Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Microsoft Project 2002 Sessions 5-6. Entering Tasks During this first session we will enter a set of tasks that comprise building a shed – data sheet.
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Monitoring and Controlling
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 10 Project Monitoring and Control
Project Management 6e..
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Monitoring and Control. Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13: Progress and Performance Measurement and Evaluation
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Monitoring and Information Systems
EARNED VALUE MANAGEMENT (EVM)
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Project Management 6e..
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Where Module 04 : Knowing Where the Project Is 1.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Schedule Control (Earned Value)
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
Performance Measurement Baseline Contract Price (Project Price)
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
TOPIC-8B- PROJECT COST CONTROL
PROJECT MANAGEMENT AND CONTROL
Project COST Management
Budget Planning.
Project Management (x470)
CHAPTER:7 Project Cost Management
Earned Value Management
Chapter 7: Project Cost Management
Project Communication, Tracking, and Reporting
Performance Measurement Baseline Contract Price (Project Price)
5. Cost resources & PLAN DURATION
Earned Value Management
Project Cost Management
Work Packages / Deliverables Completed
Progress and Performance Measurement and Evaluation
Earned Value - What is it
Project Management 9. Performance Management
Earned Value Analysis It is a continuous comparison between the plan of the project data and the actual data. Budgeted and Committed Cost: Variance = Budgeted.
An Introduction to Earned Value Performance Measurement
Implementing EV in IT A Three Step Approach John Chapman Touchstone Ltd
PROJECT COST MANAGEMENT
Earned Value Measures Planned Value (PV) Earned Value (EV)
ENGINEERING MANAGEMENT (GE 404)
فرآيند كنترل پروژه.
Controlling cost.
Earned Value Management
5. Cost resources & PLAN DURATION
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
MS Project Add-on for Earned Value Analysis Reporting
Project Management Life Cycle
Monitoring and Controlling
Managing Project Work, Scope, Schedules, and Cost
Chapter 7: Project Cost Management
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Presentation transcript:

Project Monitoring www.AssignmentPoint.com

What Should be Monitored? Resources Mobilization Utilization Problems observed or anticipated Activities Volume of project activities (with description) Progress of activities (with dates of major milestones) Performance of efforts www.AssignmentPoint.com

Volume and date of output and results (with description) Target reached, quality and specifications of the outputs Problems observed or anticipated Overall results and performance Extent of achievement of the project objectives Potential impacts Others Environment changes including regulations and laws Stakeholders’ priorities, needs, perceptions, and reactions www.AssignmentPoint.com

Project Cost/Schedule Control Purpose Assess the project progress and cost performance Forecast the future performance Measuring project progress Actual starting and completion dates Dates of major milestones % of the work done Measuring the project costs Cost accounts are established for (groups of) work packages in WBS that are managed and accounted for individually www.AssignmentPoint.com

Project Cost Control Using Earned Value One way of measuring overall performance is by using an aggregate performance measure called earned value A serious difficulty in comparing actual expenditures against budgeted is that the comparison fails to take into account the amount of work accomplished relative to the cost incurred The earned value of work performed (value completed) for those tasks in progress is found by multiplying the estimated percent completion for each task by the planned cost for that task The result is the amount that should have been spent on the task so far The concept of earned value is to combine cost reporting and aggregate performance reporting into one comprehensive chart www.AssignmentPoint.com

Terminologies for Earned Value Analysis Budgeted Cost of the Work Scheduled (BCWS) or Scheduled Cost: The estimate of total costs for the project activities scheduled to be done in a given period, based on: the baseline schedule (including the percentage of the work scheduled to be completed in the given period) the itemized project budget, including the time-phased cost schedule for all the direct (labor, equipment, materials) and indirect costs www.AssignmentPoint.com

Actual Cost of the Work Performed (ACWP) or Actual Cost of Work Done: The actual cost (for labor, equipment, materials and OH) incurred for the work performed in the given time period. ACWP includes: the cost of the labor, equipment and materials actually used in the work done the proportional part of the overhead the cost transactions provided for the work done on credit as account payable www.AssignmentPoint.com

Budgeted Cost of the Work Performed (BCWP) or Earned Value: The cost of all works performed by the project within a given time period, which is calculated based on: the budgeted costs of the project activities the percentage of the activities that have been completed in the time period under review General formula: BCWP = Budgeted cost × % of work done Thus, BCWP for a completed task is the budgeted cost of this task BCWP of partially completed work package is estimated more subjectively, using an actual tally of the work completed so far www.AssignmentPoint.com

www.AssignmentPoint.com

Performance Analysis Schedule Variance (SV) BCWP - BCWS Shows the amount in dollar terms that the total work completed to date is less or more than planned, suggesting that project is behind or ahead schedule SV < 0 means project being behind schedule Cost Variance (CV) BCWP –ACWP Measures the cost performance of the project CV < 0 means cost over-run www.AssignmentPoint.com

Performance Indices Schedule Performance Index (SPI) BCWP/BCWS Cost Performance Index(CPI) BCWP/ACWP Cost-Schedule Index (CSI) CPI*SPI Values of SPI and CPI greater than 1.0 indicate work is ahead of schedule and under budget Values less than 1.0 represent the opposite www.AssignmentPoint.com

Forecasting Future Cost Performance Estimated Cost to Complete the Project (ETC) ETC = Remaining work/CPI = (BAC –BCWP)/CPI Estimate Cost At Completion (EAC)/ Forecast At Completion (FAC) EAC = ACWP + ETC www.AssignmentPoint.com

www.AssignmentPoint.com project management

Earned Value Rule In practice how do we estimate the “% of work done”? Using subjective judgments (supported by pre-established procedural guidelines) Based on number of units of output completed Using fixed formula (0-100, 50-50, % of the total project value rule) www.AssignmentPoint.com project management

Example Fiberoptic Ltd. is installing fiber-optic lines into one state of United States. The manger wants to monitor the progress of the project at the end of day 5. He found him in the position given in the following table regarding the project progress. a) Develop a baseline plan for the project. b) Prepare a status report of the project at the end of day 5. c) Is the project experiencing cost overrun or underrun? Will the project finish on time? www.AssignmentPoint.com project management

Activity Predecessor Duration (Days) Budget ($’000) % complete to date Actual cost ($’000) A - 2 20 100 B 3 12 C 10 80 D 1 5 E 4 16 F C, D 24 G E, F 9 www.AssignmentPoint.com project management