CODE REVIEW: DOH Article 28 Compliance

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
NOTICE SUBMISSIONS Requirements and Procedures 1.
EOC: Semi-Annual Review of DOH Survey Citations, The Top 10!
1 NYP BEST PRACTICES EXISTING CONDITIONS SURVEYS Presentation to Approved A/E Vendors to NYP June 17, 2013.
CODE REVIEW: DOH Article 28 Compliance Establishing a Feasibility process that is focused on compliance with New York State Department of Health rules.
NYP BEST PRACTICES Certificate of Need Process Angela Gonzalez-Perez
Regulatory Compliant Performance Improvement for Pharmaceutical Plants AIChE New Jersey Section 01/13/2004 Murugan Govindasamy Pfizer Inc.
Code Comparison Changes 2012 IBC to 2012 NPFA 101 Developed for the Florida Department of Business And Professional Regulation Building Codes and Standards.
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
Humidity in Anesthetizing Locations Where Mechanical Systems and Compliance Collide Daniel Swanson | Project Director Healthcare | McKinstry Currently.
Life Safety Assessing life safety of a building is a process of estimating the quality of security against fire and its effects. Life safety implies avoiding.
Health Facilities Planning Seminar Plan Review Division Irvin J. Poke, AIA, Chief Todd Y. Cordill, NCARB, Assistant Chief Providing for Michigan’s Safety.
1 NYP BEST PRACTICES CODE REVIEW: LIFE SAFETY Larry Borsinger, MBA Director, Facilities Operations - Regulatory Compliance Sukhjit Tom Singh, MHA, MPH.
An interactive discussion of understanding the certification & exploring its design benefits.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
FIRE DRILLS David McMahon, RS, MPH Phoenix Area Indian Health Service.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
C U S T O M E R D R I V E N. B U S I N E S S M I N D E D. Department of Licensing & Regulatory Affairs Bureau of Construction Codes Keith E. Lambert, P.S.,
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Utilities & Engineering Department16 Blossom St., Boston Introduction to the Hospital Emergency Power Supply System (EPSS) Jason D'Antona,
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Certificate of Need Process NYP Best Practices for Architects & Engineers May 2, 2016 Angela Gonzalez-Perez Director, Regulatory Planning.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
1 Existing Conditions Survey/Field Verification For Article 28 Space Best Practices May 2016.
Steve Griffith February 28th, 2017
Objectives Upon completion of this training, agencies will be able to:
Continuing education: Delivering Quality Programs Across Texas
NYP BEST PRACTICES CODE REVIEW: LIFE SAFETY Larry Borsinger, MBA
PUBLIC HEARING PROCESS AND REVIEW FOR THE PROPOSED ADOPTION OF THE 2012 INTERNATIONAL CODES AND THE 2014 NATIONAL ELECTRICAL CODE.
Hazardous materials: What to look for
Fort Stanwix National Monument Energy Audit Contract
The Peer Review Higher Weighted Diagnosis-Related Groups
TOPIC: THE VALUE OF BIOMEDICAL ENGINEERS AND TECHNICIANS IN HOSPITAL PRESANTED BY: KWIZERA ABRAHAM STUDENT IN: BMET /FINALIST STU INSTITUTION: IPRC KIGALI.
Existing Conditions Survey/Field Verification For Article 28 Space
NYP BEST PRACTICES Certificate of Need Process Angela Gonzalez-Perez
PLWG Review 6.9 and the Interconnection process
Certificate of Need Process
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Q2 Advocacy Liaison Webinar 6/8/16
Who is ICC? Private, Non-profit public benefit corporation:
HCS 446 Competitive Success/snaptutorial.com
HCS 446 Education for Service/snaptutorial.com
HCS 446 Teaching Effectively-- snaptutorial.com
Florida Building Commission Lightning Protection Workgroup
OHS Staff Introduction Training
GMAS Preproposal Entry
The Owner’s Project Requirements (OPR) Process
Personal Protective Equipment (PPE)
Brad Keyes, CHSP HFAP Engineering Advisor Jamie Crouch, BSBM, MHA
Integration of Primary Care and Behavioral Health Services
Disability Services Agencies Briefing On HIPAA
CONTINUING EDUCATION: The ABC’s of Submitting a Program
P-100 Industry Day 29 November 2007.
Risk Management Practice (Case study: Sydney Opera House)
Locking the Means of Egress in Health Care Facilities
Research Phase, Indiana 811, Initial Notice, Verification
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
Pre Construction Risk Analysis
NYP BEST PRACTICES EXISTING CONDITIONS SURVEYS
Personal Protective Equipment (PPE)
Emergency Preparedness Requirements
105 Indiana Administrative Code Article 13
Personal Protective Equipment (PPE)
Personal Protective Equipment (PPE)
Presentation transcript:

CODE REVIEW: DOH Article 28 Compliance Establishing a Feasibility process that is focused on compliance with New York State Department of Health rules and regulations.

OBJECTIVES: Get it all out there up front! (avoid hidden scope) Streamline DOH submission and approval process Eliminate costly scope changes during design, construction, and DOH Survey Phases. Everyone saves time and money!

CONTENTS: STEP 1: Define the Functional Program STEP 2: Code Review

1 CONTENTS: STEP 1: Define the Functional Program Owner’s Project Requirements (OPR) DOH Article 28 Requirements Deliverables STEP 2: Code Review

1 DEFINING THE FUNCTIONAL PROGRAM: Owner’s Project Requirements FDC PM will: Provide a brief scope narrative that summarizes the clinical, administrative, and/or support functions and the anticipated boundaries of the project. Regulatory Planning Will: Make preliminary determination of whether or not DOH filing is required and what type of filing that will be. A/E Team Must: Question, Confirm, Dig Deeper! Get Specific - Who are your patients? What types of procedures will take place? How often? Is Radiation involved? Has equipment been selected? Make an initial determination of DOH Article 28 requirements

1 DEFINING THE FUNCTIONAL PROGRAM: Deliverables Preliminary Functional Space Program Preliminary Room Data Sheets (temperature, lighting, furniture, equipment, etc.) Article 28 Requirements with which the project must be in compliance.

3 CONTENTS: STEP 1: Define the Functional Program STEP 2: Code Review Introduction Applicable Codes Code Review Meeting Code Analysis Format Non-Conforming Conditions

3 CODE REVIEW : Introduction The A/E team must establish compliance with DOH Article 28 rules and regulations from day 1. CON Filing and Approvals are often delayed due to the following: Incomplete or inaccurate definition of the clinical functions that will be delivered within a project’s scope. Failure to incorporate the full Article 28 defined scope of the project: Full smoke compartment and path of egress compliance Compliance with all unit or departmental requirements under FGI Guidelines.

3 CODE REVIEW: Applicable Codes The A/E team is responsible for identifying and reviewing compliance with ALL applicable Codes and Standards. The A/E team is responsible for correctly identifying the currently adopted versions of the Codes and Standards. The A/E team is responsible for reviewing all codes and standards referenced by Primary Codes and Standards. For instance, the FGI Guidelines reference over 85 other codes, standards and guidelines that should be reviewed for applicability depending on the specific project type and scope.

3 CODE REVIEW: Examples of Applicable Codes New York City Building Codes: NYC Building Code (2008 edition) NOTE: Depending on the original completion date of a facility and the specific scope, a project may have the option of utilizing the 1968 edition of the code. NYC Building Bulletins, PPNs, Directives, Executive Orders and Memos NYC Code Revisions NYC Electrical Code (2011 edition) NYC Mechanical Code (2008 edition) NYC Fire Code (2008 edition) NYC Fuel Gas Code (2008 edition) NYC Energy Code (2008 edition) New York State DOH / OMH Codes: NYCRR Title 10 Part 712 – Standards for the Construction of General Hospital Facilities FGI Guidelines for Design and Construction of Health Care Facilities (2010 edition) NYCRR Title 14 – Mental Hygiene Life Safety / Fire Protection Codes: NFPA 101 – Life Safety Code (2012 edition) NFPA 99 – Healthcare facilities Code (2012 edition) NFPA 13 – Sprinkler Systems (2103 edition) NFPA 14 – Standpipe and Hose Systems (2013 edition) NFPA 72 – Fire Alarm and Signaling Code Accessibility Codes: ADA Accessibility Guidelines for Buildings and Facilities (ADAAG) NYC Accessibility Code (NYCBC Chapter 11) ANSI A117.1 (2009 edition) Uniform Federal Accessibility Standard (UFAS)

3 CODE REVIEW: Code Review Meeting (allow 3 hours – really!) Purpose: To gain a complete understanding of the clinical functions and procedures that will occur within the project boundaries and identify other areas within the department or within the smoke compartment that may need to be incorporated within the project. Attendees: Clinicians Project Administrator (PA) Infection Control Regulatory Planning Regulatory Compliance Facilities Operations (Engineering) Project Manager Architect/Engineer

3 CODE REVIEW: Code Review Meeting Typical questions the architect must raise: Does the existing space have the required support spaces with the required ventilation? Are you changing occupancy or egress? Are you impacting floors above or below? Does the new procedure room you are designing require 65 degree temperatures because the clinical staff will be wearing heavy lead shielding and will the reduction of in-coming air temperature require that you add reheat coils in spaces up-stream or down-stream from yours?

3 CODE REVIEW: Code Analysis Format Architect must format Code Analysis as commentary within the actual code text. Architect must provide analysis for additional code sections referenced within the text. Review line by line in Code Review Meeting. Floor Plan to be on large scale monitor during Review.

4 CODE REVIEW: Identification of Non-Conforming Conditions Based upon the approved Functional Program, Existing Conditions Review, and Code Review analysis, a list of all existing and potential non-conforming conditions should be generated. This analysis should also include any existing waivers that have been granted from NYDOH that may require remediation as part of the project scope. Note: Waivers from previous projects do NOT carry over to current projects.

4 CODE REVIEW: Strategies for Resolution of Non-conforming Conditions Remediation (work with FDC PM to evaluate impact on cost and schedule) Waiver Request

3 CODE REVIEW: Deliverables Code Review Analysis, including proposed means of addressing non-conforming conditions Sign-off on Code Analysis by all participants in Code Review Meeting

CONCLUSION: A thorough and complete review of Functional Program and DOH Article 28 Code requirements during the Feasibility Phase results in a reliable project scope and budget that will Streamline the DOH approvals process Reduce or eliminate costly changes during later phases of design and construction. Result in owner savings and A/E profit