Sustainable Reconstruction of the A6 Motorway Green Public Procurement for infrastructure at Rijkswaterstaat Ingeborg Ligtenberg Senior Project Manager Eafip workshop for public procurers in the transport and mobility sector 14th june Brussels
Content The Rijkswaterstaat Sustainability approach Procura+ award winning SAA project: A6 Almere for 'Best tender procedure of 2016’ How sustainable procurement? What to expect in the near Future? Questions? Eventuele voettekst
The Rijkswaterstaat Sustainability approach Six area’s defined: Energy and Climate Circular economy Sustainable area development Sustainable Accessibility Sustainable water management Health Since 1795, Rijkswaterstaat has gained in 2016 a new core task: the care for the living environment is our primary focus. Eventuele voettekst
Focus area's RWS “To make Paris live” 2020: -20% CO2 2030: Energie Neutral 2050: Climate Neutral Every RWS civil project contributes “Waste less Economy ” 2030: RWS circular 2030: -50% primary or raw materials 2050: No waste 2020: ECI value – 20% in RWS projects “Sustainable area development " Think from the area task Multiple Uses Together with others Green deal GWW -collaboration with the construction industry Eventuele voettekst
The sustainable Civil Infrastructure approach Green deal duurzaam GWW 2.0: Sustainability is standard procedure in every rail, road and water construction and maintenance activity in the Dutch infrastructure sector Public-Private Collaboration: sustainability is ‘business as usual Eventuele voettekst
A6 Almere Havendreef – Almere Buiten-Oost Eventuele voettekst
Procura+ award winning SAA project: A6 Almere for 'Best tender procedure of 2016’ Smart transportation solutions Use of recycled materials Smart use of asphalt Energy neutral Reduction of 52.800 ton CO2/Energy reduction 15.048 toe /Reduction of 39.900 ton asphalt Eventuele voettekst
How Sustainable Procurement? Functional specifications; to stimulate effective and innovative solutions Sustainable MEAT(Most Economically Advantageous Tender) criteria obligatory Two instruments:
“Identification of Company Co2 emission and energy saving policy” “Innovative Co2 reduction, use of renewable energy and know Co2 emissions of suppliers” “Identification of Company Co2 emission and energy saving policy” Improving business operations 9
DuboCalc Sustainable Construction Calculator DuboCalc calculates the environmental impacts of the different infrastructure designs, based on material and energy use during the whole lifecycle DuboCalc uses the method of the environmental Life Cycle Analysis (LCA) Objective DuboCalc comparison of tender-bids As a awarding criterion in MEAT MEAT(Most Economically Advantageous Tender. The bidder with the lowest ECI (the most sustainable design) is best valued. A software tool to measure sustainability of a project(design) in an objective and standardized manner, to be used as awarding criterion in a procurement process” The difference between DuboCalc and the CO2PL is that the CO2PL is an incentive for improving the business operation and DuboCalc gives a incentive to improve the sustainability of the design. DuboCalc makes a objective comparison possible of tender bids
Dubocalc how does it work? Input Project calculator Design specs (quantity materials) € environmental (shadow)costs “ECI” Environmental Cost Indicator Library (National database Building Materials) ISO 14040 NEN 8006 SBK corporation
Procura+ award winning SAA project: A6 Almere for 'Best tender procedure of 2016’ Smart transportation solutions Use of recycled materials Smart use of asphalt Energy neutral Reduction of 52.800 ton CO2/Energy reduction 15.048 toe /Reduction of 39.900 ton asphalt Eventuele voettekst
What to expect from near Future? 100% Eventuele voettekst