Executive Summary GFR has been successfully implemented on 22th April 2014 POC MATARAM: Perceived Drop Rate, SDCCH Drop Rate, SDCCH Success Rate , TBF.

Slides:



Advertisements
Similar presentations
Cotonou, Benin16-17July 2012 OMC/R Raw DATA Christian BLANCHARD CEO Planet Network International ITU-T Workshop on Practical measurement of QoS/QoE Parameters.
Advertisements

Source: GSM Association, 2010 Mobile Networks. Source: GSM Association, Coverage and Capacity Mobile communications networks are designed for both.
Tutorial 6 Mobile Communication Networks Mohamed Esam.
This document have the main steps to calculate the GSM traffic.
UGDIE PROJECT MEETING Athens September WP6 – Assessment and Evaluation  Evaluation Results  Deliverable D 13 (first release issued and delivered.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Kampala, Uganda, 23 June 2014 ITU-T Recommendation E.807: “Definitions and associated measurement methods of user-centric parameters for call handling.
Numbers
Improving Capacity in Cellular Systems
RF OPTIMISATION IN GSM NETWORKS Regional Telecom Training Centre, Trivandrum :
Capacity and Load Sharing in Dual-Mode Mobile Networks
Time. What Time is It? April 5, 2014 “normal time” Local time is the date/time reported by your PC. UTC, Coordinated Universal Time, popularly known.
1 Fort Collins Community Greenhouse Gas Inventory Bonnie Pierce April 30, 2013.
A smart signalling system for Indian railways Smart signalling system – user’s view Full capacity realisation Flexibility of movements Easy to operate.
Global momentum towards abolishing death penalty Point of view : Andrew Beswick 20 governments executed people last year (compared to 9 abolitionists in.
MohammaD AL-Khuffash, Rasool Bani Matar, Raja’y Kelany GSM Network Planning For Nablus City ( Third Phase ) Submitted to: Dr.Jamal Kharosha.
 decimals/cc-7th-fracs-to-decimals/v/converting-fractions-to-decimals-example.
Lucent Technologies Proprietary Use Pursuant to Company Instructions - All Rights Reserved GSM RF Planning and Engineering Aspects.
- 0 - KPIs Weekly Report Mobily LTE Date10 /1/ 2013 ReporterCentral MS OPT Team Central _Riyadh_ Cluster 5_LTE.
By: Anjaneya Datla. What are TDMA Systems? Time division multiple access (TDMA) is a channel access method for shared medium networks. Several users can.
CBC Research Toronto RT332007RD Vancouver AM/FM Radio Listening Trends: S September 2007 CBC Research.
Hwajung Lee. One of the selling points of a distributed system is that the system will continue to perform even if some components / processes fail.
Presentation of the Group Assignment ELEC - E7120 Wireless systems Group 7 Ricardo Alberto (519627) Suraj Gachhadar (546179) Katariina Aaltonen (85094P)
REPORT OF EVALUATION FUNCTION & ORGANIZATION OF CORE TEAM TO THE 2 nd HIGH VALUE SILK STEERING COMMITTEE MINISTRY OF COMMERCE Mr. SUON Prasith, EIF Program.
Faults and fault-tolerance One of the selling points of a distributed system is that the system will continue to perform even if some components / processes.
Maximum Value.
STI Proprietary1 St. Louis, MO September 21 st, 2004 AmpLink Rx 1900e GSM Field Trial.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
Optimization: Introduction. Contents  Global indicators  Typical Radio Network Problem  Coverage Problem  Interference problem  Unbalanced power.
TEMS Parameter. Module Objectives On completion of the module one should be clear about the parameters required during drive test what does it mean and.
KPI ANALYSIS REASONS AND SOLUTIONS.
Guide of Genex Assistant for LTE
Hammer Project KV020 S-KPI CBO
Celcom Golden cluster Post Drive test peak result
Simulation results for spatial reuse in 11ax
Project CA project T00087 oss KPI justification - Appendix CA Project
Faults and fault-tolerance
Hammer Project Celcom CA SSO Project
4G_CA project_OSS Justification
Hammer Project KV020 S-KPI CBO
Hammer Project KV020 S-KPI CBO
Hammer Project Celcom CA SSO Project
Celcom LTE CA Project_OSS
PC_SBE_09 WCDMA OSS Analysis
4G_CA project_OSS Justification
Celcom LTE CA Project_OSS
Hammer Project Celcom CA SSO Project
Project hammer PC_CA_SWE_07 CA Celcom CA Project
Hauwei hcs in dual band netwrok
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
2.5msec Frame structure for Mobility performance improvement
What are the Global Demographic Trends and Why are they Important ?
THANK YOU!.
an overall reduction of 13%.
Thank you.
Thank you.
Network-Health Report
Percentage of newborns admitted to neonatal intensive care unit with axillary temperature over 36.5°C on arrival (July 2016–April 2017). Percentage of.
Percentage of newborns admitted to neonatal intensive care unit with axillary temperature below 36°C on arrival (July 2016–April 2017). Percentage of newborns.
Practice before a Percentage Change on finding the amount using a
Philadelphia CL01 Initial Cluster Report
CAPACITY ASSESSMENT REGIONAL 09_SULAWESI From Active Cells, 6051 sites are already high users From 4675 Sites, only 0.8 % (37 Sites) with High CE.
Click Summary Value Button to Show Source of Integral or Time
Communication Driven Remapping of Processing Element (PE) in Fault-tolerant NoC-based MPSoCs Chia-Ling Chen, Yen-Hao Chen and TingTing Hwang Department.
GSM Radio Network Optimization. Absolute Radio Frequency Channel Number (ARFCN)  GSM 900 F U (n) = n MHz F D (n) = Fu(n) + 45 MHz Where: 1.
Percentages Find 35% of 200 Find 5% of 80 Increase 120 by 15%
Extended Usage of STKSA
Presentation transcript:

Global Frequency Retune (GFR) Report <AREA> XL – AXIS Integration Global Frequency Retune (GFR) Report <AREA>

Executive Summary GFR has been successfully implemented on 22th April 2014 POC MATARAM: Perceived Drop Rate, SDCCH Drop Rate, SDCCH Success Rate , TBF Fail Rate, HO Success Rate, TCH Availability, DL & UL Rx Qual 0-5 were improved after Global Frequency Retune (GFR) Implementation Traffic was decreased from < 288523.44 Erlangs> to < 277982.38 Erlangs> after Global Frequency Retune (GFR) implementation POC SELONG: Perceived Drop Rate, SDCCH Drop Rate, SDCCH Success Rate , TBF Fail Rate, DL & UL Rx Qual 0-5 were improved after Global Frequency Retune (GFR) Implementation TCH Availability & HO Success Rate were degraded after Global Frequency Retune (GFR) implementation Traffic was decreased from < 147843.56 Erlangs> to < 134282.11 Erlangs> after Global Frequency Retune (GFR) implementation

Summary – <MATARAM> GFR has been successfully implemented on 22th April 2014 Traffic degraded, on cells 26532 BLTG1, Already back to Normal KPI Description Before GFR After GFR Improvement/Degradation Percentage Remarks Perceived Drop Rate (%) 1.03 0.77 25.26 Improved SDCCH Drop Rate (%) 0.52 0.42 18.46 SDCCH Success Rate (%) 95.22 95.96 15.35 DL TBF Drop Rate (%) 2.20 1.75 20.25 TCH Availability (%) 98.48 98.68 13.30 HO Success Rate (%) 97.06 97.90 28.50 Traffic (Erlangs) 288523.44 277982.39 3.65 Degraded DL Rx Qual 0-5 (%) 95.45 96.65 26.51 UL Rx Qual 0-5 (%) 97.89 98.51 29.28

Improvement/Degradation Percentage Summary – SELONG GFR has been successfully implemented on 22th April 2014 TCH Availability degraded was caused by Alarm Permanent Fault on cells MT33539 BMTG2 HO Success Rate degraded was caused by Transmittion issue on cells 26671 B636_MONTONGGDG TCH Traffic <Erlangs> showing increase trend since 28 April 14 KPI Description Before GFR After GFR Improvement/Degradation Percentage Remarks Perceived Drop Rate (%) 0.96 0.85 11.31 Improved SDCCH Drop Rate (%) 0.59 0.54 7.95 SDCCH Success Rate (%) 94.74 95.13 7.48 DL TBF Drop Rate (%) 2.47 2.25 8.94 TCH Availability (%) 98.81 98.41 0.41 Degraded HO Success Rate (%) 96.79 93.03 3.88 Traffic (Erlangs) 147843.57 134282.11 9.17 DL Rx Qual 0-5 (%) 95.63 96.50 19.97 UL Rx Qual 0-5 (%) 97.95 98.40 21.72

MATARAM

MATARAM Execute Execute Perceived Drop Rate (%): Improved from 1.03 to 0.77 SDCCH Drop Rate (%): Improved from 0.52 to 0.42

MATARAM Execute Execute SDCCH Success Rate (%): Improved from 95.22 to 95.96 TBF Fail Rate (%): Improved from 2.2 to 1.75

MATARAM Execute Execute TCH Availability (%): Improved from 98.48 to 98.68 HO Success Rate (%): Improved from 97.06 to 97.9

MATARAM Execute TCH Traffic (Erlangs): Degraded from 288523.44 to 277982.38

MATARAM Execute Execute DL Rx Qual 0-5 (%): Improved from 95.45 to 96.65 UL Rx Qual 0-5 (%): Improved from 97.89 to 98.51

ISSUE TCH Traffic degrade on 27 April caused Flicker, Already back to normal

ISSUE Cell List Contributed Low T_Avail on 27 April2014

SELONG

SELONG Execute Execute Perceived Drop Rate (%): Improved from 0.96 to 0.85 SDCCH Drop Rate (%): Improved from 0.59 to 0.54

SELONG Execute Execute SDCCH Success Rate (%): Improved from 94.74 to 95.13 TBF Fail Rate (%): Improved from 2.47 to 2.25

SELONG Execute Execute TCH Availability (%): Degraded from 98.81 to 98.41 Already back to normal since 29 April HO Success Rate (%): Degraded from 96.79 to 93.03

SELONG Execute TCH Traffic (Erlangs): Showing increase trend since 28 April 14

SELONG Execute Execute DL Rx Qual 0-5 (%): Improved from 95.63 to 96.5 UL Rx Qual 0-5 (%): Improved from 97.95 to 98.40

Thank You