TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK

Slides:



Advertisements
Similar presentations
RETAINED SOIL WALL SYSTEM™
Advertisements

ODOT Structure Project Manager Training
Bridge Design Manual Whats New?. Waters of the United States Placement of fill material below Ordinary High Water Mark (OHWM) requires 401/404 permit.
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
Actions and Retrofit of Post Earthquake-Damaged Bridges
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Bridge Engineering (6) Superstructure – Concrete Bridges
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Art Nowak February 2013 STRUCTURE DESIGN MANUAL 1.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Chapter 34 Bridge Construction.
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH.
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
Reconstruction of the Eads Bridge Highway Deck
2015 Winter School Structures Heidi A. Mertz, P.E. District 8-0 Structure Control Engineer.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Express Team University of New Mexico February 24, 2006.
Bridge 2153 Final Report Premier Engineering Rose-Hulman Institute of Technology.
Wabash Pedestrian Bridge Design For Riverfront Development Committee INC. and The City of Terre Haute.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
RM Product Update October 2009 Alexander Mabrich, PE, Msc Senior Engineering Consultant.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
By PARIKH KALPESH. Overview Introduction Structural evaluation of the bridge deck, girders, abutment, and piers Recommended non destructive tests Short.
Superstructure Replacement Substructure Repair Rehabilitation of I-95 Bridges 11 Bridges Along I-95 Corridor
Spliced Girders A Producer’s Perspective
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
Bentley Leap Bridge Components Overview
Reading Structural Drawings
Bridge Engineering (5) Substructure – Abutments and Piers
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
LRFD Now! Andy Zickler VDOT Structure and Bridge Division Central Office April 10, 2006
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
PROJECT REPORT DESIGN CONCEPTS OF BOW STRING GIRDER (40 M SPAN) OF ROAD OVERBRIDGE AND DESIGN OF SUB STRUCTURE FOR THE SAME.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Construction Methodology for Suramadu Main Bridge.
P3 (Preventive Pile Protection)
NORTHERN URBAN HIGHWAY MEXICO CITY
Offsite manufactured Bridges
Posting Bridges for Specialized Single-Unit Trucks
High Bridge Re-Deck Project
Required Drawings and Info for Formwork or Scaffold Design
Advisor: Dr. Bilal El Ariss
Engineering Terms Bridge Unit.
Pearl Condominiums Philadelphia, PA
Ness Bridge Construction
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Course Contents Culverts Bridges Buildings 20 November 2018.
Concrete Structures DR. Nabil Dmaidi.
ACEC Designer Training
Presentation transcript:

TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK DANIEL BURNS, PAUL HEBERT, AND BLAKE NICHOLS DEPARTMENT OF CIVIL & CONSTRUCTION ENGINEERING WESTERN MICHIGAN UNIVERSITY

Overview Background & Location Construction Engineering Constraints Preliminary Cost Estimate Quantity Takeoff Deliverables Schedule of Pay Items Structural Design Estimate of Cost Bridge Profile Construction Schedule Proposed Bridge Conclusions Design Software Sustainability Welded Steel Plate Girders Summary Prestressed Concrete Girders Further Recommendations Girder Material Evaluation Acknowledgements Deck & Railing Design Column Design Pier Cap Analysis Footing Analysis Abutment Analysis

Background & Location Portsmouth Township, Bay County Rated POOR (4) or worse MDOT recommends total replacement

Constraints Full Road Closure Freeboard = 1’ minimum Demolition and Construction = $5 million No Construction between April 1 and July 31

Deliverables Design Recommendations Structural Design Calculations Design Drawings Schedule of Pay Items Estimate of Cost Construction Schedule

Structural Design

Bridge Profile 249’ 6” 61’ 90’ 61’ Existing Profile - 1927 310’ 95’ 120’ 95’ Proposed Profile

Proposed Bridge Top View with Stations LEAP Concrete Rendering

Design Software Bentley LEAP Concrete & LEAP Steel Bridge Design Programs

Welded Steel Plate Girders End Cross Section Mid Cross Section

Prestressed Concrete Girders

Girder Material Evaluation Item Description Qty Unit Cost Total Cost Prestressed Concrete Design   Prest Conc I Beam, Furn, 54 inch 1,846 ft $174.00 /ft $321,204 Prest Conc I Beam, Erect, 54 inch $21.38 $39,467 Total $360,671 Welded Steel Plate Design Structural Steel, Plate, Erect 882,838 lb $0.16 /lb $141,254 Structural Steel, Plate, Furn and Fab $1.31 $1,156,517 $1,297,771   Cost Service Life Sustainability Total Prestressed Concrete Design 1 3 Welded Steel Plate Design 2 6 *Lower is better

Deck & Railing Design MDOT Bridge Design Guide Aesthetic Parapet Tube (6.29.10) MDOT Bridge Design Guide Standard Bridge Slab (6.41.01)

Column Design Top View Side View

Pier Cap Analysis Rebar Layout Rebar Schedule

Pier Cap Analysis Span 3 Flexure Check Span 3 Fatigue Check

Footing Analysis 6’ 6’ Cross-Section 50’ 6’ Rebar Plan Shear Analysis

Abutment Analysis Profile Dimensions End Dimensions Rebar Plan

Abutment Analysis LEAP Moment Analysis Output

Construction Engineering

Preliminary Cost Estimate Existing Bridge Deck 11,040 ft2 Proposed Bridge Deck 16,130   Item Description Unit Unit Rate Cost Bridge Removal $35.00 $386,413 Bridge Construction (River Crossing) $220.00 $3,548,554 Traffic Control (Detour Route) LS $75,000.00 $75,000 Sub Total $3,934,967 General Provisions Mobilization 5% of Total Cost $196,748 Miscellaneous Items Preliminary Cost of Project $4,328,464

Quantity Takeoff Concrete Rebar Epoxy Coated Rebar Superstructure (Deck) 399.70 yd3 0.00 lb 25,742.10   Abutment A 77.40 2,010.70 Pier B Cap 23.20 2,220.60 Column 15.40 2,827.60 Foundation 66.70 2,960.80 Pier C 16.00 2,924.40 Abutment B Substructure 366.00 9,943.00 10,193.20

Schedule of Pay Items Item ID Item Description QTY Units 7060001 Bridge Ltg, Furnish and Remove 1 LS 7060002 Bridge Ltg, Operate and Maintain 400 yd3 7060020 Concrete, Low Temperature Protection 766 7060090 Reinforcement, Steel 9943 lb 7060091 Reinforcement, Steel, Epoxy Coated 35935 7060100 Substructure Concrete 366 7060111 Superstructure Concrete, Form, Finish, and Cure 7060112 Superstructure Concrete, Form, Finish, and Cure, Night Casting 7060113 Superstructure Concrete, Night Casting, Deck 7080033 Prestressed Concrete I Beam, Furnish, 54 inch 1846 ft 7080034 Prestressed Concrete I Beam, Erect, 54 inch 7110005 Bridge Railing, Aesthetic Parapet Tube 620

Detailed Cost Estimate Division 2016 Award Avg Award 2016 Low 3 Avg Low 3 01 General Provisions $420,000 02 Earthwork $882,765 $843,637 $901,186 $871,872 03 Bases $100,495 $111,813 $109,218 $118,137 04 Drainage Features $44,792 $42,726 $46,213 $44,486 05 HMA Pavements $7,858 $7,722 $8,039 $7,916 06 PCC Pavements $213,353 $206,497 $247,174 $242,533 07 Structures $1,889,712 $1,884,071 $1,992,858 $1,963,286 08 Incidental Construction $404,227 $391,924 $425,466 $417,043 09 Materials N/A   TOTAL $3,963,202 $3,908,389 $4,150,154 $4,085,274

Construction Schedule Begin August 1, 2017 Total Duration is 121 Days End January 23, 2018 Sitework (17 Days) Substructure (30 Days) Superstructure (46 Days)

Conclusions

Sustainability Girder Material Selection Construction Schedule Service Life Maintenance Impact Construction Schedule DNR Restrictions Recycle Demolished Materials

Summary 3-Span, 310’ Bridge Prestressed Concrete Girders Demolition & Construction = $4.2 million Construction Duration = 121 days

Further Recommendations Traffic Impact Verification Pile Design Quantity Updates Demolition Planning

Acknowledgements MDOT Sponsor Advisor Senior Design Faculty Dina Tarazi, PE Dr. Yufeng Hu, PE James Ranger, PE Senior Design Faculty Dr. Decker Hains, PE, PMP Timothy Schnell

Questions?

Item Production Rate   QTY Duration Cofferdam Installation (Pier B) 2000 ft2/day 4576 sq ft 3 days Cofferdam Installation (Pier C) Cofferdam Excavation (Pier B) 200 yd3/day 883 cyd 5 Cofferdam Excavation (Pier C) Substructure Excavation (Abutment A) 1 unit/day units Pile (Abutment A) 10 piles/day 16 piles 2 Piles (Pier B) 12 Piles (Pier C) Piles (Abutment D) Pier B Construction days/unit Pier C Construction Abutment A Construction Abutment D Construction Girder Erection (Bay A-B) 6 girders/day 8 girders Girder Erection (Bay B-C) Girder Erection (Bay C-D) Bridge Deck - Form, Place Rebar 15 Bridge Deck - Pour days/span spans Bridge Deck - Cure 7 Structural Approach (Abutment A) Structural Approach (Abutment D) Parapet ft/day 620 feet 4 Barrier

Cofferdam Calculations   Cofferdam Height Above OHWM 1 foot Width of Existing Footing 8 feet Ordinary High Water Mark (OHWM) 581.61 Width of Proposed Footing 6 Riverbed Elevation 571 Center to Center Distance 15 Bottom of Footing 561.5 Work Space Width Length of Proposed Footing 50 Excavation Height = 9.5 Cofferdam Height = 22 Single Pier Surface Area to Retain = 4576 sq. ft. Width = 38 Length = 66 Single Pier Riverbed to Excavate = 883 cyd