MTS Working Group January 28, 2016

Slides:



Advertisements
Similar presentations
PacifiCorp-CAISO EIM Initiative Overview
Advertisements

Integrating Distributed Energy Resources 2015 Austin Electricity Conference AT&T Conference Center April 9, 2015, Page 1 Daniel Violette, Managing Director,
Topics to Cover Interconnection Process Overview
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
1 The Tres Amigas SuperStation VLPGO November 2011.
Frankfurt (Germany), 6-9 June 2011 ARCHITECTURE AND FUNCTIONAL SPECIFICATIONS OF DISTRIBUTION AND TRANSMISSION CONTROL SYSTEMS TO ENABLE AND EXPLOIT ACTIVE.
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
Demand Response Use Case & Functional Requirements Development UCAIug Meeting Jan 6, 2009 Mark van den Broek.
Overview What's is micro grid Over view of electric grid
0 Distributed Energy Resources: Going Small IEP 2015 Annual Conference September 30, 2015 Colin Cushnie V.P., Energy Procurement & Management Southern.
Brussels Workshop Use case 3 11/09/2015 Mario Sisinni.
FERC Staff’s Report on Demand Response and Advanced Metering.
Transforming the Distribution Grid
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
MTS Working Group October 8, Introduction More Than Smart Mission – Enabling state integrated distribution grid efforts 1.Continue the work of.
UM 1751 Energy Storage Workshop #3 May 9, UM 1751 Workshop #3 Topics Most viable and beneficial applications (HB 2193 time frame: ) Emerging.
Getting the Architecture Right Jeffrey D. Taft, PhD Chief Architect for Electric Grid Transformation Pacific Northwest National Laboratory March 17, 2016.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
MTS Working Group San Francisco F2F Agenda Mar. 23, 2015.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
JOINT WORKSHOP ON MULTIPLE-USE APPLICATIONS. AMS’S 50 MW FLEET FOR SO. CAL EDISON MULTIPLE USE CASE #5: BEHIND- THE-METER DISTRIBUTED ENERGY RESOURCES.
DER Provide Grid Services for the 21 st Century Electric System Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy More Than Smart Conference.
Integrated Capacity Analysis Working Group June 9, am – 12 pm CPUC Golden Gate Hearing Room drpwg.org.
Eric Peirano, Ph.D., TECHNOFI, COO
Locational Net Benefit Analysis Working Group
JU September Stakeholder Engagement Conference Webinar #1
LNBA Subgroup: Avoided Transmission Value
Modeling DER in Transmission Planning CAISO Experience
A Webinar to Present: Coordination of Transmission and Distribution Operations in A High Distributed Energy Resource Electric Grid Featuring: Lorenzo Kristov,
Transmission-Distribution Interface Working Group Meeting
Considerations for a Modern Distribution Grid
Locational Net Benefit Analysis Working Group
Devin Rauss Building California’s Flexible Grid October 27, 2018
Asia-Pacific Energy Regulatory Forum
Locational Net Benefit Analysis Working Group
August ICA Agenda Time Topic 8:00 – 8:15
Next Generation Distribution System Platform (DSPx)
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Demand Control Field Trials
Electricity Wholesale Markets: Designs for a low-carbon future
Recipe for a Transactive Energy Implementation for Microgrids
August LNBA Agenda Time Topic 1:00 – 1:15
Transmission-Distribution Interface Pilot Proposal
Integrating Distributed Energy Resource into Grid Operations
ISO/IOU T&D Interface Update Thomas Bialek PhD, PE Chief Engineer
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
The Transition to a High DER Future
Quality Management Systems – Requirements
Operating a modern renewable-based grid
The Future of Demand Response in New England
Opportunities in the Changing Energy System

New England Electricity Restructuring Roundtable
CMPLDWG Composite Model with Distributed Generation Approval
Introduction to Growth Scenario Working Group
More Than Smart Framework Focus on Lifecycle Process Changes to Achieve Objectives
EnergyNet The National Technology Initiative
Coordinate Operations Standard
EE362G Smart Grids: Architecture
Wind & Transmission: The Clean Energy Superhighway
PacifiCorp-CAISO-NVE EIM Initiative Overview
Virtual Power Plants Demonstrations Information webinar
CMPLDWG Composite Model with Distributed Generation Approval
DECISION
Developments in Connecticut
Waleed Iftikhar Michel Mabano
DER Growth Scenarios and Load Forecasts Working Group
The Future Grid and Energy Storage
Presentation transcript:

MTS Working Group January 28, 2016

Transmission - Distribution Operational Interface

The Context Growth of DER creates operational challenges at the transmission-distribution interface DER and DER aggregations bid into ISO market and receive dispatch instructions ISO “sees” DER as if they’re located at the T-D substation => ISO does not know impact of its DER dispatches on the distribution system Distribution operator (DO) must manage the system with numerous diverse DER, some acting autonomously, some responding to ISO dispatches, some able to provide DO services These activities require new arrangements for coordination between DO and ISO

MTS mission … if we choose to accept it Begin to detail the three-way relationship between (1) the DER or DER aggregation provider participating in the ISO wholesale market, (2) the ISO and (3) the DO What is needed in the high-DER context to ensure reliability of distribution system operation and the T-D interface? Real-time visibility, communication Informing the DO of DER/DERA schedules and dispatches Operating procedures to manage dispatches of multiple DER/DERA in the same local distribution area DER services to support DO real-time operations ISO – wholesale market DER/DERA/ DERP Distribution Operator (DO)

Next Steps for IOUs to Consider - Planning Establish Process (or Registry) for tracking all resources participating with a DERP Verify individual resources are not participating in other programs or part of other DERPs that could result in “double counting” of benefits Ensure participating resources have valid interconnection agreements Ensure participating resources are planned to be operated consistent with respective interconnection agreements Modify Electric T&D Planning Processes Develop process for assessing DER Aggregator impacts Deliverability Assessment for DERPs Streamline process for modifying interconnection agreements to better align with respective DERP’s proposed operation Determine DER hosting capacity at the T&D interface point (e.g. substation level) and coordinate with the CAISO Review Interconnection Standards for resources participating with a DERP

Next Steps for IOUs to Consider – Operations DER Dispatch Coordination Establish process for DER operations to be shared with the distribution system operator to which the DERs are connected. Utility distribution company needs to be aware of CAISO DER dispatch instructions DER Aggregation Monitoring Systems Provide operational visibility to DER aggregation operations for distribution operation

MTS Working Group March 1st, 2016

Proposed 1H 2016 CA WG Focus TOPIC 1: Integrated Distribution Planning Process (IDPP) Define an IDPP that integrates California energy planning, interconnection processes and investment planning to achieve state policy objectives WG Leads: Kevin Joyce & Mark Esguerra (Laura Manz for MTS) TOPIC 2: Transmission-Distribution Operational Interface Identify and develop process recommendations for Transmission-Distribution Operational Interfaces between CAISO and utility distribution operators to enable CAISO DER Initiative by April 1st WG Leads: Mark Esguerra & Lorenzo Kristov (Paul De Martini for MTS) TOPIC 3: Distribution Portfolio Framework Identify issues, frame considerations and develop a Distribution Portfolio Framework that can inform the IDER and DRP proceedings along with other CA policy considerations WG Leads: Heather Sanders & Merrian Borgeson (Paul De Martini for MTS)

Transmission - Distribution Interface

Subteam Objective Develop a coordination framework for the distribution utility (UDC) and the wholesale market and transmission operator (ISO) to coordinate activities to ensure stable, reliable operation of the distribution and transmission systems and their interfaces, in an electric system that features high penetration of DER, both behind and on the utility side of the meter. Form of final deliverable to be determined

Proposed Approach Describe the context Focus on single local distribution area (LDA) = single T-D substation High volume & diversity of DER, with wholesale market participation Specify a sequence of use cases or scenarios Identify essential elements that must comprise a coordination framework for each use case Aim for a comprehensive picture; stay out of the weeds Do it for the simplest use case first; add complexity only after having a complete picture for the simplest case Focus on real-time operations first; let real-time operating needs drive any forward requirements (Only later) Develop specific design details for implementing the needed elements

Sequence of Use Cases Medium-size end-use customer, with a mix of BTM devices, participating in wholesale market Customer/resource is a single POI on the distribution system May be a micro-grid or smart building Virtual resource = aggregation of diverse sub-resources at different POIs on distribution grid Wholesale market participants Sub-resources on both sides of customer meter Passive end-use customers with BTM solar plus storage – not in wholesale market All of above, plus merchant DG and storage on utility side, bi- directional DR in wholesale market

Some Elements of a Coordination Framework Information exchanges between UDC, ISO, DER – specify content and timing Short-term forecasting (real-time to day-ahead) of net load and autonomous DER behavior Situational awareness – sensing and data systems Ability to calculate expected distribution system impacts of ISO dispatches of DER; “feasibility” of ISO dispatches Control systems & DER services needed to support UDC operations Operating procedures to deal with the unexpected Procedures for sharing revenue-quality meter data for financial settlements Regulatory oversight

Next Steps Get together for a working session in March Pick first use case and describe the scenario in detail Maintain the “start simple” principle, perhaps using a sequence of sub-cases of the use case and adding complicating features one at a time Describe the needed elements of the coordination framework as comprehensively as possible, without getting hung up on details (e.g., software apps or technologies) Gradually work through more use cases, building the coordination framework as needed for each new scenario

Draft for discussion purposes only MTS Working Group Transmission-Distribution Interface Sub-team March 11, 2016 sub-team meeting, San Francisco

Proposed approach for today’s meeting Review sub-team framework & context assumptions Focus on single local distribution area (LDA) = single T-D substation High volume & diversity of DER, with wholesale market participation Specify the first use case or scenario For that use case, identify the needs or essential elements of a coordination framework for reliable operations Start with real-time operational requirements (e.g., voltage stability, phase balance, flow limits, etc.) Work backwards from real-time to identify forward requirements at various time frames (see diagram next page) Focus on communication/coordination needs – don’t try to solve how to meet the needs at this point in our process As time allows, specify the second use case and repeat step 3 for that case Draft for discussion purposes only

First two use cases In addition to “non-participating” end-use customers, some having rooftop solar PV, the LDA has one or more large commercial customers with behind-the-meter devices that enable them to provide imbalance energy and A/S to the wholesale market Each such customer/resource is at a single point of interconnection on the distribution grid; i.e., no aggregation over multiple POIs Assume initially the resource does not provide distribution services Expand the previous case to include one or more “virtual” resources, each resource an aggregation of sub-resources at different POIs within the LDA, each resource able to participate in the wholesale market Again, assume initially the resources do not provide services to the distribution utility Draft for discussion purposes only

Distribution and transmission time frames Distribution operations Two-weeks: outages, etc. Day-ahead scheduling Intra-day scheduling Real-time 45 days – major outage scheduling Multi-day-ahead unit commitment Day-ahead scheduling Intra-day unit commitment 15-min dispatch 5-min dispatch Real-time Real-time bids at T-75 min Transmission & wholesale market operations Draft for discussion purposes only

Some elements of a coordination framework Information exchanges between UDC, ISO, DER – specify content and timing Short-term forecasting (real-time, day-ahead, weeks ahead) of net load and autonomous DER behavior Situational awareness – sensing and data systems Ability to calculate expected distribution system impacts of ISO dispatches of DER; “feasibility” of ISO dispatches Control systems & DER services to support UDC operations Operating procedures to deal with unexpected conditions or conflicting needs Procedures for sharing revenue-quality meter data for financial settlements Regulatory issues related to the above Draft for discussion purposes only

Sub-team objective Develop a coordination framework for the distribution utility (UDC) and the wholesale market and transmission operator (ISO) to coordinate activities to ensure stable, reliable operation of the distribution and transmission systems and their interfaces, in an electric system that features high penetration of DER, both behind and on the utility side of the meter. Form of final deliverable to be determined Draft for discussion purposes only