Overview What is commissioning (short version)

Slides:



Advertisements
Similar presentations
Energy Audit Process For Data Centers Len Kientz
Advertisements

A CASE STUDY in actual energy conservation
TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
Sustainability and Energy ServicesSustainability and Energy Services.
1Taylor Engineering, LLC Group Think Mark Hydeman, P.E., FASHRAE Taylor Engineering, LLC
Commissioning: The Most Important Component of LEED ® by Rick Miller, PE, LEED AP RNM Engineering, Inc. San Luis Obispo, CA.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
January 12, 2012 Commissioning Services. June 13, 2011  Genesis Commissioning Capabilities  What is Commissioning (Cx)/Retro-Commissioning (RCx)? 
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
Franklin County Technical School Performance Contract Project.
Building Commissioning
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Deep retrofits: You get what you pay for Leslie Kramer, Stanford University and Jonathan Schoenfeld, kW Engineering June 17, 2014.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
The AHU From A Case Study Presented by David Sellers Portland Energy Conservation Inc. INLAND EMPIRE CHAPTER 1 - 2/27/2002.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Building Commissioning/Energy Performance Contracting.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Phoenix Convention Center Phoenix, Arizona Facility Energy Audits Mike Gutowski Johnson Controls August 12, 2015 Agency Energy ManagerEnergy Audits: Implementing.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Cleveland Clinic Abu Dhabi Sustainability Case Study Presented by Ted Jacob.
The lawrence berkeley national laboratory: a case study Revised 12/2/04.
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
The Data Center Challenge
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Data Center Energy Use, Metrics and Rating Systems Steve Greenberg Energy Management Engineer Environmental Energy Technologies Division Lawrence Berkeley.
Objectives Talk about the final projects Guest Speaker Discuss HW2 and HW3 problems.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
the Basic Commissioning (Cx) Process
Prepared For: Prepared By: 100 Montgomery Street, Suite 600 San Francisco, CA Market Street San Francisco, CA The Benefits of Retrocommissioning.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Introduction to LEED Building Commissioning
Sustainable Efforts in Housing
Fifty Questions What Business and IT Officers Need to Know about their Campus’ Carbon Emissions Did your CEO sign the American College and University.
The Data Center Challenge
EnMS Management Review
UMCP Learning Objectives
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Industrial Assessment Center Database
GVSU Case Study Analysis of HVAC filter using MERV 13 filter with low pressure drop design. 1.
Biobehavioral Health Building, University Park, PA
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
2018 Retro-Commissioning (RCx) Program
Dynamic Chiller Optimization The Next Level of Retro-Commissioning
Alabama Industrial Assessment Center
Presentation transcript:

Overview What is commissioning (short version) How to purchase commissioning (Cx) services Differences in commissioning strategies Decisions owner needs to make Expectations of the commissioning process Case studies – University of Michigan Cardiovascular Center Ross School of Business

What is Commissioning “Commissioning is the process of ensuring that building systems are designed, installed, functionally tested and capable of being operated and maintained according to the owner’s operational needs.” Documentation that equipment/systems are installed and perform in accordance with the owner’s project requirements. Verify O&M documentation and as-built drawings’ accuracy and completion. Coordinate the training of O&M personnel.

Benefits of Cx Energy Savings According to Evan Mills, Ph D. from Lawrence Berkeley National Lab., who conducted a study for the USDOE, of 643 building across 26 states: Median commissioning costs: $0.30 and $1.16 per square foot for existing buildings and new construction, respectively (and 0.4% of total construction costs for new buildings) Median whole-building energy savings: 16% and 13% Median payback times: 1.1 and 4.2 years “Cx is arguably the single-most cost-effective strategy for reducing energy, costs, and greenhouse-gas emissions in buildings today.” http://cx.lbl.gov/2009-assessment.html

Purchasing Cx Services Key points about Cx It’s a professional service It’s a systematic quality control process It’s a paper trail Differences in Cx Process Sampling Who fills out checklists Contractor Cx Provider

Purchasing Cx Services Owners Goals What’s important to me - Prioritize Energy efficiency Reliability Reduced customer complaints Ease of maintenance Cost

Purchasing Cx Services New Construction Design Phase Design Development Phase Most bang for the buck Required to bring in for LEED Enhanced Cx Construction Phase How much time on site Cost is dependant on this Sampling Meetings, etc

Purchasing Cx Services Existing Building Commissioning Cx a building that is already operating Verify that the system still works for any changes made since design (ex: conference room to office) Review HVAC issues (hot/cold spots, complaints) Look into reducing energy costs

Purchasing Cx Services Existing Building Commissioning Steps taken Review design documents Review current facility operations Test HVAC equipment for proper function Recommend changes in sequence of operations to meet current facility use Recommend repairs to system to save energy, fix temp complaints Recommend further energy saving measures (new equipment, etc)

Expectations of the Cx Process Reduced Energy Cost Finding all of the small items that add up to big savings BMS that works Validating BMS systems by observing in the field Reduced complaints Systems have been tested for proper operations

Expectations of the Cx Process Reliability All sequences of operations tested for interoperability Relative Ease of Maintenance Reviewed during construction to maximize space There will still be issues, Cx won’t find everything, but there will be a lot less issues!

Case Studies UM Cardiovascular Center UM Ross School of Business 500,000 ft2 heart hospital Clinical, support, and office space Reliability and customer satisfaction key priorities UM Ross School of Business 270,000 ft2 academic and faculty building Classrooms, auditorium, colloquium, student services area, and gathering space Energy and customer satisfaction key priorities

Cardiovascular Center

Cardiovascular Center 12 OR’s 10 Cath/EP Labs Recovery Room 24 Bed ICU 24 Bed Med/Surg Unit 16 Main Air Handling Units

Cardiovascular Center 3 HVAC Chillers 1 Process Chiller 4 Cooling Towers Free Cooling Thermal Basin Steam from Central Power Plant Two 2 MW Diesel Generators

Cardiovascular Center Cx Differences for CVC Cx Authority was also mechanical engineer site representative Much more authority than typical Fully integrated MEP inspections & testing Cx Authority involved from schematic design Greater understanding of design intent Univ. of Michigan Commitment Totally supported Cx process

Cardiovascular Center Cx Challenges Free cooling sequence Controls schedule Systems are last to come online Time to functional test before turnover Room pressurization Pull the Plug Test Fuel Oil System Domestic hot water State Bureau of Fire Safety State Health Facility Engineering Section

Ross School of Business

Ross School of Business LEED Silver Certified Large classrooms with individual fan coil units Administrative area for the business college Full kitchen for the students and staff Work out facility and locker rooms for all students and staff Over 400 Variable air Volume Units

Ross School of Business 7 Air Handler Units (AHU’s) Hot Water / Campus Steam Hx Stair Pressurization Units Pull the Plug Test Smoke Control System 12 Classroom Fan Coil Units

Ross School of Business Cx Role Assisted Univ. of Michigan and the construction team on the LEED process Cx process drove the final stages of the project Scheduled training with Univ. of Michigan and the contractors Univ. of Michigan Commitment Supported Cx process 100%

Ross School of Business Cx Challenges Classroom fan coil unit access, controls sequence, and performance Lighting controls system – tuned the system to meet the owners needs Smoke control system – perform the special inspector test VAV naming to meet the owner’s end result from the beginning of construction to turn over

Resources Building Commissioning Association (BCA) www.bcxa.org Portland Energy Conservation, Inc. (PECI) www.peci.org Horizon Engineering Associates, LLP www.horizon-engineering.com Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse Gas Emissions http://cx.lbl.gov/2009-assessment.html

Contacts Matthew Tunnard, PE, CCP, LEED mtunnard@horizon-engineering.com 248-348-8800 Michael Keith, LEED mkeith@horizon-engineering.com www.horizon-engineering.com