Sector Collector Electronics

Slides:



Advertisements
Similar presentations
C. Fernández Bedoya, A. Navarro, I. Redondo. C. Fernández Bedoya November 29th, Goal: Replace SC crate with simple CuOF electronics and place TSC.
Advertisements

February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
14/6/2000 End Cap Muon Trigger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
C. F. Bedoya. C. F. Bedoya May 13th, * The goal was to establish a baseline plan for DT in Phase 2, (although some aspects of phase 1 also needed.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
Status of NA62 straw electronics Webs Covers Services Readout.
C. Fernández Bedoya on behalf of DT Upgrade group.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
Fernández-Bedoya C., Marín J., Oller J.C., Willmott C. 9 th Workshop on Electronics for LHC Experiments. Amsterdam.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
DT UPGRADE STRATEGY M.Dallavalle for the DT Collaboration 6/26/12 Muon IB1.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
C. Fernández Bedoya on behalf of DT Upgrade group.
New ROS design + gradual installation New TSC design + gradual installation Bottleneck at increased luminosities Improves maintainability and performance…
Cristina Fernández Bedoya on behalf of the DT group.
CMS Drift Tubes Gruppi di Bologna, Padova, Torino G.M. Dallavalle
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
F. Odorici - INFN Bologna
Nuclear Science Symposium (NSS)
CMS DT Chambers Read-Out Electronics
CLAS12 DAQ & Trigger Status
ESR for the muon DT Minicrate System
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
Sector Collector Electronics
Integration and Services RE3/1 and RE4/1
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
OFCU-RO status and plans
9th Workshop on Electronics for LHC Experiments.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
The Ohio State University
Electronics System Review
T1 Electronic status Conclusions Electronics Cards:
CMS November Upgrade Week
DT Consolidation Summary
ESR for the muon DT Minicrate System
DT Infrastructure: LV, HV, Gas
Electronics System Review
Pierluigi Paolucci - I.N.F.N. Naples
The digital read-out for the CSC system of the TOTEM experiment at LHC
RPC Detector Control System
The digital read-out for the CSC system of the TOTEM experiment at LHC
RPC Detector Control System: towards the final system
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
on behalf of Barrel RPC Collaboration
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
RPC Electronics Overall system diagram Current status At detector
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
SVT detector electronics
The LHCb Front-end Electronics System Status and Future Development
FED Design and EMU-to-DAQ Test
Plans for the 2004 CSC Beam Test
Presentation transcript:

Sector Collector Electronics Consolidation of DT Sector Collector Electronics C. Fernández Bedoya on behalf of DT Upgrade group

DT SC Consolidation: Motivation Proposed upgrade is not motivated by the physics performance but by the fact that aging and other risks may jeopardize detector operation and contribute to an accelerated degradation Magnetic fields (40 mT) => tangential turbines SC crate power consumption (aprox 1 kW) is already marginal for CMS cooling system in the cavern. Temperature of some boards reach 45ºC. Turbines aging will lead to accelerated aging of the system and increased failure rate. Radiation doses 0.2 Gy per year (charged particle fluxes 20 cm-2 s-1) SC boards include large amount of logic, sensitive to SEU. Higher L => higher SEU rate. Important constrain for future upgrades. Limited access tighten to LHC technical stops and radiation protection issues In case of failure, it can take easily one week until access to the cavern is granted. Impact of failures in the detector can be VERY LARGE: Part failing Affected region %DT affected LINCO Half a wheel in trigger and read-out 10% TIM ROS 1 Sector in the readout 1.7% TSC 1 Sector in the trigger C. Fernández Bedoya October 26th, 2010 2

DT SC Consolidation: Motivation We think this modification is a necessary change to allow future modifications that are forced to happen in a tight LHC schedule and happen simultaneously with a system that is already working -Compatibility between present and future systems is very advisable (if not mandatory) -LHC shutdowns tight considerably any change in UXC (i.e. installing fibers, replacing modules in UXC, etc) Development of a new system in UXC has to be planned to match this shutdowns. -In order to commission an new system we are not going to have as much time as we have now, plus we may have less manpower -A 1 to 1 channel conversion allow us to have in USC exactly what we have in UXC without adding extra L1A latency (serialization, etc), so it gives a lot of flexibility for future improvements -For phase 2 the plan is not decided yet, but we should aim to minimize artificial frontiers if not needed (i.e. multiplexing in same link different type of information), having in USC what you have in the detector opens yourself to basically all the approaches you can think of. -Very likely, time will determine what is more convenient and we can only foresee how to make the system more reliable until the best option to change appears without adding more limitations C. Fernández Bedoya November 17th, 2010 3

DT Sector Collector - 2 SC crates per wheel - Located in tower racks in UXC level 2 Near - 60 ROS and 60 TSC boards in the system (1 per sector) - Complex electronic system - Main elements: LINCO, TIM, ROS, TSC LINCO C. Fernández Bedoya October 26th, 2010 4

Proposed Upgrade -Relocation of DT SC electronics in the USC counting room -Make a “simple” copper to OF conversion at SC level -Modify input mezzanines of ROS and TSC Low impact modifications: compatible with present system and with possible future upgrades Present system Proposed upgrade C. Fernández Bedoya October 26th, 2010 5

Cu to OF conversion Present proposal is to make a 1 to 1 channel Cu-OF (Present links are copper based which length cannot be increased without compromising its reliability) Optical fiber 25 @ 240Mbps 25 @ 240 Mbps 32 @ 480 Mbps 32 @ 480Mbps Copper In the tower racks (substituting present SC) Plus few components for bias setting (DAC) and monitoring. OF could be extracted from the back of the SC crate VME interface at tower rack may not be needed Power can be extracted from present power supplies C. Fernández Bedoya October 26th, 2010 6

My proposal for a CUOF board (for a TSC-32 links): 9U format VME Individual fibers (integrated patch pannel on board) SLOW CONTROL: -VME J1 connector? -Standalone system? -Integrated with Minicrates secondary connection? Copper cables from Minicrates MTP connectors (12 fibers each) Mezzanines Fibers extracted from the back of the rack ecualizer Laser driver VCSEL (LC connected?)

ARRANGEMENT OF FIBERS IN CABLES One possibility that looks promising: MTP of 12 channels each. Cables of 12 MTP ribbons (144 OF/cable). PER SECTOR ROS 3 MTP/sector = 36 links 11 spares (44%) TSC-32 4 spares (16%) TSC-40 4 MTP/sector = 48 links 8 spares (32%) PER SECTOR COLLECTOR CRATE Assuming cables of 12 ribbons (and separating completely RO and TRG): ROS 3 MTP * 6 ROS = 18 MTP ribbons 2 of 144-cables = 24 MTP 6 spares (33%) TSC 3 MTP * 5 TRG-32 + 4 MTP * 1 TRG-40 = 19 MTP ribbons 5 spares (26%) TOTAL ROS+TRG => 4 cables-144 / SC crate PER WHEEL TOTAL ROS => 4 cables-144 / WHEEL TOTAL TRG => 4 cables-144 / WHEEL TOTAL ROS+TRG => 8 cables-144 / WHEEL TOTAL TOTAL ROS => 20 cables-144 TOTAL TRG => 20 cables-144 TOTAL ROS+TRG => 40 cables-144

Installation of fibers Number of links between Minicrates and SC electronics Per Sector Per Wheel Total ROB to ROS 25 300 1500 SB to TSC 32/40* 400 2000 57/65 700 3500 *(S4 and S10 have 5 DT chambers each instead of 4) Large number of fibers 4 of these cables per SC crate (40 cables in total, large number of spare fibers) Total cross section needed around 100 cm2 144 fibers cable C. Fernández Bedoya October 26th, 2010 9

RACK WIZARD TOOL (read only): http://glege.home.cern.ch/glege/RackWizard/RackWizard.html Sector Collector (SC) crates in UXC Level 2 near

5 racks 10 SC crates (2/wheel)

Routing of the fibers should be done through present “trigger” tunnels

-CERN EN/EL/EF section can provide and manage optical fiber installation. -We are in contact with them. -http://en-dep.web.cern.ch/en-dep/groups/el/Sections/cf.htm

OF input stage In principle, there is enough space below the false floor in S1 USC to recover extra cable lengths (though it depends on the exact racks to be used). Main problem is to allocate the SC crates in S1: -10 SC crates 11U each -To minimize L1A latency, they should be close to DTTF racks (S1D01 and S2D02) -In DT racks at present there is only space to allocate 6 SC crates (and not very close to DTTF) (Relocation can be done in batches of half a wheel) C. Fernández Bedoya October 26th, 2010 16

DTTF 3 SC DTTF 1 SC 3 SC (if DT DSS moves) 3 SC 15 U

DT SC consolidation: Plan PRESENT PLAN 1. Fibers installation (2012 – if shutdown moves, then in 2013): -Requires long access time -Needs to be done simultaneously for all the fibers 2. Scaled installation at any time (winter shutdowns). Minimal unit is half a wheel. -Modification of TSC and ROS input mezzanines -Relocation of SC electronics in USC Estimated cost 800 k€ (+600k€ if ROS and TSC are totally redesigned) C. Fernández Bedoya October 26th, 2010 18

Back up

DTTF BPTX 33 U 16 U 10 U* DTTF bottom 10 U 13 U 13 U empty 13*+13 U empty 15 U 0 U 16 U 10 U* 16 U 10 U* 14 U* 33 U 0 U 15 U Since 26 U Since 26 U 0 U In row D we could put more racks to the left, in the corridor, there is space 0 U

SC to USC -Move SC crates to USC (VME access in UXC may not be needed, compatible with future RS485 board) -Modify input ROS and TSC mezzanines for OF reception Fully compatible with present system Drawbacks: -trigger latency may be slightly increased -Find space in USC for 10 SC crates -Route large number of fibers (with present 48 fibers => 73 cables)

DT Chambers YB+2 YB+1 YB0 YB-1 YB-2 250 chambers 5 wheels 24 May 29th, 2009 C. F. Bedoya DT Chambers Sector 4 YB+2 YB+1 YB0 YB-1 YB-2 Sector 5 Sector 3 Sector 6 Sector 2 Sector 7 Sector 1 MB2 MB1 MB3 MB4 Sector 8 Sector 12 Sector 9 Sector 11 Sector 10 250 chambers 5 wheels 12 sectors/wheel 4 layers/sector: MB1, MB2, MB3, MB4 172,200 drift cells Covers 0<η<1.2. Provide muon identification Precise momentum measurement. Good pT resolution at high transverse momenta: σ(pT)/pT~ 10% @ 1TeV/c Reliable and robust trigger: pT standalone measurement @ Level-1 and High Level Trigger and precise Bunch Crossing (BX) assignment.

DT Chamber DT Cell  DT Chambers 25 May 29th, 2009 C. F. Bedoya Tmax < 400 ns Efficiency ~ 99% Drift velocity ~ 55 μm/ns  DT Cell Anode wire 3 Superlayers per chamber, 2 for Ф coordinate and 1 for  coordinate. Almost linear space-time relationship. Single wire resolution ~ 250 µm Local reconstruction (rФ) ~ 100 µm Gas: Ar/CO2 (85/15)% High Voltage: wires 3.6 kV strips 1.8 kV cathods -1.2 kV

26 May 29th, 2009 C. F. Bedoya Minicrate Attached to the DT Chambers it contains the first level read-out, trigger and full chamber control electronics. CCB: Full chamber control and monitoring: configures, sets thresholds, reads temperatures, etc. CCBlink: Connects the CCB to the external DT DCS system. TRB: Searches track segments and performs bunch identification. SB: Performs track selection and transmits to TSC. ROB: Time digitalization of signals coming from the chambers. ROLINK: Collects outputs from ROBs and sends it to the ROS. New Minicrate firmware means new CCB firmware.

MC secondary link upgrade for 2012 shutdown From Franco G. Replacement of 485 boards (10) housed in SC crates Improvements in secondary link system done 2 years ago have solved the many RS485 IC ruptures on MC linkboard But: Improvements were realized with many ‘handmade’ patches added to boards The UXC-USC link for half wheel is slow, 38.4Kbps Often 485 boards lost communication with DCS (last week 2 of 10, sometimes more) Recovering requires cycling on/off the SC crate Enhancement of MC communications reliability Integration of all patches on PCB new 485 board Maximization of USC-UXC link speed Boards remain compatible with present hardware Required the modification of part of DCS server software Cost: about 15Keuro. Man power by INFN PD

present system after 2008 improvements MC SECONDARY LINK present system after 2008 improvements From Franco G. Primary serial link -> optical fiber MC communication Secondary serial link -> RS485 copper chain Half wheel RS485 board 38.4Kbps Sector 1/7 driver485 Sector 2/8 driver485 38.4Kbps UXC Upper/bottom SC 9U crate Sector 3/9 controller Sector 4/10 driver485 38.4Kbps Sector 5/11 driver485 38.4Kbps Sector 6/12 UXC-USC optical link 38.4Kbps 485 chain termination & overvoltage protection

From Franco G. Proposed new 485 BOARD 485 chain termination & overvoltage protection RS485 38.4Kbps RS422 link to ADLINK PMC8681 (PMC board already mounted on VME SC crate controller) 230.4Kbits full duplex S1/S7 S2/S8 485 link controllers 1/sector S3/S9 USC Interface controllers S4/S10 S5/S11 S6/S12 Backup optical link 38.4Kbps for present system compatibility (upgradable to 230.4 full duplex) Power from LV caen module

Consequences of LHC plan for DT: Reassess the robustness of our stock of spares, in particular for on detector electronics (with only 2 openings of CMS, the number of hot spares needs to be larger than planned): Meticulous failure rate measurements during 2010 On detector electronics: Not sensible redoing the Minicrates before 2020, however we are for sure short of BTIM. Present approach is remaking the theta trigger boards and use old boards to retrieve spare BTIMs UXC racks electronics: CAEN Low Voltage connectors: weak point in particular for A3100. Plan is to move to A3100B (bolts) this year. For A3050 the plan is to test lubricant in 10% of the detector this year and see how it behaves. Sector Collector electronics: Currently we need to wait until LHC stops to get UXC access in order to fix a SC problem. A SC problem may handicap a large fraction of the detector (min a sector in trigger or readout). Present approach under study is to make a “simple” copper to OF conversion at SC level and move SC electronics to USC Expectations: 3 ROBus/year , 5 TRB/year, 1 CCB Link/year Failure rate= 46 in 2009, 4 in 2010 Failure rate low at present (~1/year)

Equalizer Laser driver 25/ROS 32/TSC … Equalizer

DT Electronics Sector Collector Second level of DT read-out and trigger C. Fernández Bedoya October 26th, 2010 32 DTTF

DDU ROS ROB DT CHAMBERS DT Read-Out System UXC55 USC55 DDU (FED) 40 m copper 240 Mbps ~16 Mbps throughput 60 m optical 800 Mbps ~80 Mbps throughput S-LINK64 320 MB/s ~ 200 MB/s throughput DDU (FED) 10 DDU => half a wheel 12 ch/DDU (only half needed) Data merging Data quality monitoring TTS interface ~ 0.7 kB muon event size/DDU Chambers 5 wheels 60 sectors 250 chambers 660 super-layers 1640 layers ~172200 channels Minicrates 1500 ROB 128 ch/ROB Time digitalization (0.7 ns resolution) 1 µs time window Sector Collector 60 ROS 25 ch/ROS => 1 sector Data merging Data quality monitoring ~ 260 bytes muon event size/ROS C. Fernández Bedoya October 26th, 2010 33

DT Trigger System TSC 40 m copper 480 Mbps 60 m fiber 1.6 Gbps OptoRX C. Fernández Bedoya October 26th, 2010 34