Visibility Ramu Ramanathan 10/1/2007.

Slides:



Advertisements
Similar presentations
ColumbiaGrid Reliability Workshop October 1, 2007 Developmental and Staffing Reliability Functional Agreement (DSRFA) Details This program is the cornerstone.
Advertisements

WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
January TSS J. Gronquist, S. Kincic
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Network Model Management System (NMMS)
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
ColumbiaGrid Reliability Activities ColumbiaGrid Board Meeting Presentation August 15, 2007.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
2017 WECC JSIS Report March 21, 2017.
System Modeling Discussion
Freeport Area Master Plan Project -
Western Electricity Coordinating Council
Transmission Planning Base Case Loads & Transmission System Model
Stacen Tyskiewicz CIIMS Chair July 12, 2016
“FRCC RESTORATION PLAN (BLACKOUT & BLACK START)” - TRAINING -
I. CVETKOVIC, D. BOROYEVICH, R. BURGOS, C. LI, P. MATTAVELLI
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
1. How much time are you spending building your network model?
Proposal to Remove from Service the PV-COI RAS
Next Steps in Load Modeling
Updates to the Path Rating Process for Approval by the PCC
Nick Hatton Associate Engineer March 9, 2017
ISO New England System R&D Needs
I-5 Corridor Reinforcement Project
Update from PEAK on RAS Visualization Efforts
Planning Tools Overview
Proposed Energy Imbalance Market The Basics
DEC System Voltage Planning - June 2018
Pacific Power Seismic Preparedness Update
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
Reliability & Market Impacts Resulting from RC Expansion
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
WECC RC Forum October 12, 2018.
Jason Ausmus, Jason Smith and Akshay Shivaram Peak Operations Planning
Enhanced Curtailment Calculator (ECC)
Jonathan young ColumbiaGrid
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
PacifiCorp-CAISO-NVE EIM Initiative Overview
1. How much time are you spending building your network model?
Review of Distribution Network Protection
2017 WECC JSIS Report March 21, 2017.
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Planning Tools Overview
SRWG Chair Report March 2015 WECC HQ
Hongming Zhang EMS Applications Manager, PEAK RC
WECC RC Forum October 12, 2018.
Palo Verde-COI RAS Retirement
Proposal to Remove from Service the PV-COI RAS
Reliability & Market Impacts Resulting from RC Expansion
Palo Verde-COI RAS Retirement
Peak Reliability IRO Webinar
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
NERC Congestion Management
Presentation transcript:

Visibility Ramu Ramanathan 10/1/2007

Agenda Visibility Overview Status Issues WECC ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next Steps 2

Visibility Overview

Model Area Model Area 4 Actual WECC System Future Model WECC Planning Model SE Model Network equivalence WECC substations Not in WECC planning model Future Model Model Area 4

WSM Project 5

Stage 1 – Operational Network Model RMRC (WAPA) PNSC (BPA) CMRC (PG&E) WECC Merged Operational Model Network Validation Power Flow Online Display 6

Stage 2 – SCADA & SE WECC WON 7 WECC Operational Network Model State Estimator System WECC SCADA Model SCADA System WECC ICCP Model ICCP System WECC WON 7

Stage 3 – WECC Customization State Estimator Customs Remedial Action Schemes PowerTech Applications TSAT – Transient Stability VSAT – Voltage Stability 8

System Model Objective WSM is the heart for system reliability. It will be used for estimating the system states and evaluating the system reliability. WSM is also going to be used for operation and system planning studies. Model needs to be accurate as much as possible. Most of the variance currently present need to be cleaned up. Proper tools, methodology, process and resources need to be identified to maintain the quality and accuracy of the model. Results will be as good as the model 9

WSM Possible Users WSM Provides Common Network Model for Reliability Entities (RE) Planning Entities (PEs) Reliability Coordinators (RCs) Balancing Authorities (BAs) Planning Authorities Transmission Operators Resource Planners Standards Developers 10

Status – WECC Schedule Phase 1 – 1st Qtr 2008 (est 4th Qtr 2008) Stage 3 Stage 2 Stage 1 Stage 1 Q4 2006 Q1 2007 Q2 Q3 2008 Phase 1 – 1st Qtr 2008 (est 4th Qtr 2008) Phase 2 – est. 2009 (????) Phase 3 – est. 2010 (????) 11

Status – ColumbiaGrid Activities Signed - Development and Staffing Reliability Functional Agreement Appointed Norm, Darrell, Ramu to support these activities 12

Overview of Agreement - Visibility Enhancements CG will assist in Western Interconnection-wide and region-wide efforts to enhance the visibility for Reliability Coordinators Transmission Operators/Owners Assist WECC’s in the development, testing, implementation and maintenance of West-wide Model Similar tools Recommend to Reliability Parties regarding workable Visibility tools for their respective Transmission Systems and the Regional Interconnected System. Deliverables Establish presence in certain reliability forums Gain experience and knowledge Develop recommendations regarding future actions of parties, including potential roles for ColumbiaGrid Publish interim recommendation (Date ??/??/??) 13

Visibility Enhancements Issues……. We need to identify approaches for following issues Currently there is a clear plan how WSM is going to be used by WECC but not by members. 3 different bus names (Need cross reference) West Wide Model Operation Planning Utilities need to come up with a method to synchronize their model with West Wide Model on the ongoing basis (Planning and operation) Need to merge the model below 100 KV and validate Additional tools are required to develop a planning model from the network model. Model differences in operation and planning (Multi section lines, transformers, DC lines……….) Currently data maintenance process between planning and operation has lot of gaps. Few members are performing operation studies. Others need to perform operation studies based on current operating conditions to optimize the system and meet system reliability. (Next hour, next day and week) Bus and node orient model issues Need to identify the software licenses provided by AREVA for CG members 14

Visibility Enhancements Issues……. (Cont.,) Equipment Model Issues & variables Modeling methods are not consistence Generators (Hydro, Thermal, Water level, temperature…..) MW limits MVAR limits Transformers (Tap, impedance, model…) Line data Line connected shunts Multi section lines Shunts (Value, Base KV, no of shunts, location) DC Line modeling Load Sub transmission modeling & Equivalent model Data quality need to be validated 15

Preliminary Thoughts regarding Conclusions and Recommendations

Visibility Enhancements West-wide Model Initial Development BPA CAISO Validate Merged WSM 100 KV and above Initial WSM WAPA 17

Visibility Enhancements West-wide Model Maintenance Online Model New Model WECC Validate Every 2 weeks Update To Current Model 18

Visibility Enhancements West-wide Model - Planning Dump Process CIM/GE/PTI WSM Add Lower KV model Validate Add Future Equipments Validate Planning Model 19

Next Steps Identify how GC members can use the WSM model – Identify gaps Identify the process to cleanup, test and maintain the WSM Establish presence in certain reliability forums GC Gain experience and knowledge Develop recommendations regarding future actions of parties, including potential roles for ColumbiaGrid Publish interim recommendation 20