 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
© The McGraw-Hill Companies, Software Project Management 4th Edition Monitoring and control Chapter 9.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
Monitoring and Controlling
Project Management 6e..
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
Project Management Methodology Project monitoring and control.
1 ev14a Interactive Session 4 u Tuesday, July 17 7pm to 10pm u Build a sqa plan for the dental office software u Assume a 3-person, development team, a.
Conducted By: Dr. Madhu Fernando, PMP, DBA, MEng. MGT PROJECT MANAGEMENT LESSON 5 AND 6: PROJECT PLANNING – TIME AND COST PLANNING AND MANAGEMENT.
Software Project Management (SPM)
EARNED VALUE MANAGEMENT (EVM)
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Earned Value SOS section Sp8Jan24ev3. Earned Value Analysis One approach to measuring progress in a software project is to calculate how much.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Department of CS & Eng. MSSE Program, © Fissure 1 SOFTWARE PROJECT MANAGEMENT COURSE Executing, Monitoring and Controlling Session #7.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
Where Module 04 : Knowing Where the Project Is 1.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
Schedule Control (Earned Value)
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
DEVELOPING A STATUS REPORT: A HYPOTHETICAL EXAMPLE Tong Wang P , Chapter 13 Process and performance Measurement and Evaluation, Project Management.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Developing the schedule – Tracking Gantt charts Critical path method – Longest path, earliest time Schedule trade-offs using CPM – Free slack, total slack.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
Project Monitoring
“PMP® Exam Prep” Earned Value Management
TOPIC-8B- PROJECT COST CONTROL
Budget Planning.
Project Management (x470)
CHAPTER:7 Project Cost Management
Earned Value Management
Project Management – PTM712S
Chapter 7: Project Cost Management
Project Communication, Tracking, and Reporting
PROJECT MANAGEMENT AND CONTROL
Monitoring and control
Project evaluation and control
5. Cost resources & PLAN DURATION
Earned Value Management
Project Cost Management
Work Packages / Deliverables Completed
Progress and Performance Measurement and Evaluation
Earned Value - What is it
An Introduction to Earned Value Performance Measurement
Implementing EV in IT A Three Step Approach John Chapman Touchstone Ltd
Project Implementation
Earned Value Measures Planned Value (PV) Earned Value (EV)
ENGINEERING MANAGEMENT (GE 404)
Software Project Management Fifth Edition
UNIT-5 Monitoring and Control
فرآيند كنترل پروژه.
Earned Value Management
5. Cost resources & PLAN DURATION
Schedule and Cost Variance Problem
5. Project PLAN & cost estimation
Project Management Life Cycle
Monitoring and Controlling
Earned Value $$$.
Presentation transcript:

PROJECT MANAGEMENT AND CONTROL Earned Value Analysis

Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare with idea of a ‘price’) Earned value (EV) or Budgeted cost of work performed (BCWP) – total of PVs for the work completed at this time SPM monitoring and control

Accounting conventions Work completed allocated on the basis 50/50 half allocated at start, the other half on completion. These proportions can vary e.g. 0/100, 75/25 etc Milestone current value depends on the milestones achieved Units processed Can use money values, or staff effort as a surrogate SPM monitoring and control

Earned value – an example Tasks Specify module 5 days Code module 8 days Test module 6 days At the beginning of day 20, PV = 19 days If everything but testing completed EV = 13 days Schedule variance = EV-PV i.e. 13-19 = -6 Schedule performance indicator (SPI) = 13/19 = 0.68 SV negative or SPI <1.00, project behind schedule A negative schedule variance (SV) means that the project is behind schedule as does a SPI that is less than 1.0. SPM monitoring and control

Earned value analysis – actual cost Actual cost (AC) is also known as Actual cost of work performed (ACWP) In previous example, if ‘Specify module’ actually took 3 days ‘Code module’ actually took 4 days Actual cost = 7 days Cost variance (CV) = EV-AC i.e. 13-7 = 6 days Cost performance indicator = 13/7 = 1.86 Positive CV or CPI > 1.00 means project within budget SPM monitoring and control

Earned value analysis – actual costs CPI can be used to produce new cost estimate Budget at completion (BAC) – current budget allocated to total costs of project Estimate at completion (EAC) – updated estimate = BAC/CPI e.g. say budget at completion is £19,000 and CPI is 1.86 EAC = BAC/CPI = £10,215 (projected costs reduced because work being completed in less time)

Time variance Time variance (TV) – difference between time when specified EV should have been reached and time it actually was For example say an EV of £19000 was supposed to have been reached on 1st April and it was actually reached on 1st July then TV = - 3 months

Earned value chart with revised forecasts This shows how the planned value (PV), earned value (EV) and actual cost (AC) can be tracked over the lifetime of a project. It also shows how the graph can be used to show adjustments to the final estimated cost and duration. A revised assessment of the budget at completion (EAC estimate at completion) can be produced by dividing the original estimated budget at completion (BAC) by the current CPI. Similarly a forecast of the actual duration of the project can be derived by dividing the original estimated duration by the SPI. SPM monitoring and control

Prioritizing monitoring We might focus more on monitoring certain types of activity e.g. Critical path activities Activities with no free float – if delayed later dependent activities are delayed Activities with less than a specified float High risk activities Activities using critical resources Critical path activities – by definition if these are late then the project as a whole will be delayed Activities with no free float – free float was defined in Lecture/Chapter 6. A project with no free float will delay following dependent activities, although the project end date may not be directly threatened. Activities with less than a specified float – projects when being executed can be very dynamic: some activities will take longer than estimated others less; this could lead to the critical shifting. Activities with small floats are the most likely to find themselves turned into activities on the critical path if their floats get eroded. High risk activities – recall the calculation of activity standard deviations in Chapter 7. If the standard deviation for an activity is large, this indicates that there is a lot of uncertainty about how long it will actually take. Activities using critical resources – some resources may only be available for a limited period and if the activities that need the resource are delayed the resource could become unavailable. SPM monitoring and control