2012 Environmental Symposium Opening Address Naval Air Station Jacksonville 2012 Environmental Symposium Opening Address 17 August 2012
Naval Air Station Jacksonville Third largest naval installation in the United States OLF Whitehouse NAS Jacksonville Yellow Water Housing Rodman Lake George Pinecastle
2012 Recognitions Department of Defense Award for Best Naval Installation in the World Secretary of Navy and EPA Energy and Water Conservation Awards United Nations “Earth Trustee” Award
Wastewater Reuse Project Purple pipe from dechlorination chamber to reuse pond Zero discharge to St Johns River by 2014
Florida Building Code Sound Attenuation Measures First State in Nation to include sound attenuation measures in new construction around civilian and military airports based on Jacksonville ordinance change
P-8A Training Facility Project Description: Contractor Whiting Turner Contracting Co. Award Date Sept 2009 Completion Date Aug 2011 Contract Value $47.7M % Complete 84% Project Description: Two story, 165,665 SF integrated training facility for P-8A State of the art facility: 10 Operational Flight Trainers, 8 Weapons Tactics Trainers, 4 Part Task Trainers, Instructional and administrative spaces. LEED Features: Projected, pre-certification (LEED Gold) Characteristics include: Rain harvesting for plumbing, High efficiency mechanical equipment, No potable water irrigation, Photo-voltaic panels over parking lot, plus many other energy saving features Slide owner: KL 6
Conservation Measures Energy and Water Conservation Measures Old Lighting Status: Construction Ongoing Award Date Sep 2009 Completion Date Jun 2011 Contract Value $17.2M % Complete 99% New Lighting Project Description: Install new lighting, urinals and toilets, valves, pumps, etc. to provide energy improvements and reduce water usage. Total of 33 separate facilities. Slide owner: KL Status: Day lighting, Water conservation, UV Lighting, and Lighting installations are complete. Contractor is completing solar water system installation on five roofs. 7
Aviation Survival Training Center Status: Complete Award Date Sept 2009 Completion Date Sept 2010 Contract Value $1.1M Project Description: Install Solar Thermal (168) Flat Plate Collectors. Installation of (6) Natural Gas Infrared Heaters for pool area. Demo Existing Heating Equipment. Status: Producing in excess of 1 Mbtu/hour, heating the pool and providing domestic hot water showers and sinks Pool, shop areas and drying room heaters are installed. Slide owner: KL 8
Solar Powered Vehicle Over 80 electric vehicles
Sustainability through Partnerships