Freeport Area Master Plan Project -

Slides:



Advertisements
Similar presentations
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
2015 RTP Update January, 2015.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to WMS Austin, TX August 10, 2011 Kenneth A. Donohoo, P.E.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Houston Area Dynamic Reactive Project March 11,
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
RPG Meeting Five Year Plan Extension Brad Schwarz.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Houston Import Project – ERCOT Independent Review
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to ROS Austin, TX August 11, 2011 Kenneth A. Donohoo, P.E.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Freeport Area Master Plan Project
Planning Geomagnetic Disturbance Task Force (PGDTF) Meeting Material
Transmission Planning in ERCOT- Overview
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
ERCOT 2011 Five-Year Transmission Plan Update
WECC Load Modeling and Validation Group Meeting
Warren Lasher Manager, Long-Term Planning and Policy
RMR Exit for Spencer 5 – Remedial Action Plans
Study Scope - Quarterly Stability Assessment
Modifications to Planning Charter
Compliance Report to ERCOT TAC February 2007
Reliability and Operations Subcommittee Report
I-5 Corridor Reinforcement Project
Local Area Planning Update to TRANSAC – September 26, 2018
WECC Load Modeling and Validation Group Meeting
Palo Verde-COI RAS Retirement
Palo Verde-COI RAS Retirement
Excelsior Energy’s Mesaba Energy Project
Big Stone II Study Update
Presentation transcript:

Freeport Area Master Plan Project - ERCOT Independent Review Update August 22, 2017

Overview CenterPoint submitted Freeport Masterplan Project for Regional Planning Group review. This is a Tier 1 project that is estimated to cost $246.7 million. Proposed for 2019 – 2021 timeframe To serve new committed loads Reliability Issues Severe low voltages Overloads Difficulty of maintenance outage scheduling Provide Operational Flexibility

Study Assumptions Steady-State Study Case Constructed from latest 17RTP reliability cases 2019, 2020 and 2022 summer peak EC base cases (2017 June MIS posting) Study Region will consist of Coast Weather Zone with focus on Freeport Area Transmission Projects expected to be in-service within the study region by 2019, 2020 and 2022 at the time of the study were added to the cases PH Robinson 800 MVA autotransformer addition RTP reliability projects in the study region that are not approved were backed out Freeport ‘Bridge the Gap Upgrades’; Bailey to Jones Creek 345 kV double circuits Total Freeport Area Load (Industrial + Distribution) modeled in the study cases are *Based on the in-service date of Oct 1st, 2019 Cortez and Levee Phase-3 loads (265 MW) are modeled only 2020 and onwards. YEAR TOTAL LOAD, IN MW 2019* 1979 2020 2254 2022 2275

Contingencies and Criteria Initial Steady-State Reliability Analysis Contingencies for Study Region NERC TPL-001-4 and ERCOT Planning Criteria (http://www.ercot.com/content/wcm/current_guides/53526/04_050115.doc ): P0 P1-1, P1-2, P1-3, P1-4, P2-1, P2-2, P2-3 (All EHV only) P3-1, P3-2, P3-3, P3-4, G-1+P7 {G-1 worst case only} P4-1, P4-2, P4-3, P4-4, P4-5 (All EHV only) P5-1, P5-2, P5-3, P5-4, P5-5 (All EHV only) P6: X-1 + (P1-1, P1-2, P1-3, P1-4, P7-1) {X-1 is 345 kV Auto outages} P7-1 Criteria: Thermal Monitor all transmission lines and transformers in study region (excluding GSU and PUNs) Use Rate A for Normal Conditions Use Rate B for Emergency Conditions Voltages Monitor all busses 100 kV and above 0.95 < 1.05 Normal 0.92 < 1.05 Emergency Voltage deviations exceeding 8% on non-radial load busses

Preliminary Results – 2019 Study Case Violations Initial Steady State Contingency Analysis - DOW 345/138 kV autotransformers overloaded >160% under P6 (2 DOW company XFMRs outage) 4th DOW autotransformer was added to study cases 2019 and onwards For all the contingency categories tested, 2019 study case had no additional relevant bus or branch violations

Preliminary Results – 2020 Study Case Violations P1, P2-1, P7 -> No Violations P2-2, P2-3, P4-2, P4-3, P4-4, P4-5, P5 -> # Unsolved Contingency Branch Violations Bus Violations Element kV Loading (%) None STP to Jones Creek Ckt 18 345 102.75 P3 (G-1 + N-1) -> # Unsolved Contingency Branch Violations Bus Violations Name kV Voltage (PU) None DOW 345 0.905 Jones Creek 0.908 DOW Chemical (POI buses) 138 0.872 P6-2 (X-1 + N-1) -> # Unsolved Contingency Branch Violations Bus Violations Name kV Voltage (PU) None DOW Chemical (POI buses) 138 0.895

Preliminary Results – 2022 Study Case Violations P1, P2-1, P7 -> # Unsolved Contingency Branch Violations Bus Violations Name kV Voltage (PU) None DOW 345 0.919 DOW Chemical (POI buses) 138 0.895 Post Contingency Voltage Deviations Above 8% -> Name kV Deviations(%) Jones Creek 345 9.06 Camden 138 8.28 Sintek 8.16 P2-2, P2-3, P4-2, P4-3, P4-4, P4-5, P5 -> # Unsolved Contingency Branch Violations Bus Violations Element kV Loading (%) None STP to Jones Creek Ckt 18 345 103.28

Preliminary Results – 2022 Study Case Violations P3 (G-1 + N-1) -> # Unsolved Contingency Branch Violations Bus Violations Element kV Loading (%) Name Voltage (PU) 2 Oasis to WA Parish 345 102.59 DOW 0.87 Basf to Hofman 138 111.31 Jones Creek 0.871 DOW Chemical (POI buses) 0.835 P6-2 (X-1 + N-1) -> # Unsolved Contingency Branch Violations Bus Violations Name kV Voltage (PU) None DOW 345 0.908 Jones Creek 0.911 DOW Chemical (POI buses) 138 0.865

Dynamic Analysis Data: Case modifications: LT2023 DWG Flat start data set CNP Load model Contingencies filtered based on area of study Case modifications: Load changes to match with forecasted increase in signed load for study area (confirmed with CenterPoint)

Dynamic Analysis Phase I: VSAT analysis with SSWG contingencies + project contingencies submitted by CNP P1, P2,P4,P5 and P7 Filtering based on top limiting contingencies from voltage stability standpoint Convert and generate P3, P6 contingencies based on filtered set Phase II: Transient study for events: VSAT analysis + CNP list + SSWG converted contingencies (Study area) Monitor bus Transient Voltage Recovery and relay trip events

Next Steps Complete the Steady State and Dynamic Stability Analysis Identify and evaluate project alternatives Sensitivity Analysis Higher Load (potential loads) PGRR0042-Generator additions with Signed Interconnection Agreements that DO NOT meet Planning Guide Section 6.9 criteria in study region Tentative Timeline Final EIR update to RPG – September EIR recommendation to TAC – September BOD Endorsement – October

?