Chapter 3 Project Management. Chapter 3 Project Management.

Slides:



Advertisements
Similar presentations
1 EO EMBA-2, BUP M. ASAD Operations Management for Competitive Advantages.
Advertisements

OPSM 301 Operations Management Class 8: Project Management: Introduction and CPM Koç University Zeynep Aksin
Project Management CHAPTER SIXTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
1 Chapter 3 part 1 Project Management. 2 Why is Project Management Important?  Why do I need to know this stuff? –Relevant across functional areas 
Project Management Operations -- Prof. Juran. 2 Outline Definition of Project Management –Work Breakdown Structure –Project Control Charts –Structuring.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Project Management Operations.
Chapter 16 – Project Management
Project Management. Maintenance and Reliability 14 Aug 2001.
J0444 OPERATION MANAGEMENT Project Management Pert 5 Universitas Bina Nusantara.
Chapter 16 – Project Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
4–14–1. 4–24–2 Chapter Four Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
© The McGraw-Hill Companies, Inc., Chapter 3 Project Management.
Irwin/McGraw-Hill Project Management  Project series of related jobs usually directed toward some major output and requiring a significant period of time.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Operations Management Project Management
Chapter 3 Project Management.
Projects CHAPTER 10. Learning Objectives 1. Explain what project management is and why it is important. 2. Identify the different ways projects can be.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Project Management Project 01 – OFF CLASS. 3 Project Management Project – series of related jobs usually directed toward some major output and requiring.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Operations Management For Competitive Advantage 1 Project Management Operations Management For Competitive Advantage Chapter 3.
PROJECT MANAGEMENT Chapter Four Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Structuring Projects.
Intro : Project Management. 1.Project : series of related jobs usually directed toward some major output and requiring a significant period of time to.
1 Chapter 3 Project Management  Definition of Project Management  Work Breakdown Structure  Project Control Charts  Structuring Projects  Critical.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
Project Management (專案管理)
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Chapter 10. Activity-on-Node Network Fundamentals X Y Z Y and Z are preceded by X Y and Z can begin at the same time, if you wish (B) ABC A is preceded.
MBA 8452 Systems and Operations Management
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
© The McGraw-Hill Companies, Inc., Project Management CPM and PERT.
Tata McGraw CHAPTER 3 Project Management. Chapter 3 Project Management.
Operations Fall 2015 Bruce Duggan Providence University College.
© The McGraw-Hill Companies, Inc., Chapter 3 Project Management.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Work Breakdown Structure.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
2010© Wiley Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 4 th Edition © Wiley PowerPoint Presentation by R.B.
PERT CPM assumes duration of activity is known with certainty.
Project Management.
Project Management (專案管理)
Project Management Chapter Topics
Project Management Operations -- Prof. Juran.
Chapter 4: Project Management
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Planning & Scheduling
17 Project Management.
Critical Path Method (CPM). Background & History Developed in the 1950s by the US Navy & Du Pont. Originally, the critical path method considered only.
PROJECT MANAGEMENT WITH CPM/PERT.
17 Project Management.
Project Planning and Budgeting
Probabilistic Time Estimates
Stevenson 17 Project Management.
Chapter 3 Project Management.
Project Management Operations -- Prof. Juran.
Exercise – A small building.
Presentation transcript:

Chapter 3 Project Management

OBJECTIVES Definition of Project Management Work Breakdown Structure Project Control Charts Structuring Projects Critical Path Scheduling 2

Project Management Defined Project is a series of related jobs usually directed toward some major output and requiring a significant period of time to perform Project Management are the management activities of planning, directing, and controlling resources (people, equipment, material) to meet the technical, cost, and time constraints of a project 3

Gantt Chart Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Vertical Axis: Always Activities or Jobs Horizontal bars used to denote length of time for each activity or job. Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Activity 6 Time Horizontal Axis: Always Time 6

Structuring Projects Pure Project: Advantages A pure project is where a self-contained team works full-time on the project Structuring Projects Pure Project: Advantages The project manager has full authority over the project Team members report to one boss Shortened communication lines Team pride, motivation, and commitment are high 8

Structuring Projects Pure Project: Disadvantages Duplication of resources Organizational goals and policies are ignored Lack of technology transfer Team members have no functional area "home" 8

Functional Project A functional project is housed within a functional division President Research and Development Engineering Manufacturing Project A B C D E F G H I Example, Project “B” is in the functional area of Research and Development. 9

Structuring Projects Functional Project: Advantages A team member can work on several projects Technical expertise is maintained within the functional area The functional area is a “home” after the project is completed Critical mass of specialized knowledge 10

Structuring Projects Functional Project: Disadvantages Aspects of the project that are not directly related to the functional area get short-changed Motivation of team members is often weak Needs of the client are secondary and are responded to slowly 11

Matrix Project Organization Structure President Research and Development Engineering Manufacturing Marketing Manager Project A Project B Project C 12

Structuring Projects Matrix: Advantages Enhanced communications between functional areas Pinpointed responsibility Duplication of resources is minimized Functional “home” for team members Policies of the parent organization are followed 13

Structuring Projects Matrix: Disadvantages Too many bosses Depends on project manager’s negotiating skills Potential for sub-optimization 14

Work Breakdown Structure A work breakdown structure defines the hierarchy of project tasks, subtasks, and work packages Program Project 1 Project 2 Task 1.1 Subtask 1.1.1 Work Package 1.1.1.1 Level 1 2 3 4 Task 1.2 Subtask 1.1.2 Work Package 1.1.1.2 4

Network-Planning Models A project is made up of a sequence of activities that form a network representing a project The path taking longest time through this network of activities is called the “critical path” The critical path provides a wide range of scheduling information useful in managing a project Critical Path Method (CPM) helps to identify the critical path(s) in the project networks 15

Prerequisites for Critical Path Methodology A project must have: well-defined jobs or tasks whose completion marks the end of the project; independent jobs or tasks; and tasks that follow a given sequence. 16

Types of Critical Path Methods CPM with a Single Time Estimate Used when activity times are known with certainty Used to determine timing estimates for the project, each activity in the project, and slack time for activities CPM with Three Activity Time Estimates Used when activity times are uncertain Used to obtain the same information as the Single Time Estimate model and probability information Time-Cost Models Used when cost trade-off information is a major consideration in planning Used to determine the least cost in reducing total project time 15

Steps in the CPM with Single Time Estimate 1. Activity Identification 2. Activity Sequencing and Network Construction 3. Determine the critical path From the critical path all of the project and activity timing information can be obtained 15

CPM with Single Time Estimate Consider the following consulting project: Activity Designation Immed. Pred. Time (Weeks) Assess customer's needs A None 2 Write and submit proposal B 1 Obtain approval C Develop service vision and goals D Train employees E 5 Quality improvement pilot groups F D, E Write assessment report G Develop a critical path diagram and determine the duration of the critical path and slack times for all activities.

First draw the network D(2) E(5) F(5) A(2) B(1) C(1) G(1) Act. Imed. Pred. Time A None 2 B A 1 C B 1 D C 2 D(2) E(5) E C 5 F D,E 5 G F 1 F(5) A(2) B(1) C(1) G(1) 18

Determine early starts and early finish times EF=6 D(2) ES=0 EF=2 ES=2 EF=3 ES=3 EF=4 ES=9 EF=14 ES=14 EF=15 A(2) B(1) C(1) F(5) G(1) ES=4 EF=9 Hint: Start with ES=0 and go forward in the network from A to G. E(5) 21

Determine late starts and late finish times Hint: Start with LF=15 or the total time of the project and go backward in the network from G to A. ES=4 EF=6 D(2) E(5) ES=0 EF=2 ES=2 EF=3 ES=3 EF=4 ES=9 EF=14 ES=14 EF=15 LS=7 LF=9 F(5) A(2) B(1) C(1) G(1) ES=4 EF=9 LS=3 LF=4 LS=2 LF=3 LS=0 LF=2 LS=9 LF=14 LS=14 LF=15 LS=4 LF=9 22

Critical Path & Slack ES=4 EF=6 D(2) ES=0 EF=2 ES=2 EF=3 ES=3 EF=4 Slack=(7-4)=(9-6)= 3 Wks D(2) ES=0 EF=2 ES=2 EF=3 ES=3 EF=4 ES=9 EF=14 ES=14 EF=15 LS=7 LF=9 F(5) A(2) B(1) C(1) G(1) ES=4 EF=9 LS=3 LF=4 LS=2 LF=3 LS=0 LF=2 LS=9 LF=14 LS=14 LF=15 E(5) LS=4 LF=9 Duration=15 weeks 23

Example 2. CPM with Three Activity Time Estimates

Example 2. Expected Time Calculations ET(A)= 3+4(6)+15 6 ET(A)=42/6=7

Ex. 2. Expected Time Calculations ET(B)= 2+4(4)+14 6 ET(B)=32/6=5.333

Ex 2. Expected Time Calculations ET(C)= 6+4(12)+30 6 ET(C)=84/6=14

Example 2. Network A(7) B C(14) D(5) E(11) F(7) H(4) G(11) I(18) (5.333) C(14) D(5) E(11) F(7) H(4) G(11) I(18) Duration = 54 Days

Example 2. Probability Exercise What is the probability of finishing this project in less than 53 days? D=53 p(t < D) t TE = 54

(Sum the variance along the critical path.)

p(t < D) t D=53 TE = 54 p(Z < -.156) = .438, or 43.8 % (NORMSDIST(-.156) There is a 43.8% probability that this project will be completed in less than 53 weeks.

Ex 2. Additional Probability Exercise What is the probability that the project duration will exceed 56 weeks? 30

Example 2. Additional Exercise Solution TE = 54 p(t < D) D=56 p(Z > .312) = .378, or 37.8 % (1-NORMSDIST(.312)) 31

Time-Cost Models Basic Assumption: Relationship between activity completion time and project cost Time Cost Models: Determine the optimum point in time-cost tradeoffs Activity direct costs Project indirect costs Activity completion times 32

CPM Assumptions/Limitations Project activities can be identified as entities (There is a clear beginning and ending point for each activity.) Project activity sequence relationships can be specified and networked Project control should focus on the critical path The activity times follow the beta distribution, with the variance of the project assumed to equal the sum of the variances along the critical path 15

End of Chapter 3