GRPC development in Lyon

Slides:



Advertisements
Similar presentations
Outline Curriculum (5 lectures) Each lecture  45 minutes
Advertisements

Manufacturing Processes for a 4 Layer Multi-layer PCB Section through PCB Via hole SMD Pad The following presentation covers the main processes during.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
1 Operating Experience and Reliability Update on the 5 kW CW Klystrons at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA.
Customized equipment for Printed circuit board industry Microelectronic industry Solar cell industry.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Rapid prototyping is a computer program that constructs three-dimensional models of work derived from a Computer Aided Design (CAD) drawing. With the use.
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
Large-size micromegas for ATLAS (MAMMA) Status and prospects RD51 mini week, 17/01/2011Joerg Wotschack (CERN)1.
Machine Tools And Devices For Special Technologies Printed circuit manufacturing Slovak University of Technology Faculty of Material Science and Technology.
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
1 News and preparation of the Semi-Digital Hadronic CALorimeter prototype Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua,
Kanwalpreet Kaur Communication subsystem & Integration subsystem.
“PCB” -AMIT NIKAM -ASHI NAGARIYA.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb Paris, 8 October 2010.
T.Schneider/LHCb Muon EDR
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb International Linear Collider Workshop Beijing,
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
Resistive ….. I.Laktineh IPN-Lyon. Motivation Calorimeters are expected to play an important role in future experiments (ILC, CLIC…) based on PFA concepts.
MM detector construction One or several modules per sector considerations.
THE VACUUM BOX FOR COMPASS CRYOSTAT MUNICH 23/10/2007 G. GIRAUDO I.N.F.N. TORINO 1.MECHANICS – OVERWIEV 2.WINDOWS 3.INTEGRATION WITH HODOSCOPE.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Interconnection in IC Assembly
Resistive protections Rui de Oliveira 09/12/15
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
CMS GRPC detector& cassette I. laktineh. Concepts Two concepts of RE1/1 detectors were developed : 1- One based on gluing glass plates to have large RPC.
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Concept Design for LBNF Far detector (LAr single phase)
Cathode plane material selection. Cathode requirements Reasons for resistive cathode: – Stored energy in DUNE is sufficient to potentially damage the.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
 A PCB is printed circuit board, also known as a printed wiring board. It is used in electronics to build electronic devices. A PCB serves 2 purposes.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
QC Procedures of Gaps for RE4 RPCs in Upscope K. S. Lee, S.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
Manqi Ruan Status & plans for gaseous semi-digital HCAL in European.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
Large THGEM sampling elements for DHCAL status report
European DHCAL Meeting 13/06/08
Update on Pavia MM mechanical prototype
some thoughts on charging-up effects
The European DHCAL status
A proposal to equip the high eta muon stations with High Rate GRPC
RPC built a new plastic (peek doped with CB)
GRPC activity for EuDHCAL in IHEP-Protvino
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
Cathode plane material selection
“MUON” Collaboration meeting
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Prevention of Corrosion
Overview of mechanical design & construction
Summer 09 Testbeams SDHCAL prototypes
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
Its strengths, your benefits
Presentation transcript:

GRPC development in Lyon DHCAL Meeting 20/01/09 GRPC development in Lyon

Overview Part 1 – technology choices Part 2 – constructed chambers and problems encountered

Part 1: Technology Technology drivers Minimize dead zones Low cost Closed chamber design – no external gas-tight box Reduce area of spacers inside gas volume Low cost Scaleable to 2500 m2 of detector Semi-industrialized production possible

GRPCs ‘Lyonnaise’ – technology (1) Borosilicate glass Anode: 0.7 mm Cathode: 1.1 mm Resistive layer (~ 20μ) Graphite: ρs ~ 2 kΩ/□  Very high multiplicity! ‘Licron’ (polymer): ρs ~ 30 MΩ/□ ‘Statguard’ (oxides of Fe, Ti): ρs > 100 MΩ/□ Insulation layers – mylar 175 μ cathode side (HV ~7.5 kV) 50 μ anode side (0 V)

GRPCs ‘Lyonnaise’ – technology (2) Two types of chamber: ‘Standard’ chamber Frame in G10, thickness 1.2 mm, width 3 mm ‘Channelled’ gas distribution – ‘fishing line’ (PMMA) ‘Capillary’ chamber Capillary tube frame 1.2 x 0.8 mm Frame used to distribute gas (0.3 mm holes drilled in capillary walls) Advantage: reduction of dead zones Support between glass planes: Ceramic balls diam. 1.2 +/- 0.02 mm Distance between balls optimized (ANSYS): 100 mm (max. deformation 44 μ – 81 balls / m2)

Gas distribution, ‘standard’ chambers

Gas distribution,‘capillary’ chambers Anode glass Cathode glass Capillary 1.2 x 0.8

Simulation – gas circulation in standard chamber

Simulation – gas circulation in capillary chamber

Resistive layer Application: Quality control: Statguard: paint roller Graphite / Licron: aerosol Quality control: Surface quality: visual inspection Electrical continuity / voltage distribution Homogenity: measure ρs

Connections HV / ground

Part 2: Constructed chambers Three chambers 1m x 1m produced: 2 x “Licron” chambers 1 x “Statguard” chamber All with standard gas distribution Construction steps: Clean glass and cover with resistive cloating Glue micro-balls, frame, gas spacers and capillary tubes to cathode glass on gluing table Add glue to upper surfaces of balls and gas spacers Turn table to vertical position Introduce anode glass Turn table to horizontal position Add weights to anode glass and wait for glue to dry Deposit glue lines between glass and frame to make gas-tight Glue 6mm gas connectors to capillaries and solder HV connectons Transfer to honeycomb support

Gluing table

Gluing the gas channel spacers

Statguard chamber + Honeycomb Support

Vacuum pick-up system

Large area read-out 144 ASICS/m2 → 9472 channels/m2 (chamber is underneath!) Stainless steel PCB support (CEIMAT)

Problems encountered Gas tightness HV connection reliability Statguard resistivity

Gas tightness First chambers inflated under gas pressure! Glue failure caused balls to become detached from upper glass Subequent failure of glue around perimeter → gas leaks Over-pressure in chamber not excessive (Δpexit ~2.5 mbar ≡ 250g / ball max.)

Glue test Usual glue – two-component epoxy AY103 + HY951: 2.7g/cm2 Dow Corning RTV Silicone 3140: 5.0g/cm2 Araldite epoxy 2011 / 2012: 108 g/cm2

HV connections Recurring problem – loss of HV connection on Licron chambers Apparent thinning of Licron layer near the copper strip glued to the glass Occurred using: Copper Scotch with conductive adhesive Copper strips glued with silver-loaded varnish Loss of electrical contact after just a few days Solutions found: Graphite Scotch Epotek EE129 conductive epoxy Long-term reliability unknown

Statguard resistivity (1) Commercial product used for ESD protection of floor surfaces Potential to silk-screen print onto glass Relatively inexpensive Good surface finish Small chamber in Nov. 08 test beam performed reasonably well (efficiency, multiplicity) → see Keiffer talk 1m2 Statguard chamber in same test beam had static build-up problem → damage to HARDROCs Thought to be caused by very high Statguard resistivity (~500MΩ/□) Static accumulation much less for 1m2 Licron chambers (~20 MΩ/□)

Statguard resistivity (2) Resistivity not easily controllable: Varies from 10 MΩ/□ to >500 MΩ/□ for no apparent reason Same glass cleaning procedure Same method of deposition (roller) Same number of layers and approximate layer thickness Recent tests indicate roller may be to blame Consistent results (~25 MΩ/□ for 1 coat) with paint brush or skimmer

Current status and future plans Three 1m2 chambers have been built One of these under volts and taking data for several weeks in the lab Short-term plans Investigate other resistive coatings (colloidal graphite, ‘Isovic’, …) Read out whole surface with large PCBs Characterize whole surface Longer-term Move to dedicated construction / testing facility Industrialization of construction: silk screen printing, glue robot, vacuum picking,… Optimization of gas distribution, gas re-cycling Study of mechanical integration issues