RACOON Project Daniele Teotino - ENAV RACOON Project Manager

Slides:



Advertisements
Similar presentations
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Advertisements

Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
Work load and responsibilit y npor. Ing. Miroslava Šimonová.
19/09/2007 Belfast, AIAA Conference SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
The European Organisation for the Safety of Air Navigation BORYSPIL ACE & PLANNING STUDY Mariia Naumenko.
Advisory Council for Aviation Research and Innovation in Europe Core Presentation ACARE Communications Group March Aug-15 1.
© AQUILA Air Traffic Management Services Limited Flexibility | Strength | Purpose 1 29 October 2014 JUSTIN BARRATT MANAGING DIRECTOR.
6Th International Conference ICAO Global Aviation Training Office
Introduction to PBN Seminar ICAO PBN Implementation 1.
SESAR Single European Sky Air traffic management Research
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
May11, Introduction: Project Team Agenda Introduction Performance Analysis LATIST Framework Usage Centered Design Process LATIST Development Usability.
ITS for freight and logistics …Bringing intelligence into the mobility of people & goods 22 June Zeljko Jeftic.
Safety support in the automotive industry Jacob Bangsgaard Director of External Affairs and Communications 1st Annual International Conference on ICTs.
ATM Conference, Oslo May 19 th, 2015 ATM Master Plan 2015 Consequences for cost, safety, performance and environment.
11 Satellite-based solutions for Train Control Systems European Parliament, Brussels Tuesday, 11 February 2014 Francesco Rispoli, Manager Satellite Technology.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
IFly project: Airborne Self Separation as basis for advanced en route ATM Henk A.P. Blom iFly coordinator National Aerospace Laboratory NLR
ASBUs Block 1 Overview The CANSO Viewpoint Eugene Hoeven Director ICAO Affairs ICAO Liaison Office Pre-AN-Conf/12 Workshop Montreal, November 2012.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding PROJECT PRESENTATION.
ONOS Project Partners with Linux Foundation Driving Innovation by Global Developer Community Guru Parulkar Executive Director ON.Lab and Chairman of the.
The European Organisation for the Safety of Air Navigation V & V Some lessons learned in Europe FAA V&V Symposium, Atlantic City, October 2010 Nigel.
DeSIRE Workshop, Pisa, 25-26/11/2002 1/7 A Case Study in Air Traffic Control Alberto Pasquini Deep Blue Srl.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
Presentation to US Space-Based PNT Advisory Board
ARTEMIS Industry Association Title Presentation - 1 TOWERLESS Aerodrome Traffic Control with Remote Control Center Daniel Arribas de Heredia.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
Petros Stratis – BLUE MED Project representative – DCA Cyprus Co-financed by the EU (TEN-T)
Support for English, maths and ESOL Module 1 Managing the transition to functional skills.
Second ATM R&D projects Co-ordination and networking meeting 14 Nov 2007 Advanced Remote Tower - ART A concept study of Enhanced functionalities during.
Milano-Malpensa Airport
International Federation of Air Traffic Safety Electronics Associations PCP and CP2 by Robert Schneebuaer IFATSEA Ambassador.
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
CEATS Central European Air Traffic Services
RACOON Operations Antonio Nuzzo – RACOON Operational Leader
IFATSEA General Assembly Keynote address Berlin, Germany November 2015
Adaptive Automation NINA project
Workshop on preparations for ANConf/12 − ASBU methodology
OptiFrame WP7: Implications for Decision Makers and Dissemination of results LANCASTER UNIVERSITY Centre for Transportation Systems and Logistics (CENTRAL)
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Chris Shaw, EUROCONTROL Experimental Centre
Paolo Sordi Airport Operations Processes & General Aviation Manager
OptiFrame WP1: Project Management
ANConf/12 – Agenda H. Sudarshan
Future Communications Infrastructure – An update
London 14 October 2015 Freek De Witte Head of Stakeholder Relations
HyTEC: Hydrogen Transport in European Cities
What is SESAR? SESAR is the European program for air traffic management infrastructure modernisation. SESAR aims at the development of the next generation.
Aviation Innovation for Regional Integration
ANConf/12 – Agenda H. Sudarshan
ASEAN PBN Routes Objectives:
Deloitte Consulting LLP SCOOPS Session
RNAV and RNP Strategy in Japan
AVINOR REMOTE TOWERS.
ATM Conference
Road Infrastructure for Road Vehicles Automation
& David Gregory, Connected Space Ltd
Matteo Merialdo RHEA Group Innovative aspects in cyber range solutions.
The CYBERWISER.eu project
ICAO Forum on Integration and Harmonization of NextGen and SESAR into the Global ATM Framework 8-10 September 2008 Lex Hendriks Deputy Director DAS, EUROCONTROL.
IBM Software An international airport Establishing near-seamless integration between heterogeneous systems The need: This airport needed a flexible, integrated.
ERAU NextGen Florida Test Bed (FTB)
Presentation transcript:

RACOON Project Daniele Teotino - ENAV RACOON Project Manager Head of SESAR JU Activity Coordination RACOON Open Day - ENAV Malpensa Tower, 11 November 2016

SESAR life cycle To define, develop and deploy the technology that is needed to increase ATM performance and build Europe’s intelligent air transport system RACOON Open Day – 11/11/2016

SESAR Solutions SESAR Solutions refer to new or improved operational procedures or technologies that aim to contribute to the modernisation of the European and global ATM system. 63 SESAR Solutions, divided into 4 areas (Key Features) 24 Solutions are already being deployed across Europe RACOON Open Day – 11/11/2016

Remote Tower Solutions Remote tower services for a single low-density airport Single remote tower operations for medium traffic volumes Remote tower for two low-density aerodromes BENEFITS Increased cost efficiency Increased accessibility to and support for regional economies RACOON Open Day – 11/11/2016

RACOON in a Nutshell SESAR JU Very Large Scale Demonstration First Italian initiative on Remote TWR solutions Challenging objectives: Single Remote and Multiple Local/Remote GNSS monitoring solution Challenging scenarios Milano Malpensa and Linate: the 2nd and 3rd airport in Italy High technical and operational complexity Tight schedule : 2-year project (2014-2016) RACOON Open Day – 11/11/2016

Keys of Success Gain from SESAR developments and other Stakeholders experience Strong Partnership and team working Involvement of Operational Staff since the very beginning Working in parallel on technical and operational issues Problem solving approach – never give up! Clear roadmap to the Flight Trial execution RACOON Open Day – 11/11/2016

RACOON Partnership The Partnership … and as Supporting Partners: RACOON Open Day – 11/11/2016

The Demonstration Roadmap Real Time Simulations executed in October 2015 Infrastructure completed in July 2016 Safety Assessment completed in July 2016 Shadow Mode & Training conducted in September 2016 Flight Trial set-up completed in September 2016 Flight Trials successfully completed in October 2016 RACOON Open Day – 11/11/2016

Flight Trial Campaign More than 100 flights remotely managed through the RACOON Remote Tower Centre: 82 flights on Linate – Remote Single Airport 36 flights on Malpensa – Multiple Airport (Local/Remote) More than 60 flights in Linate with local control flying RNP-APCH procedures for GNSS monitoring solution purpose RACOON Open Day – 11/11/2016

The Test-bed Full Operational capabilities Electronic Flight Strip-based environment Advanced video features: Night vision/Infra-red Tracking Zooming Hot-spot cameras Preset views Information as overlay (radar labeling, contours, gates) RACOON Open Day – 11/11/2016

The Malpensa Remote Tower Module RACOON Open Day – 11/11/2016

The Linate Remote Tower Module RACOON Open Day – 11/11/2016

Thanks for your attention RACOON Open Day – 11/11/2016