Customer fund program update

Slides:



Advertisements
Similar presentations
Grant County PUD Plant Upgrades at Wanapum and Priest Rapids Dams
Advertisements

Defense Reform Update for Secretary of Defense William Cohen by Stan Soloway November 8, 1999 Defense Reform Update for Secretary of Defense William Cohen.
1 ELECTRICAL EQUIPMENT AND SYSTEMS – OFFSHORE AND ONSHORE FACILITIES MAIN ELECTRICAL EQUIPMENTS AND SYSTEMS INSTALLED  GENERATORS: MAIN GENERATORS – 12.
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
SAME “Meet the Chiefs” Don Erickson, P.E., PMP
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Portland & Walla Walla Districts Columbia-Snake River System Extended Navigation Lock Outage.
Little Falls Powerhouse Modernization Presented by Brian Vandenburg Avista Utilities, Spokane, WA.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Seneca Overview & Generator Rewind
Field Support Enhanced Army Global Logistics Enterprise
US Army Corps of Engineers BUILDING STRONG ® Gary Hinkle, PE June 10, 2014 Mid-West Electric Consumers Association Board of Directors Meeting Sylvan Lake,
Yards Creek Rotor Poles
The art of Engineering
SAME “Meet the Chiefs” LTC Shawn Patrick Deputy Commander
BUILDING STRONG ® SAME San Antonio Post Small Business Conference John Roberts Deputy District Engineer for Project Management Tulsa District July 26,
Power Plant Construction and QA/QC Section 7.4 – Hydroelectric Generators, Transformers and Controls Engineering Technology Division.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
© Offshore Wind A big opportunity? GA-EMA Conferences 22 October 2014.
Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering Broadband Access Points & Programmable Logic Controllers Replacement – Phase 1 Project.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Western States Power Corp.
ACADs (08-006) Covered Keywords Turbine Auxiliaries, Mechanical Systems, Gates, Cranes and Hoists. Description Supporting Material
Seattle District MILITARY CONSTRUCTION PROGRAM
The Lower Mon Project William A. Karaffa, P.E. Project Manager Briefing to Waterways Association of Pittsburgh April 14, 2004.
Wood Group – an overview A global market leader in: - services for the oil & gas and power generation markets - deepwater engineering - enhancement.
US Army Corps of Engineers BUILDING STRONG ® Greg Mellema Hydropower Master Plan (HMP) Operations Division Omaha District 08 Dec 2015.
US Army Corps of Engineers BUILDING STRONG ® Power Plant Uprate Brief Missouri River Mainstem Mid-West Board Meeting Gary Hinkle Omaha District June 2015.
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
ACEC National Energy and Environment Challenges in Asset Management? Brian Long Transmission Line Performance Xcel Energy August 15, 2015.
ACEC Annual Convention April 29, 2014 Washington D.C. Lowell Pimley Acting Commissioner RECLAMATION Managing Water in the West U.S. Department of the Interior.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Meeting Nantucket’s demand for electricity, today and tomorrow. Upgrading Nantucket’s Electric Grid.
National Organization of Minority Engineers Metropolitan Water Reclamation District of Greater Chicago June 30, 2016.
YEL WIND POWER PROJECT. YEL WIND POWER PROJECT.
Luthin Associates Overview
Western States Power Corp.
Western States Power Corporation
Diablo Canyon Power Plant: State of the Plant Update
Maintenance Scheduling
LCLS Klystron Modulator AIP Sec 28 AIP Review Feb 2010
RECLAMATION Power O&M Program Great Plains Region
Engineering Technology Division
RECLAMATION Power O&M Program Great Plains Region
Fiscal Year 2017 Final Budget Workshop
Presented by: Sandra Easter
Brownsville Overview Management Presentation December 2000
Mid-West Electric Consumers Association
Compliance Report to ERCOT TAC February 2007
Copyright Scott Bloss, All rights reserved.
Fans & Heaters technical seminar
Tribology at Vattenfall R&D
Interconnection Practice, Policies, Procedures ComEd Illinois
MAINTENANCE PLANNING AND SCHEDULING
Federal Acquisition Service
Siskiyou Power Authority
DEC System Voltage Planning - June 2018
Pacific Power Seismic Preparedness Update
Manpower Management What document spells out Military Strategy for OS and FS? Who does the US Army Manpower Analysis Agency work for? What guidance determines.
SUSTAINABLE ENERGY INDUSTRY DEVELOPMENT PROJECT (SEIDP)
Illinois Waterway 2020 Consolidated Closure
U. S. Army Corps of Engineers,
Delta Water Supply Project
Business Plan Preparation
Durham and Orange Transit Plan Funding Needs
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Division of Business & Finance Accounting Services Information Technology and Plant Operations 2017 Budget Hearing April 22, 2016.
377th Mission Support Group/ Contracting Division Construction Branch
Society of Military Engineers Monthly Meeting, October 11, 2018
DSC ChMC Switching Programme Update 10th July 2019
Project focus areas FY20+ Potential contract opportunities
Presentation transcript:

Customer fund program update Gary Hinkle Omaha Maintenance Engineering & Mgmt Support Chief 13 June 2017

Fiscal year 2016 statistics and performance by facility Generation Plant O&M Costs Forced Outage Scheduled Outage Availability   No. of Units Nameplate Capacity (MW) % of NWO Capacity Net Generation (MWh) O&M Cost ($/MWh) O&M Cost ($/MW) Total No. Hours Unavail Factor (%) Yearly Hours Hours Avail Fort Peck 5 185.3 7.4% 785,506 $8.96 $37,993 580 1.3% 8 11,112 25.3% 43,920 32,228 73.4% Garrison 583.3 23.3% 1,913,683 $5.64 $18,494 16 170 .4% 5,802 13.2% 37,948 86.4% Oahe 7 786.0 31.4% 2,049,195 $3.87 $10,095 11 216 29 9,113 14.8% 61,488 52,159 84.8% Big Bend 494.3 19.8% 746,571 $11.87 $17,920 9 1,081 1.5% 46 3,185 4.5% 70,272 66,006 93.9% Fort Randall 320.0 12.8% 1,460,965 $4.51 $20,595 36 123 .2% 15 11,586 16.5% 58,563 83.3% Gavins Point 3 132.3 5.3% 694,260 $7.70 $40,837 0% 13 2673 10.1% 26,352 23,679 89.9% Total/Average 2,501.2 100.0% 7,650,180 $6.09 $18,612 77 2,170 .7% 127 43,470 13.6% 315,360 270,584 85.6%

Hydropower Master plan Website: http://www.nwo.usace.army.mil/Missions/ Dam-and-Lake-Projects/Hydropower/

Project Status Report Top Initiatives FR Oil Fill Cable Modification WSPC internal exhibits 3rd Qtr Awards A/E IDIQ Program Obligations/Expenditures Authorized: $163M $79M Obligated/$53M Expended FY Obligations: FY14: $8.7M FY15: $28.0M FY16: $22.2M FY17 Queued Contract Obligations To Date: 3 Award/$3.5M 3rd Qtr: 7 Awards/$14.5M 4th Qtr: 3 Award/$7.3M Total: $25.3M Current Workload & Execution Status Projects Design Acquisition Construction Fort Peck 13 6 7 Garrison 3 Oahe 9 4 2 Big Bend 1 Fort Randall 8 Gavins Point Multi-Plants Total 46 19

Fort Randall Current work New Bridge Crane Rehabilitate bridge cranes Complete: June 2017 Switchyard upgrade Complete: Jun 2018 Replace exterior station service equipment Complete: Mar 2018 Replace oil-filled cable Replace generator relays Purchase and install unwatering valves Upgrade station service switchgear and transformers Complete: Dec 2018

Switchyard upgrade & Replace exterior station service equipment New Switchyard Breakers Failed SS Service Equipment

replace oil filled cable, Replace generator relays, & Install Unwatering Valves New & Old Generator Relays New Unwatering Valve New Oil Filled Cable

Closeout/Remaining Funds Fort Randall # ID PROJECT TITLE Authorized $$ PH STA PM BOD Q3 Q4 Q1 Q2 FY17 FY18    1 399807/505 Rehab bridge cranes $3,199,997 C G JP 1/18 F 2 455996/564 Rehab 13.8kV outdoor SS equipment $810,000 10/18 3 399806/504 Oil filled cable replacement $16,674,112 A 9/18 4 449297/547 Purchase & install unwatering valves $1,100,000 11/17 5 Multiple Upgrade switchyard $15,450,000 2/18 6 406244/521 Replace generator relays $500,000 MK 3/18 463086/601 Replace programmable logic controllers $1,000,000  AW 6/19 7 449300/542 456029/566 Upgrade station service switchgear & Replace Station Service Transformers $3,220,000 D 456036/565 Replace powerhouse PT & CTs $195,000 LB 12/18 8 461738/ 595 & 596 Major unit rehab $24,656,334 12/31 S FY18 DSG Digital Governors FY18 AWD Install High Resistance Grounding Replace draft tube stop logs/intake gate PHASE STATUS Projects DSG ACQ CNS G A R 8 2 6 7 1 FINANCIAL Authorized Obligations Expenditures Available $67.2M $32.3M $23.6M $31.5M OA Amber: Thrust Bearing Cooler Repair & GSU Transformer Bushing Repair, PT/CT FY16: 1 project closed out 1 Project awarded FY17: 1 Closeout Complete Oil Containment & Possibly Thrust Bearing Cooler Repair Award: PLC Supply, PT & CTs, Exciters, & Bridge Crane Purchase: GSU bushings 3 New Projects Closeout/Remaining Funds LEGEND 449299/541 Generator step up transformers 125884/476 MRER validation study 399807/505 Rehab bridge cranes PH= Phase, STA= Status, PM = Project Manager D=Design, A=Acquisition, C=Installation/Construction, F=Closeout

Fort Randall Unit Rehab Update Project Objectives: Improve Reliability Increase Turbine Efficiency Optimize Unit Capacity Acquisition Strategy: Conduct sources sought Conduct pre-design industry day Acquisition plan development 4 Contract Actions Rotor spider evaluation (study phase) Hazardous Material Abatement Evaluation (Study Phase) Contract Phase Supply of Generator Step-Up Transformers Main unit rehabilitations includes all generator and turbine work

Rewind Restack Generators & replace turbines ID Description Authorized Funding FY18 Request Total Funding End of FY18 Total Estimate Program Costs Funding Still Required 1 Study, design, develop specifications $3,000,000 $0 2 Rewind Generators $44,156,000 $8,844,000 $53,000,000   Rewind stator Reinsulate field windings Replace stator core 3 Replace Turbines $23,000,000 $159,000,000 $136,000,000 Install turbine maintenance platform Furnish turbine Install turbine runners Modify thrust/guide bearings Replace wicket gates Gates/servos/packing box Refurbish head cover stay ring Miscellaneous system repair 4 Supply and install transformers $15,256,000 $15,256 $25,000,000 $9,744,000 Total $47,362,000 $47,100,000 $94,256,000 $240,000,000 $145,744,000

Study Phase

Biofouling Invasive Species –Gavins Point Dam 2016

Biofouling Invasive Species – Lewis & Clark Lake 2016

Biofouling– Gavins Point Dam 2017