Electrical Distribution Design Services

Slides:



Advertisements
Similar presentations
Short-Term Alternatives for City Offices. Background and History Citys current lease for City Marketplace offices ends October 31, 2014 For 22,221 square.
Advertisements

STATUS OF CARLSBORG SEWER PROJECT Carlsborg Community Advisory Council Bob Martin June 6, 2013.
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
Membrane Softening Water Treatment Plant completed in –Upper Floridan groundwater wells provide the source water for treatment. –Treatment process.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
Eastern Water Reclamation Facility (EWRF) - Phase V and Centrifuge Dewatering Improvements Project Update March 24,
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Water System Planning Study
Britannia Village Flood Control System Information Meeting for Directly Affected Landowners February 5, 2009.
Water Treatment Plant No. 2 Concentrate Zero Liquid Discharge August 30, 2011.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
South County Reclaimed Water Partnership South County Reclaimed Water Partnership Palm Beach County Water Utilities Department Brian Shields,
SAWS' Twin Oaks Aquifer Storage and Recovery Project SAWS' Twin Oaks Aquifer Storage and Recovery Project October Texas Innovative Water 2010 Roberto.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
City of Palm Coast, Florida City Council Meeting October 2, 2012.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
CONSULTANT SELECTION ACEC-Illinois/ IDOT-Region 1 Local Roads Seminar March 7, 2013.
Interlocal Agreement – Transportation Impact Fees City Council Meeting July 16, 2013.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
Interlocal Agreement with Flagler County related to Airport Development September 16, 2014 City Council Meeting.
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing October 13, 2015.
Britannia Village Flood Control Project Report Back to RVCA Board of Directors – Dec 16, 2010 after attendance at Community Meeting of November 30, 2010.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
Richland Creek Water Supply Program Update and Design-Build Contract for 48” Raw Water Pipeline Paulding County, Georgia Board of Commissioners Workshop.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
City of Johnston NW55th Avenue Improvements Public Open House June 24, 2014.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing May 26, 2015.
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
TVRWRF 23 MGD Expansion Disinfection System Conversion
CITY OF HALLANDALE BEACH
Water & Wastewater Capacity Charge Work Shop
Kings Bluff Raw Water System Parallel Raw Water Main Project
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
State Lobbyist Services
Town Center Lease Agreement
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Recycled Water Project – Sharon Heights GCC
QBS: The Process Selecting a Design Firm
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
Modifications at Existing WTP: $450,000 Construct New WTP: $39,100,000
CP-TXT Amendment to the Capital Improvements Element & Public School Facilities Element (Annual Update) October 2008.
Brackish Water Desalination Project
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
Delta Water Supply Project
City of Sunrise Wastewater Reuse Program
Internet Café Moratorium-Background
Montgomery County Municipal Utility District No. 8 January 4, 2019
Florida Atlantic University
Ward Park Restroom Timeline
Brieana Reed-Harmel, Broadband Project Manager
Presentation transcript:

Electrical Distribution Design Services City of Palm Coast, Florida City Council Workshop November 29, 2011

Water Treatment Plant #3 (WTP#3) Phases WTP#3 Facility and Phase One Wellfield WTP#3 Phase Two Wellfield WTP#3 Future Plant Expansion and Future Phase Three Wellfield

WTP#3 Facility and Phase One Wellfield CPH Engineers complete design and permitting of Water Plant Facility and Phase One Wellfield in April of 2007. General Contractor begins construction July 2007. July 31, 2008 City Water Treatment Plant #3 is officially brought online with phase one wells. Plant can run at 1.5 million gallons a day (MGD) output, half it’s rated capacity.

WTP#3 Phase 2 Wellfield City staff begins negotiation for specific phase 2 well property rights in 2005. Connect Consulting drills the twelve phase 2 wells to service additional WTP#3 raw water needs in 4th quarter of 2006. CPH Engineers complete design and permitting of phase 2 wells and raw water pipeline.

WTP#3 Phase 2 Wells History Well project completion will allow Plant #3 to produce it’s permitted capacity of 3.0 MGD. City acquires warranty deed and easement rights from Rayonier April of 2010. Notice to Proceed issued for Palm Beach Grading to construct wells and raw water pipeline on June 21, 2010.

Electrical City provides for language in the Rayonier agreement that Rayonier will work with FPL on electrical rights for the project. City executes agreement with FPL for electrical service in Sept. 2010. Pays $421,243.00 in fees to FPL. Talks begin to stall between Rayonier and FPL on property rights. City begins to consider alternatives to FPL electrical supply.

Electrical Talks fall apart between FPL and Rayonier. City determines it has the right to install electrical lines within our existing easements. City issues a Request for Qualifications for Electrical design services. CPH Engineers is selected as best qualified firm to design electrical distribution system. City negotiates design scope and fee with CPH Engineers.

Questions