Settlement Update Austin Rosel ERCOT February 27, 2017.

Slides:



Advertisements
Similar presentations
May 18, 2009 SEWG Dispute due dates when extracts are delayed Art Deller.
Advertisements

Concerns with RUC Capacity Short Charge and Energy Trades.
Zonal ADR Resettlement & Data Retention ERCOT CSWG 04/20/2015.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
1 Nodal Stabilization Market Call December 28, 2010.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
1 Review of Aging Projects Additional Materials July 16, 2015.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
COMS Nodal Commercial Systems Project Update COPs Meeting May 2007 By Bill Barnes and Justin Rasberry.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
August 10, 2010 COPS Nodal EILS Update Mandy Bauld.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Resource Cost Working Group October 7, 2015 WMS Update.
Resource Cost Working Group December 2, 2015 WMS Update.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
Pre-Pay Account Updates Matthew Tozer ERCOT CWGW 9/23/2013.
1 Protocol Clarification: Section , Resolution of Dispute Notification of Financial Impact of Granted and Granted with Exception Disputes COPS.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Dispute Management System Business Requirements ERCOT.
Scheduling and Operating Transmission Devices in the Nodal Environment.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
COPS NOVEMBER 2012 UPDATE TO TAC 11/01/2012 Harika Basaran, Chair Jim Lee, Vice Chair.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
SGR issues associated with ICCP. 2 ICCP handbook update Split Generation Resources Split Generation Resources are modeled separately by each.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
PRS Workshop- NPRR755/NOGRR154 WAN communications of Critical Market Data and Agency-Only QSE Feb 29, 2016.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
1 Commercial Operations Working Group Update to TAC April 7, 2005.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Statements and Calendar Business Requirements Settlements.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 05, 2008.
LPGRR060, Load Profiling Guide Clean Up Related to LPGRR057
Protocol Revision Subcommittee
Exceptional Fuel Costs in LMP
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
ERCOT Market Design & Operations
August 25, 2016 TAC Update to COPS
Current FRRS Language & Explanation of Posted Data
RTDF Overview of Data Analysis & Status of “Consesus Items”
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Ancillary Service Trades and Ancillary Service Settlement
Settlement Update Austin Rosel ERCOT October 11, 2017.
Texas Nodal EMS Forced Outage Detection Business Requirements Document Carlos Gonzalez-Perez – August 21st,
QSE Managers Working Group July 11, 2011 Base Point Deviation – NPRR377 ERCOT Settlement & Billing Group 1.
Settlements Analysis due to SFT Deration Issue
Project Update and Summary of Project Priority List (PPL) Activity
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Presentation transcript:

Settlement Update Austin Rosel ERCOT February 27, 2017

Agenda 2017 R1 Settlement Implementations NPRR272 - Definition and Participation of Quick Start Generation Resources NPRR649 - Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides NPRR764 - QSE Capacity Short Calculations Based on an 80% Probability of Exceedance (P80)

NPRR272 Definition and Participation of Quick Start Generation Resources. Covers “Revisions for which implementation is not necessary prior to the Texas Nodal Market Implementation Date” that were grey-boxed after the implementation of NPRR272. Section 3.8.3 The QSE for a Quick Start Generation Resource (QSGR) that is available for deployment by SCED shall set the COP Resource Status to OFFQS… The QSGR shall telemeter a Resource Status of OFFQS… ERCOT QSGR settlement process adjusted to consider the new telemetered status code for determining a QSGR start. No changes to systems or settlement extracts for this NPRR.

NPRR649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Covers “compensation mechanism for Generation Resources that are issued a High Dispatch Limit (HDL) manual override that results in a real power reduction” to “ensure Resources are not financially harmed by following ERCOT reliability instructions” Dispute driven process in which the QSE must have incurred a demonstrable financial lost. QSE must provide an attestation by an officer or executive as well as documentation and calculation of the loss.

NPRR649 Payment Charge

NPRR764 QSE Capacity Short Calculations Based on an 80% Probability of Exceedance (P80) Corrects conflicting protocol language on data used in HASLSNAP for PVGR/Solar units. Greyboxed language directed P80 values to be used in settlement where blacklined language directed settlements to use P50 via COP. This NPRR cleans up language and directs settlements to use P80 values. Two new bill determinants, WGRPP and PVGRPP, will be used as the available capacity (HASLSNAP) of wind and solar units respectively.