GC Startup
H2 Generator Startup Front Back 2 4 Power up generator Press the “Start” button on the front panel Once 90 PSI is reached for Actual Press the “Open” button
Compressed Air Input valve Turned on compressed air supply and adjust to 120 to 150 psi (not shown) Turn on air dryer (plug in or turn on switch / not shown) Open input valve Allow system to equilibrate for 10 minutes
Compressed Air Output valve Regulator Post-Dryer valve Open Post-Dryer valve Adjust regulator to 90 PSI Open output valve
Power on GC Turn on Power Switch
Power on GC Click on “Log In” Click on “FID”
Power on GC Click on “Ignite” You should hear a small pop from the top of the GC. The Set and Actual should be the same when the FID is running.