Detailed planning for fish farm construction Once the site has been selected, then initiation of planning begins. There are two main related components.

Slides:



Advertisements
Similar presentations
Typical Plumbing System
Advertisements

Site Selection for a commercial aquaculture facility (ponds)
Earth Control Measures at Project Detail Site Location Marina Barrage.
Site Grading Site Grading Civil Engineering and Architecture
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
Earthwork Operations & Equipments
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Carpentry Skilled Trades 1201 Footings and Foundations.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Timber Harvest Planning Course Learning Objective: Be able to describe the harvest planning process including different levels (or types) of harvest plans,
Measuring Sitework, Excavation, and Piling
E4014 Construction Surveying
Council Bluffs Value Engineering Workshop
Cortney L. Ohs, Ph.D. Aquaculture Ponds. Topics Site Considerations –Water –Soil –Topography –Types of ponds –Cost Construction of ponds –Levee ponds.
Foundation Systems.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Contour and Topo map Applications Profile View (Longitudinal Sections): Roads, Canals, Pipes,… Cross-Sectional View, Roads, Canals, Pipes, Building,…
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
CONSTRUCTION. Construction Systems –Early people lived in caves or in the brush --- teepees from animal hides were used –Wood, stone, mud and straw were.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
CONSTRUCTING A FIVE CABIN LATRINE
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Erosion Control/Damage Topic H. Erosion & Sentiment Control Defined by: – Environmental Regulations – State and federal laws – Standard specifications,
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
Sources of water (RAIN)
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
E4014 Construction Surveying Pavement Setout. Road Construction Consists of a number of sequential steps –clearing –earthworks –drainage works –pavement.
Preparing Foundations for Cylinders & ASME Tanks
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Road Construction Technology
By: Rick Ayers Yates County Soil & Water Conservation District
MELBOURNE CRICKET GROUND RECONSTRUCTION Written by Gary Thomas.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Ruttinger & Sons Engineering Designed by: Taylor Kasperick Jacob Wilson Loren Ruttinger Presented by: Loren Ruttinger.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Track Drainage CE2303 Railway Engineering. Drainage-General Drainage is the natural or artificial removal of surface and sub-surface water from an area.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
AIRPORT SURVEYS.
EXERCISE: A 0.04ha pond has to be built in clayey soil with dikes 1.50m high and 1m wide at the top. If SD = 1.5: 1 and SW = 2:1. Calculate the base width.
Interpreting a contour map
Researching Designs.
REINFORCED EARTH STRUCTURES
Foundation – jay Desai.
CONSTRUCTION OF A DTF DO’s and DON’Ts.
Substructure Groundworks - Hazards
Design process.
Design and Construction of Composite Lined Landfills
Visit for more Learning Resources
Water Conveyance and Control
EXAMPLE A 400 m2 (40 x 10 m) area is to be excavated, 1 m deep, with side slopes 2:1. As the width (10 m) is less than 30 times the depth (30 x 1 m), the.
What is surveying? ☞Surveying is the branch of applied mathematics which deals with measuring and recording of the size and shape of any portion of the.
LEVELLING This deals with the determination of the relative heights of points on the earth’s surface. The process of this determination is either direct.
Mixing our Concrete.
Site Grading Site Grading Civil Engineering and Architecture
Investigation of Road Project
Components of Stormwater Management Systems
Spoonful farms side channel preliminary design
IRRIGATION PRINCIPLES
Storm Water Storage and Treatment
PLUMBING PLANS CHAPTER 31
Typical Plumbing System
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Location Plans & Site Plans
FBE05 – Mathematics and Statistics
Design process.
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
PWCS Fifth Edition DIVISION 1000 Edits
Public Works Standard Drawings Subcommittee Meeting
FBE05 – Mathematics and Statistics
Presentation transcript:

Detailed planning for fish farm construction Once the site has been selected, then initiation of planning begins. There are two main related components of planning in construction. These include: a) Organizational planning ––decides where, how and which order the farm is to be built. b) Physical planning –– decides on layouts, detailed design and earthwork. SITE SELECTION Students are to be given practical exposure with training manual on the necessity of these aforementioned factors RECONNAISSANCE SURVEY Water - soil - topolograpy No Does site meet requirement? Return to site selection process Yes DETAILED SURVEY Yes Soil - Topography Try out sketches of the layout Do they meet your needs? Is there a problem with? Yes the site? Prepare detailed draft layout Earthworks and water levels satisfactory? No ALL ok? Yes Prepare final detailed Design Prepare final evaluation of the site Figure 2: Flow - chart on matching the fish farm and its layout to the selected site Things include: 1. Time of construction 2. who will construct the fish farm ? 3. How will the construction be carried -out? These when critically considered, may lead to further activities such as a) Some more detailed plan and drawings b) A series of specifications for the contractor c) A detailed schedule of activities will be drawn. Steps involved in earthen ponds construction The following steps are required: · Clearing of proposed site · Setting-out which involves site clearing · Mark-out the areas inlet and outlet · Topsoil removal and storage · Construction of embankment · Construction of inlet drainage pipes / water control structures · Construction of screen at both inlet and outlet. Figure 2 is to be used in ensuring proper and appropriate appraisal of the work to be done. Assignment: students are expected to visit any chosen location at COLERM field and carry-out fish farm site selection exercise and prepare a report Steps involved in block tanks for fish farming · Clearing of proposed site · Settings-out which involves pegging and lining with the rope · Topsoil stripping to form strong basement · Surface blinding with concrete mixture (sharp sand, cement , and gravel/ granite at ratio 3:1:6) · Block laying and stuffing of holes with concrete mixture · Placement of water inlet and outlet pipes · Plastering of tanks Calculating dike and excavation volumes Width of the dike base Base width = crest width + (CH x SD) + (CH x SW) Where CH (in m) = construction height SD = slope ratio of dry side SW = slope ratio of wet side While estimating this, use the constructing height as well as the settlement