Woodland Public Schools

Slides:



Advertisements
Similar presentations
The Unit Owners Association of the Madison, A Condominium Building Revitalization (Work Completed & Upcoming Work)
Advertisements

Tam Valley School Modernization - Phase 1 Summer 2011.
CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
Cambrian School District 5-year Facilities Maintenance Plan Update 8/25/11.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Howdy Folks Welcome To Golden Howdy Folks Welcome To Golden.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
May 2013 Webinar The contents of this webinar are not prescriptive best practices for every school or school district, but rather suggestions to consider.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Water jacket to air box crack completed Lower bore repair side A2 needs two more pins and finish work.
1 Before and After The Appearance Program; enhances your company image contributes to your fleet vehicle safety communicates a professional advantage.
F ACILITIES S ERVICES D EPARTMENT M EETING P OSITION R EVIEWS Presented by: Ray Nelson, Carpenter & Dave Gazeley, Heat Plant Operator.
Rio Del Oro Riverside Meadows Cobblestone. Plumas Lake Elementary School District ( Maintenance Department ) Here’s the life cycle I use for our Deferred.
Proposal For Fire Station No. 2 Presented to: Lawrence City Commission April 11, 2006.
Facilities Maintenance Department LtCol Todd A. Kerzie Facilities Maintenance Officer (760) 725 – 3807 Mr. Jeff Hunt Maintenance Control Director Marine.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Arrival & Dismissal -Assembly begins every morning at 7:40. Please have your child to school on time. We start our lessons promptly at 7:50 am. If your.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
Capital Improvement Program for September 9, 2014.
Facilities Modernization Program Funded by Measure B Project Report September 21, 2015.
SUMMER 2015 DEFERRED MAINTENANCE
+ Facilities and Security Updates December Security Security systems for ES and MS/HS We have had walkthroughs and quotes from 3 potential vendors.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Ladder Safety. Each year, more than 511,000 people are treated in hospital emergency rooms, doctors' offices, clinics and other medical settings because.
San Francisco Fire Department Facilities Update.
Administrator Sodexo Performance Survey June 9, 2015.
Woodland Public Schools Facilities and Safety Report For April 2016.
SUPERINTENDENT’S REPORT August 10, MISSION STATEMENT The mission of the Pender Public School District is to provide quality educational opportunities.
Woodland Public Schools Facilities and Safety Report For September 2016.
Infrastructure Revitalization Project
Facilities Planning Robert A. Haley Superintendent
Howard XC 2017.
JOHN A. HOLMES IMMEDIATE FACILITY NEEDS
Woodland Public Schools
Facilities Services Department Meeting June 2016.
Electrical Principles and Wiring Materials
DISPENSE.
Woodland Public Schools
Woodland Public Schools
San Luis Potosi – New plant April 24th 2015
Point of Use Dispensing
Woodland Public Schools
Howard XC 2017.
Woodland Public Schools
Woodland Public Schools
Project Name Steering Committee Meeting Project Manager: Project Manager Name Program Manager: Program Manager Name Project Sponsor: Project Sponsor Name.
OMNIXX to OPENFOX CONVERSION LESSONS LEARNED
BOND PROGRAM- Door Lock & Building Access
Faculty On-boarding School of Medicine.
Hopewell Valley Regional School District
The summer of 2018 and all the work that has taken place
Davisville Junior Public School / Spectrum Alternative Senior School
Facilities Projects Update
Building Property Committee Meeting
Affordable, Safe, Sanitary & Comfortable Housing for Low Income Adults
Innerarity Island Gate System
Mount Vernon Community School
Recent Bond Accomplishments
Chimacum District Facility & Program Plan
Mount Vernon Community School
7TH GRADE EXPECTATIONS.
Moving from Consumers to Producers Kings Park Central School District
Click anywhere to get started…
Presentation transcript:

Woodland Public Schools Facilities and Safety April 2017 report

FACILITIES REPORT Summer work We will continue to focus on building exteriors to protect the infrastructure of our buildings. This summer I am ramping the paint team from 2 to 6 employees. Major items planned for this summer include:   Paint and reside PO 2/3, 4/5, 6/7 Portable 11/12 will require major renovation, roof, siding paint ramps mold mitigation. Add sidewalk to Green Gym from end of Green Hall Multiple paving projects including seal coating existing paved areas and new pavement Sandblasting areas at WPS and WIS that were tagged and painted over. We will apply a treatment that seals the brick or concrete to prevent tagging from sticking. Roofing replacement and repairs at WPS and WMS Carpet replacement at WMS and select area in the K-wing at WPS Camera system WPS (in progress) WIS and WMS Portable install WIS Paint building A WMS (wood shop, metal shop and IT building) Prepping portable 461 and 463 at WMS for ELL and staff offices LED conversion Green hallway, Yellow hallway and Commons Numerous other projects around the district (60 in all)

Facilities Report Continued Card key access system Systems are up and running at WPS and WMS. We will move forward with WIS next week WIS still needs to have the FOB systems removed along with the magnetic locks (employee access points only). Key pads will replace the existing internal FOB access points. This work is scheduled for Wednesday 5/17. Installation was pretty uneventful so far and most employees seem to like the easy access to the buildings (if they are badged). We have identified a few areas that need to be added, DO inner door and Special needs access at WPS.   Camera systems 8 cameras are installed at WPS, Getting ready to install WIS cameras next and will tackle the WMS complex during the summer. We are doing this project with in house labor as time permits, which is somewhat slowing down the progress of this work Portable install WPS Permits in hand, final grade complete, well outer collar removed and well head cut to grade. Received low voltage/simplex and fire quotes yesterday and plan to issue PO’s this week. Once high voltage plans are done they will be sent to department of Labor and Industries for plan review. I expect this to happen next week.

FACILITY CHARTS – POWER COST AND WORK ORDER STATUS

FACILITY CHARTS – WATER USAGE WHS, WIS, WMS, WPS

SAFETY Accidents for the month There were a total of 6 injuries/incidents in the month, 4 student, 2 Staff Staff Accidents/Incidents (2) WHS – Employee hit knee on podium WPS – Employee was kicked during de-escalation activity Student Accidents/injuries (4) WHS – Student injured collar bone when playing soccer WHS – Student dropped weight on foot while moving them WPS – Student slipped on play structure bruised WPS - Student got foot stuck on spiral bar on play structure

SAFETY CHARTS