Cornell Updates Series test of single cell is on going.

Slides:



Advertisements
Similar presentations
T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
Advertisements

Recent Surface Studies in KEK-STF
Slide #1. Slide #2 Interpret as an x-t or v-t graph.
US Cavities Status and Plan Mark Champion 01 October 2009.
Latest Design of ILC ( RDR). 1.3 GHz technology developed by TESLA Collaboration, R&D from 1992 to reduce the cost per MeV by a factor of 20 from current.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
Single cell coordination. Single Cell Cavity Activity Outline 1.ANL EP optimization (TE1AES005) 2.R&D cavities A. Tumble, 2 cavities (TE1ACC004, NR-6,
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
1 BCD/ACD developments for Cavities Several improvements are needed on both BCD/ACD A significant amount of R&D work is needed to resolve issues –Quality.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
9-cell cavity coordination CM Ginsburg 8 Mar
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
High Q R&D at JLab G. Ciovati, P. Dhakal, R. Geng, P. Kneisel, G. Myneni TTC Topical Meeting on CW SRF Cornell Univ., June 12 th -14 th, 2013.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
GSI-Cryoexpertmeeting; 19. & Cryoplant for series test facility Standard plants have a capacity up to A capacity of about 1,5kW is.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.
Update on S0, S1 for ILC R&D H. Padamsee, Cornell For the S0/S1 Task Force.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
R&D Expected in Cooperation with Vendors ILC Baseline Assessment Workshop Mark Champion September 09, 2010.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Single cell coordination. Single Cell Cavity Activity 6-month plan 1.ANL EP cavities (TE1AES005, TE1ACC001) 2.R&D cavities Tumble, 2 cavities Laser re-melting,
JLab Update Rongli Geng, Aril Palczewski, Yongming Li September 4, nd ILC Cavity Group Meeting.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
Plans for Gradient R&D and Cavity Processing and Testing in the Americas Region in FY08-09 Mark Champion 21 April 2008.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
9-cell cavity coordination CM Ginsburg 15 Mar
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
WG2 discussion Conveners: G. Ciovati, D. Kostin, Y. Yamamoto.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Cornell Updates Commissioning of T-map for ILC single cell starts.
Motivation Vertical Electro-Polishing for high gradient cavity R&D.
Status and plans for the 3.9 GHz section of XFEL
ILC10 Beijing Global Design Effort
ILC R&D Board Meeting: SRF Cavities Status and Plans
Cavity Gradient R&D Status and Future Plans for TDP-2
Vertical Electropolishing at Marui & KEK
Rongli Geng Jefferson Lab & GDE
for the FNAL/ANL, JLab, and Cornell cavity teams
Surface Analysis of the Quench Area Sample of Cavity Z111
High Q R&D at Fermilab Anna Grassellino TTC Topical Meeting on CW SCRF
S0 Status report from KEK
Notes on Ramp-Up and Production
ILC Cavity & Cryomodule Overview
Production Cavities in progress
Recent SCRF Activities in IHEP
Quality control study with single-cell cavities
Highlights from EU Global Design Effort
Mechanical Polishing of 1.3 GHz Niobium Cavities
TTC topical-meeting on CW SRF 2013
Identifying Cells.
Update from single-cell low temperature doping runs at JLab
IHEP Cryomodule Status
N-infusion, Vertical-EP, and ILC cost reduction efforts at Cornell
Cornell Results 20 V 60 V Changing the Growth of Oxide (By Anodizing) Has Small Effects 20 V.
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Recent 160 C “N infusion” impurity doping results
Maps one figure onto another figure in a plane.
Cavity & Cavity Integration; recent KEK activities
Low-T Baking at Cornell
Presentation transcript:

Cornell Updates Series test of single cell is on going. IS-5 from KEK was processed and tested at Cornell. Results are shown in next slide. Processes were mirror finish tumbling, degassing, BCP, 120C bake, HF rinse. These test includes a part of qualification of TM-furnace. Multi-cell T-map system commissioning is done. ILC 9-cell (A9) has been tested several times with multi-cell T-map. This system covers 7cells, additional boards for end cells are planed to make. Reproducibility and resolutions(±1mK) are confirmed. We will install this T-map when we test ERL 7-cells. Facilities are busy on ERL 7-cell works now. Chemistry is very busy on 7-cell fabrication and preparations, we have no new results on VEP R&D so far. VEP on cavity and coupons are planed for coming couple of weeks.

Single results Series test on IS-5 Next VT Plan -post HF rinse. Best at KEK (CBP+EP’ed) +120C bake in TM furnace +BCP(10um) +degassing in TM furnace Mirror finish + BCP(10um) +kept 100K over night 2K meas. Next VT Plan -post HF rinse.