Part 75-1D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.

Slides:



Advertisements
Similar presentations
CONSTRUCTION DRILLING INC.
Advertisements

CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Environmental Drilling By: Josh Humphreys October 8,2006.
Foundations and basements
Grouted Push Pier Solutions Presentation by: Howard A. Perko, Ph.D., P.E. Magnum Geo-Solutions, LLC MAGNUM Informational Bulletin ISO-MPG-11A Copyright.
Advanced Construction Technology By Professor Chris Gorse & Ian Dickinson – licensed under the Creative Commons Attribution – Non- Commercial – Share Alike.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Drilling Fundamentals ©Dr. B. C. Paul 2000 Note – The types of drilling machines discussed in these slides reflect the author’s view of what is offered.
  AN-najah National University Faculty of Engineering Civil engineering Department Prepared by: Eng. Imad A. F. Jarara’h. Submitted.
Basic Civil Engineering-Foundation
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Soil and Rock Sampling. Environmental Site Characterization Number of samples taken depends on the size of the site Hollow stem auger normally used for.
DSI – Ductile Iron Micropiles International Society for Micropiles London, May 2009 Florian Stützel, DSI-TS.
METAL FOUNDATIONS The strongest, most durable, most reliable and most cost-effective alternative to concrete foundations. You can add personalized information.
5 th International Workshop on Micropiles Seattle, WA, September 24-27, 2003 A little reminder on the proper selection of micropile drilling technique.
Slop Stabilization Pertemuan
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Introduction: Excavations and other engineering constructions in the ground are central to many civil and mining projects. Ground reinforcement includes.
DIAGRAM Basic Foundation Design Basic Foundation Design Central Pipe Column.
Directional Drilling: A New Look At Mud Motor Design Connor Mills.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
No Cell Phones, Please. Thank You.. Division of Layne Christensen Company Specialty Foundation Construction Jet Grouting Drilled Micropiles Vibratory.
Outline of the Execution Manual for Seismic Retrofitting of Existing Pile Foundations with High Capacity Micropiles Masashi ITANI Takeshi OSHITA Seiichi.
STRONG PARTNERS FOR SMALL DIAMETERS Process technology for lying a drainage piping under ground water BOHRTEC PROCESS TECHNOLOGY.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
Foundation Loads Dead Load Live Load Wind Load
Drilling Interlocked O-Pile Walls with DTH + PPV FINLAND.
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
Extreme engineering Extreme engineering – part 1 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised.
Company and family presentation – part 4 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying.
Company and family presentation – part 5 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying.
Part 10-2b Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-2b, PP 2007, animation+p/r : compr.)
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Deep Replacement Presented by: M. Taromi
Part 10-1b Micropiles and self-drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-1b, PP 2007, animation+p/r : compr.)
Part 11 Concrete repairs - sealing of cracks and waterproofing (Part 11, PP 2007, animation+p/r : DEMO) ready Copyright notice Unauthorised.
Extreme engineering Extreme engineering – part 2 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Part 10-2a Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. II-2013) (Part 10-2a, PP 2007, animation+p/r : compr.)
PILING TECHNIQUES.
BEARINGS Suported by. Introduction Different types of bearing are used extensively throughout our machines to join stationary part to a moving part. Suported.
Part 16 Sequential and single sequence grouting with hybrid and semi-hybrid grouts VII-2009 (Part 16, PP 2007, animation+p/r : DEMO) ready 1.
(Part 30, PP 2007, animation+p/r : short version compr.)
Concrete repairs in Dammam
Drilling Rock and Earth
Micropiles and self drilling rods in soil and rock engineering
Piling.
Trough during installation of Micropiles TITAN and Foundation Plate.
Part 75-2A Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Drilling and sampling in foundation engineering
Introduction: Excavations and other engineering constructions in the ground are central to many civil and mining projects. Ground reinforcement includes.
Part 92_4 ”PUR in civil engineering – sealing of retaining walls”
Biological engineering and gabion constructions in coast protection
Part 75-4D Piles, steel-core piles and micropiles. Static test loadings. TNa micropiles.
Part 75-3D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
INTRODUCTION A method of rotary drilling in rock, usually for exploratory purposes using hollow diamond-crowned bits to obtain a core for examination.
Drilling and sampling in foundation engineering
Drilling Rig Accessoires and Tools
No Cell Phones, Please. Thank You..
CALL/WHATSAPP
Drilling and sampling in foundation engineering
European Standard prEN 14199
IWM 2000 Turku, Finland Pasi Korkeakoski
Mike Turner Applied Geotechnical Engineering
Real Estate Management Strategy and Underpinning
DSI – Ductile Iron Micropiles
Large Air Systems – Sales Training
BUILDING CONSTRUCTION Foundation
Drilling Technology.
Presentation transcript:

Part 75-1D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified 10/2016 (Part 75-1, PP 2007, animation+p/r : 2016.10.23 compr.) Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited. ready

End-bearing with pile tip on a rock surface Typical underpinning solution in Sweden – Bjurström micropile (displacement pile) ready

End-bearing with pile tip on a rock surface Modified by TNa Bjurström micropile (friction type to the left) and conventional (end bearing to the right) End-bearing and by friction along the shaft ready

Bjurström micropile as underpinning solution in Sweden ready Bjurström micropile as underpinning solution in Sweden

Steel-core piles for underpinning (replacement pile, grouted in-situ, permanent casing required) ready

Rapport 97 End-bearing or end-bearing and by friction along the shaft within rock socket (alt. in soil along drill casing) ready

Casing is left in the ground Steel-core piles press press ready

ready Rapport 97

ready Rapport 97

Rotary – percussive drilling = pulling force + rotation + percussion Rotary drilling = pulling force + rotation Pulling force = thrust or advanced in English på svenska press ready

ODEX principles (rotary /percussive drilling) reamer ring drill bit ODEX principles (rotary /percussive drilling) press ready

“Mixed drilling” (in soil and rock) for ODEX and TUBEX ready

Top hammer (to the left) and Down-The Hole-Hammer (DTH) to the right ready

ODEX for Down-The Hole-Hammer (DTH) – casing shoe press ready

ODEX G2 for Down-The Hole-Hammer (DTH) ready ODEX G2 for Down-The Hole-Hammer (DTH)

ΔS Odex Symmetrix Odex less air … backfill backfill ΔS clay (with stones and boulders) clay coarse sand, gravels and rock rubble Odex rock Difficult soil conditions for drilling (Stockholm) press press ready

press ready

ready

ready

ECCENTRIC vs. ROBIT® concentric drilling ready

Elemex, Symmetrix, ROBIT and IBEX drilling system NO-X OD = Rotary percussive drilling method with centric drill bit and percussed rotating casing with button bits + = Elemex, Symmetrix, ROBIT and IBEX drilling system NO-X = Rotary percussive drilling method with rotating centric drill bit and percussed none rotating casing with button bits ODEX and TUBEX = Rotary percussive drilling method with eccentric reamer separately rotating to drill bit and percussed but none rotating casing without button bits press press press press ready

Elemex, Symmetrix, ROBIT and IBEX drilling system NO-X ODEX and TUBEX = Rotary percussive drilling method with eccentric reamer separately rotating to drill bit and percussed none rotating casing without button bits Elemex, Symmetrix, ROBIT and IBEX drilling system NO-X = Rotary percussive drilling method with rotating centric drill bit and percussed none rotating casing with button bits ready press press press

press press ready Drilling components

Drilling components – cont. ready Drilling components – cont. press press

press press ready

press ready Starting stage for drilling: pilot bit mounted on the Down-The Hole-Hammer (DTH) during inserting into the casing Pilot bit mounted on the Down-The Hole-Hammer (DTH) after inserting into the casing – ready for drilling

press ready

Casing and casing shoe is left in the ground press press ready Withdrawal of the pilot bit mounted on the Down-The Hole-Hammer (DTH) from the casing Pilot bit mounted on the Down-The Hole-Hammer (DTH) disconnected from the casing shoe Drilling principles for piling into the rock

press press ready

ready

Casing is removed but casing shoe is left in the ground (piling in solid, stable rock) press press ready Casing drilled to the designed final depth Drilling for piling in the rock

Casing is removed but casing shoe is left in the ground (piling in none stable rock) press ready Drilling for piling in the rock – grouting and simultaneous withdrawal of casing (option) Drilling for piling in the rock – inserting of steel core The pile is completed

Ring bit and integrated casing shoe for the Down-The Hole-Hammer (DTH) Percussed none rotating casing with button bits with inserted the Down-The Hole-Hammer (DTH) ready Ring bit and integrated casing shoe for the Down-The Hole-Hammer (DTH) Percussed none rotating casing with button bits Drilling with Robit method in soil press press

Coupling of drill pipes (rods) for the Down-The Hole-Hammer (DTH) press ready Drilling in the soil with the Down-The Hole-Hammer (DTH) and air flush

Large diameter steel-core piles for Symmetrix ready Large diameter steel-core piles for Symmetrix

Robit DTH drilling for steel-core piles at Torsgränd in Stockholm press press ready

Thank You for Your attention! THE END of Part 75-1D Thank You for Your attention! ready

Welcome to www.najder.se ready