 2017 - 2019 GD GEOSS Development and GCI Operations Synthesized recommendation from PB GD-01 GEOSS concept refinement and implementation: Global Observing and User Information Systems (includes RF protection) PB recommends that this activity is not a priority for a FT and is not on critical path in 2017 – 2019 timeframe. Suggests could be a Community Activity at this stage. RF protection should be included as aspect of SO-02. GD-04 GCI Development PB recommend to combine GCI operations and elements of GCI development focussed on day to day services addressing specific user needs. Suggest to recast GD-04 as an initiative (GEOSS EVOLVE) focussing on evolutionary elements. GD-08 Communications Networks PB recommends that this activity is not a priority for a FT. CD Community Development Synthesized recommendation from PB CD-02 CAs, GIs and GFs Implementation Support PB recommends that this activity is not a priority for a FT. Generic elements are part of GEOsec operations. CD-03 Reinforcing engagement at national and regional level Recommends that this activity is not a priority for a FT. Could be led thru regional GEOSS initiatives by GEO community. CD-04 Assess the benefits from EOs and of their socio-economic value PB recommends that this activity is not a priority for a FT. De-scope most activities. Existing literature can be used to evaluate impact of EO. (M&)E should include a task to keep an eye on literature (keep aligned with good practice, summarise and draw on literature where needed). If there is a gap in methodology, GEO community (MS & POs leading CA or Initiative) take specific action to address gap, noting this is very resource intensive to do.

Proposed next steps PB recommendations on Foundational Task prioritization provided to EXCOM (for info) and GEOsec (for action). GEOsec has responsibility to initiate Foundational Tasks for WP 2017–2019. GEOsec to re-cast Foundational Tasks taking into account resourcing availability, results of PB prioritization and own considerations. GEOsec take contact with communities involved in de-prioritized FTs – discuss next steps. Summary note on use of FTs as implementing mechanism prepared by PB. PB co-chairs to send note & mail to FT leads & contributors.