Design process.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Construction Contracting
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Preservation Tax Incentives for Historic Buildings A Joint Program of the following agencies: Department of the Treasury Internal Revenue Service Department.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
Chapter 1 Professional, Architectural Careers, Office Practice, and Opportunities.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
FHA 203K IS ONE LOAN FOR A PURCHASE OR REFINANCE, THAT ALSO FINANCES HOME IMPROVEMENTS. WHILE THE FHA 203K HAS MANY ADVANTAGES, ITS PRIMARY BENEFIT IS.
Owner Has Idea and Conducts Feasibility Study GoNo Go End of Project Pursue A/E Hire A/E to Design Project Scope of Work Defined Contract Negotiated Go.
Construction Management Copyright © Texas Education Agency, All rights reserved. 1.
How A TV Commercial Is Made.  Client meets with the advertising agency and outlines their marketing problems and the product they are marketing  Client.
Preparing the Bid Package (A Developers Perspective)
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
What are they? How can I do them too? Construction + Materials IV: Construction Documents.
You passed the Bond or secured some funds What do we do now? 2014.
Milestone Meeting Milestone Meeting Client Activity / Task Client Activity / Task Design For Health Activity / Task Design For Health Activity / Task Document.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Construction + Materials IV: Construction Documents What are they? How can I do them too?
Construction Management At Risk Process
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 UNIT 6 Fields, Careers, Work Skills.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Project Management – What is it?
Job site An Inside Look…
BLAKELY  Welcome.
Westshore Exterior Renovation Project 02/16/17.
Polices, procedures & protocols
City of dayton department of economic development
Architecture, Civil Engineer, and Interior Designer
CRM Anywhere.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
The Writing Process.
CONTRACT DOCUMENTS.
Project Title Livingston High School
Minnesota Resort and Campground Association Fall Conference
Applications of Technology
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Architecture during Construction ‘observation administration’
The project's conception: A feasibility study is done
Architect A Person who works closely with clients to design structures by making preliminary drawings, sketches, and suggestions for material to be used.
Pre-contract Planning and Practice
The Development Process
Monday 14th May – Friday 18th May 2018
MODULE 2 – Project Introduction
THE ROLE OF THE PLANSET IN CONTRACT DOCUMENTS
Chapter 3 Resolution and Design.
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
PROJECT DELIVERY METHODS
APPLICATION PROCESS Parents access the web address: to be on the “Welcome to Admissions Online Application for 2019” page.
2-1-1 Automated Verifications
Preparing for a Career in Architecture
Design process.
House Construction Budget Plan
TCU-PROJECT: 7TH Semester Course
FIVE PROJECT PHASES.
Multi-Family Fourplex Apartment
Construction Management Services April 16, 2018
National Visitor Use Monitoring
ROLE OF ARCHITECTS ABHISHEK RAJ. Architect makes a plan, designs and then review the process of building construction. Architect is a person who makes.
Project Manager / Utility Liaison
RIBA Plan Tom Robinson sir david Swindells Vii
Architecture & Interiors Design Process
Presentation transcript:

Design process

Standard Students will identify components related to the design process.

What are the steps in the design process – landscape architecture https://www.youtube.com/watch?v=tSBudZayrng

What are the steps in the design process – architecture https://www.youtube.com/watch?v=pv-O5VdVjdM3 minutes

Phase 1: interview and initial discussion Often a client will interview with a couple of architects Allows homeowner and architect to figure out if they are a good fit Typically architects have a portfolio of past projects to review

Client interviews

Phase 2: information gathering and documentation Discuss homeowner goals, needs and requirements Architects visit site, review existing conditions and take measurements Create set of as-built plans - copy is given to homeowner for their records As-built plans: simple floor plans and exterior elevations – a minimal set showing what currently exists on site   A surveyor is contacted and scheduled to produce a site survey

Phase 2: information gathering and documentation The architects visit the city/county building department to review records: As-built drawings of existing home; previous surveys; public records Architects gather information from state and city agencies regarding specific land use and building code requirements Architects create a work plan to outline what will be done and by when

Phase 3: Schematic Design Architects take information gathered from client and from field surveys to create several design options for clients to consider Generally present options in the form of sketches Attach a rough cost estimate to each option to aide client in selecting a design that meets both aesthetic preferences and budget requirements Sequence of how you approach the house and move through it is explored Client will have the opportunity to request modifications to make to the design

Beach House design video https://www.youtube.com/watch?v=vmHoGicPQQQ

Organic forms video https://www.youtube.com/watch?v=fwJB7KzDEbQ

Phase 4: Design Development Take schematic design client selected and any requested modifications, and revise it Update cost estimate provided during the previous phase to reflect changes made to initial design Strive to provide accurate estimates throughout early stages of design Phase may require additional give and take while finalizing details of the design before moving to next phase

Phase 5: Construction Documents Settled on a final design and will begin preparing drawings, notes, and technical specifications necessary for bidding, construction, and permit application Contractors use detailed drawings and specifications to prepare for the next phase in the architectural design process This is the phase that many people think of when they picture the work of an architect – the creation of plans

Phase 6: Bidding Architects will aid client in developing a list of qualified contractors for a bid list and submit bid packages to bidders They also review submitted bids, provide analysis, and help compare the cost figures received from bidders This phase will ensure the contractors clients are considering for construction project are reading the blueprints correctly and are providing an accurate bid for the project

Phase 7: Construction Administration Once client has selected a contractor and construction is under way the final phase begins Architects will administer the construction process to assure conformance with design intent, visit the site during construction, and address any field conditions as they arise

Love it or list it http://www.hgtv.com/shows/love-it-or-list-it/love-it-or-list-it-season-11-video-highlights-videos Love It or List It : Daily Dysfunction

Love it or list it/House hunters http://www.hgtv.com/shows/love-it-or-list-it/love-it-or-list-it-season-11-video-highlights-videos Love it or List it: Nine is Enough 3 minutes