Status of the work of RTCA SC-202

Slides:



Advertisements
Similar presentations
Regulatory considerations for wireless aircraft systems
Advertisements

1 Multi-Function Multi-mode Digital Avionics (MMDA) NASA Glenn Research Center – End of FY05 Status Presented to ICAO ACP WGC-11 GRC/James Budinger September.
03/16/ Status of the work of RTCA SC-202 Co-Chairs:
03/16/ Status of the work of RTCA SC-202 Co-Chairs:
Good Samaritan Acts & Helping Out on Airplanes Legal and ethical aspects.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi / Stephen Berger Chair / Vice-Chair
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
Operational Considerations in the Certification of TAA Slide 1 Operational Considerations in the Certification of Technically Advanced Aircraft (TAA) Robert.
Aero Certification LLC - Proprietary & Confidential Aero Certification & Engineering Capability & Experience Summer 2006.
1 Status of ATSRAC presented to White House Wire System Safety Interagency Working Group Meeting Kent V. Hollinger September 11, 2001.
TCCA Aircraft Certification
Safety Report Treatment of Safety-Critical Systems in Transport Airplanes Office of Research and Engineering.
AVS Repair, Alteration and Fabrication Team (RAFT) Results
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
The Implementation of Aviation Safety Management System in Taipei FIR Ms Chia-CHi Liu Chinese Taipei.
Electronic Flight Bag (EFB)
Doc.: IEEE /214r1 Submission May 2003 Bob Huang, Sony ElectronicsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
WAEA Discussions Jeffrey Schiffer Intel Corporation 11/5/99.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Doc.: IEEE /214r0 Submission May 2003 Bob Huang, Sony ElectronicsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
U.S./Europe International Aviation Safety Conference By:T Fazio (FAA)/ C Probst (EASA) Date: 7 June 2006 “Global Aviation Safety Processes: Refining, Reinforcing,
Information requested following SMS implementation presentation.
SVDM ConOps 18 May 2010 Federal Aviation Administration 0 0 Space Vehicle Debris Threat Management ConOps Presentation to COMSTAC Space Transportation.
Cargo Strategic Action Plan Prepared by: Cargo Strategic Action Group Air Carrier Maintenance Branch, AFS-330.
Enhanced Airworthiness Program for Airplane Systems (EAPAS) Presented by: Massoud Sadeghi FAA - Aging Systems Program Manager EAPAS Workshop November 2002.
Maintenance RAST Conclusions 15 June Maintenance Procedures SE-17, SE-18, SE-19, SE-20 Output 1 (SE-17)  FAA will issue guidance, to their field.
ATSRAC TASK 6 W IRE S YSTEMS H ARMONIZATION W ORKING G ROUP.
1 ATSRAC Overview presented to EAPAS Workshop for FAA Inspectors/Engineers Kent V. Hollinger November 5, 2002.
Doc.: IEEE /1417r0 Submission November 2012 Rich Kennedy, Research In MotionSlide 1 IEEE Regulatory SC San Antonio Closing Report Date:
COMMITTEE CHARTER SAE S-18 Aircraft & Systems Development and Safety Assessment Committee 29 January 2008.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Dawn Lawrence, XO Communications Suzanne Addington, Sprint June.
Aerospace Vehicle Systems Institute On-Aircraft Wireless Communications Research at AVSI Dr. Fred Fisher Asst. Director, AVSI July, 2011.
ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
Workshop on preparations for ANConf/12 − ASBU methodology
Update on WAIC Issues ITU-R Working Party 5B and Future Regulatory Considerations Joe Cramer December 16, 2009.
Spectrum issues and challenges, not on the specific agenda for WRC-19
Sri Lanka's Experience with ICAO TCB Projects
IFATSEA General Assembly Keynote address Berlin, Germany November 2015
VDL Mode 3 Cosite Interference Testing Summary
[RR-TAG Liaison Report to ]
Workshop on preparations for ANConf/12 − ASBU methodology
Status of the work of RTCA SC-202
Update on Wireless Avionics Intra-Communications (WAIC) ICAO, ACP-WG-W, Montreal Marcella Ost January 22, 2010 ACP WG-W/3 IP-3.
Workshop on preparations for ANConf/12 − ASBU methodology
RTCA SC-202 WG6 Summary to IEEE
[RR-TAG Liaison Report to ]
RTCA SC-202 Request for Collaboration
RR-TAG Liaison Report September 2008 IEEE
RST processes Session 5 Presentation 2.
RR-TAG Liaison Report IEEE
Progress in Replacing Halons in Civil Aviation
Briefing to the 5th NARAST Meeting May 2006
RR-TAG Liaison Report September 2008 IEEE
RR-TAG Liaison Report IEEE
NPA 450/579 (Area Code) Relief in Quebec
September 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE – Liaison Report] Date.
RR-TAG Liaison Report IEEE
NPA 403/587/780/825 (Area Code) Relief in Alberta
Summary of RTCA SC-202 Discussions with Consumer Electronics Industry
Balanced Approach to Noise Mitigation
Submission Title: [Regulatory Update]
Call for a Collaborative Effort
“Good Samaritan Acts” & Helping Out on Airplanes
RR-TAG Liaison Report Mar07 IEEE
RR-TAG Liaison Report IEEE
Balanced Approach to Noise Mitigation
RR-TAG Liaison Report IEEE
Presentation transcript:

Status of the work of RTCA SC-202 Co-Chairs:

Define the Risks of T-PED’s to Aviation Safety T-PED’s & Commercial Airplanes: Assessing the Risk & What To Do About It Define T-PED’s Transmitting - Portable Electronic Devices Define the Risks of T-PED’s to Aviation Safety Explain the purpose of RTCA SC-202 Review the committee findings & recommendations Address the committee’s remaining tasks

Defining The Risk Of T-PED’s Unlike Avionics Systems installed on airplanes, T-PED’s are consumer electronics, purchased from retail outlets and used by consumers without specific training.

Defining The Risk of T-PED’s: Radio Sensitivity & Relative Signal Strengths Distance to the moon 384,000 kilometers Human Hair 40 µmeters If the distance to the moon is compared to the transmitting power of a commercial airliner’s VHF radio , then the width of a human hair can break VHF squelch.

Assessing The Risk Of T-PED’s T-PED emissions may reach antennas used by sensitive airplane navigation and communications receivers. Unlike HIRF, the RF source is inside the airplane.

Assessing The Risk of T-PED’s Emissions from T-PED’s may be picked up by airplane wiring or nearby airplane systems devices themselves. Again, unlike HIRF, the RF source is inside the airplane.

Maintaining and Enhancing Aviation Safety: RTCA Special Committee 202 FAA requested that RTCA, Inc. form a special committee to evaluate use of current and next-generation portable electronic devices (PED’s) Particular attention to be paid towards intentional transmitters (T-PED’s) such as mobile phones, wireless RF network devices, and other wireless-enabled devices such as personal digital assistants Phase 1 – current T-PED technologies Phase 2: – upcoming, next-generation T-PED technologies – guidance for airplane design and certification

Committee Representation Regulatory Agencies FAA (Flight Standards, Aircraft Certification, Spectrum Management), UK-CAA, Transport Canada, CAA-Brazil, DGAC-France, FCC Airlines United, Delta Air Lines, US Airways, Continental, Northwest, American, Lufthansa, JAL, ANA, FedEx, UPS, Southwest, QANTAS, Air Wisconsin, ANA Airplane Manufacturers Airbus, Cessna, Boeing, Bombardier, Embraer, Hawker Beechcraft Avionics Manufacturers Rockwell-Collins, Honeywell, Connexion, Matsushita, General Dynamics, Teledyne, AirCell, Row 44 Consumer Electronics Verizon, Intel, Sony-Erickson, Panasonic, QUALCOMM, XCube Communications, CEA, Sony, Motorola, Dell, CTIA, Freescale Semiconductor Associations, Universities, Agencies NASA, UofOK, ARINC, SITA, ALPA, AFA, IATA, EUROCAE, Carnegie Mellon Aviation Industry Consultants CAVOK International, Alion, Eagle’s Wings, AJ Systems, Overlook Systems

RTCA SC-202 Schedule Special Committee SC-202 – Phase 1 Phase 2 2003 April 1963 SC-88 Document Completed September 1988 SC-156 Document Completed August 1996 SC-177 Document Completed Previous PED Committees 1963 1996 January 2003 FAA Request May 2003 First Meeting October 2004 SC-202 Phase 1 Document Completed Special Committee SC-202 – Phase 1 Phase 2 2003 2005

Accomplishments Published guidance on a regulatory approval process for selective use of T-PED technologies Provided examples of: Characterization of current wireless technologies Applicable aircraft avionics operating standards Flight critical systems categorization Mitigation of potential T-PED effects Guidance for PED policies and procedures development passenger and public education goals Recommended revisions to FAA AC 91.21-1A (resulted in publication of AC 91.21-1B) Proposed FAR revisions to incorporate PED Usage Signage Published recommendations on acceptable and implementable use of T-PED focused on use by: Airlines, Airplane Manufacturers, Consumer Electronics Industry, Regulatory Authorities, and Consumers

Maintaining and Enhancing Aviation Safety: Phase 2 Work Completed Refined recommendations for: T-PED design Aircraft design and certification Operational risk mitigation Characterized additional T-PED Technologies Ultrawideband devices Pico-Cell Technology Wireless Medical Devices Active RFID Tag Technology Recommended FAA regulation revisions to address allowable PEDs (Part 14 CFR 91.21 and 121.306) Conclusions on PED Spurious Emissions

When approved by RTCA, will be a separate “DO-YYY” document Maintaining and Enhancing Aviation Safety: Airplane Design and Certification Documented recommendations for PED Tolerant Airplane Design and Certification: Builds upon DO-294B process & guidelines Addressed tolerance to both intentional transmissions and spurious emissions Identifies standard requirements for equipment PED tolerance qualification and for target Interference Path Loss (IPL) Provides process which may be used to demonstrate PED Tolerance as part of airplane certification When approved by RTCA, will be a separate “DO-YYY” document Approval expected in Mid-October 2007 Actual “DO-number” assigned upon approval

Maintaining and Enhancing Aviation Safety: PED RF Emission Assessment Foster Dialog with: Consumer Electronics Manufacturers Avionics Manufacturers Aviation Community Document consensus recommendations on PED Spurious emissions Facilitated by Consumer Electronics Association (CEA) Joint CEA/SC-202 Working Group Recommendations to be an addendum to DO-294B Expected Completion 4Q2008 Work in Progress

RTCA SC-202 Schedule Aug 2007 Design & Certification Document Completed 4th Qtr 2007 “DO-YYY” Document Release Expected 4th Qtr 2008 DO-294B Addendum Released December 2006 Final DO-294B Document Released Phase 2 Operational Guidance PED Emissions Recommendations Design & Cert Dialog Document 2006 2007 2008

Concluding Remarks Committee efforts provide level playing field for T-PEDs impact assessment Documented acceptable and feasible policies and processes for allowance of passenger and crew use of T-PEDs Replacing anecdotal understanding of T-PED operation on aircraft with a common facts-based understanding of the T-PED impacts and situation Documented recommendations and process for operational allowance plans and for airplane design and certification Dialog with Consumer Electronics manufacturers to facilitate use of PEDs for our mutual customer base Further information on RTCA and SC-202 available at http://www.rtca.org/