SPS Personnel Protection System Renovation Project

Slides:



Advertisements
Similar presentations
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
Advertisements

7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Tomasz Ladzinski, Didier Vaxelaire. Current Access Configuration 18/06/2015T.Ladzinski GS/ASE2.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Extraction and beamline progress B.Goddard TE/ABT.
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
East Area Renovation Project Planning activities Quentin Bouirek / EN-EA, East Hall under construction
ABT-EC EYETS Activities 2nd reports
SPS Winter stop Planning meeting (N06) 05/01/2011
EYETS Works EN-EL [ FC excluded ]
BE-ICS Activities during the LS2 Period (15 min)
TE-MSC activities in SPS during LS2
EHN1 Extension planning
CENF – Personnel Protection System Preliminary Study
CENF – Personnel Protection System Preliminary Study
EYETS LHC 2016/2017 Works EN/EL/CF
Evolution and future of the Access safety and control systems
AD consolidation activities in LS2
LAAWG Status Report – 15th May 2007
EC Activities Status for the LIU
CE Status: Activities executed until 03/08 and ongoing
BE-ICS activities for LIU Project
Quality Assurance applied to Accelerator Safety
EN-HE SPS works during EYETS
LHC Civil Engineering Activities for YETS – LS2
1v0.
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
SPS activities during LS2 TE-EPC (Power Converter Group)
James Ridewood BE-OP-SPS
TE-MSC activities in SPS during YETS
Status with crucial LSS5 kicker transmission line cables
East Hall under construction
BE-ICS work for SPS Safety Systems
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
GIS Portal Racks Project
Technical Stop #4 29th August - 2nd September 2011
Experimental Areas – LS2 planning
MPS commissioning at ESS
Access Control for CERN Experimental Areas
ILO Industrial Opportunities Days, 6-7 June 2019
SPS Injection BIS - Draft requirements
Presentation transcript:

SPS Personnel Protection System Renovation Project Tomasz Ladzinski for the SPS PPS Project Team 07/06/2017 SPS LS2 Planning Meeting #3

What’s so special about access ? Access interlocked with beam – during accelerator operation period: “do not touch” Access equipment heavily used during access periods; interventions not very popular… LS2 objective is to renovate, while: Providing basic access control functionality with limited perturbation to the users; Monitoring the “external envelope” consisting of access points and the end-of-zone doors. 07/06/2017 SPS LS2 Planning Meeting #3

SPS LS2 Planning Meeting #3 Work Breakdown Central Infrastructure Servers, HMI, Global PLC – change to current technology Will be done in two steps: temporary installation in 104, then in the CCC (1 week of perturbations) Access Site rack equipment Change the PLCs, relays etc., centralized UPS 1 week dismantling, 2 weeks installation Access Point Personnel and Material Access Devices 3 weeks for access point replacement External Envelope Doors instrumentation 1 week works with minor impact Internal Doors / Patrol Boxes instrumentation 2 weeks works with minor impact EIS-beam/machine interlocks Several punctual interventions, no major impact 07/06/2017 SPS LS2 Planning Meeting #3

SPS LS2 Planning Meeting #3 Location of Works The entire SPS Complex is concerned: SPS Ring - BA1, BA2, BA3, BA4, ECX4, BA5, ECA5, BA6 East Extraction & AWAKE - TAG41, TAG42 West Extraction & HiRadMat - BA7, TT61 North Area primary - BA80(TCC2), BA81, TCC8, ECN3 Works with most impact at the access point (surface for the ring) dismantling of the turnstile, door and racks installation of PAD, MAD, new door, finishing grids. 07/06/2017 SPS LS2 Planning Meeting #3

Access Point Components SAIMA Ele 2000 PAD as in the PS, with an integrated rack (1050 x 1600) SAIMA MAD as in the PS and LHC – the minimum width is at least as large as the elevator. (1200 x 2500) Emergency Exit door (900 mm passage) 07/06/2017 SPS LS2 Planning Meeting #3

Access Point Replacement Replacement of an access point: 3 weeks No access through the access point during 2-3 weeks, possible to enter from adjacent points. Minimize the duration of access perturbation and the cost of temporary workarounds Schedule to bother the least (e.g. use the same time windows as lift renovation) – 2-3 weeks Guards with “access control suitcase” – 2-3 weeks (Expensive) Temporary turnstile relocation – 1 week (Expensive) Pre-install in vicinity and swap access points –1 week (Space issues) 07/06/2017 SPS LS2 Planning Meeting #3

SPS LS2 Planning Meeting #3 Dependencies PLAN Item 10035 (pilot AP installation ECA5 in 2018) Item 10036 (all other works during LS2) Integration studies EN/ACE Signal cabling, fibers etc. – EN/EL Connection with EIS-beam/machine/external – BE/ICS/AS, EN-STI, TE/EPC, TE/ABT, EN/CV, HSE/RP, TE/MSC Metallic structures, grids, door adjustments – SMB/SE, EN/ACE Transport of access point equipment, racks etc. from bld. 104 to the sites – EN/HE 07/06/2017 SPS LS2 Planning Meeting #3

Testing and Commissioning Multi-stage approach Test of Access Point after installation Test of a complete access zone – access blocked during 1-2 days Global tests – required one week with no access just prior to the SPS closure, prerequisite to allow safe tests of the SPS hardware. DSO Test before first beam 1-2 days 07/06/2017 SPS LS2 Planning Meeting #3

SPS LS2 Planning Meeting #3 Planning – version 0 This is a very first attempt… Version 1 will be provided once more input is available (cabling, lifts etc.). 07/06/2017 SPS LS2 Planning Meeting #3

SPS LS2 Planning Meeting #3 07/06/2017 SPS LS2 Planning Meeting #3