SCRF WebEx Monthly Meeting Agenda and Reports from PM

Slides:



Advertisements
Similar presentations
ILC Global Design Effort 1 ILC SCRF (WG2) program GDE Status Debriefing Hitoshi Hayano 2008/2/25.
Advertisements

GDE-Tohoku Meeting WG-2 (SCRF) : Tasks and Goals Akira Yamamoto 1.SCRF efforts since Fermilab Meeting 2.Replan of SCRF R&D for TDP1 & 2 3.Tasks and Goals.
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Indian Plan for Contribution in Superconducting Cavity & Cryomodule Technology Prashant Khare Avinash Puntambekar RRCAT,India.
April SCRF Meeting FNAL08 S.Fukuda 1 HLRF Summary and Work Assignment S. FUKUDA KEK.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Summary and Discussion AAP-SCRF-Summary.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Report of Visiting PKU, Tsinghua U. IHEP Dec. 9 and 10, 2009 Kaoru Yokoya, Marc Ross, and Akira Yamamoto Report to ILC-EC, Dec. 11, 2008.
Plan for SCRF BTR January , 2012 Akira Yamamoto, Marc Ross, and Nick Walker (PMs) Jim Kerby, and Tetsuo Shidara (SCRF-APMs) Presented and discussed.
AD & I 15 August 2012 Marc Ross R&D for TDR Summary of TDP R&D items and baseline changes to RDR – to be included and highlighted in TDR text
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
SCRF Parallel Sessions at TILC09 GDE 活動報告 3月30日(月)10時~ 3号館7階会議 室 設楽 哲夫.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
1.Report from PMs 2.Report from GLs 3.Special report and discussions 1.SCRF report at AAP and response from AAP (C. Ginsburg, R. Geng) 2.S1-Global assembly.
ILC-EDR Kick-off Meeting Cavities Organization and Charges Sept. 19, 2007 Akira Yamamoto ILC-EDR Kick-off Meeting, Cavities Held at DESY, Sept ,
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
19-May-11 PAC Mtg - Taiwan Global Design Effort 1 Barry Barish PAC Meeting Academia Sinica, Taiwan 19-May-11 GDE Director’s Report Grooved Insert for CesrTA.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-19 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Saclay / Orsay visit – (GDE Project Managers) 1 R&D Plan: ‘Engineering Design’ Phase - presentation to Saclay / Orsay Marc Ross, Akira Yamamoto,
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
ACD Down-Select Criteria and Time Scales for HLRF ML-KOM FNAL September 27 、 2007 S. Fukuda, KEK & Ray Larsen, SLAC For the ILC HLRF Collaboration.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
SCRF: Monthly WebEx Meeting Oct., 19, 2011
SCRF Monthly WebEx Meeting May 6, 2010
ILC10 Beijing Global Design Effort
ILC Cryogenics Work Package Status and Plans
Oct 22 Group Leaders Planning meeting
Status of cavity fabrication facility at KEK
Meeting for S1-Global module design Cryomodule and Cryogenics
SCRF Monthly WebEx Meeting Sept. 22, 2010
ILC Project Management Status
SCRF Monthly WebEx Meeting May, 6, 2011
Global System Kick-off Meeting
SCRF Monthly WebEx Meeting Jan. 12, 2010
ILC-EDR Kick-off Meeting, Cryomodule and Cryogenics
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
2. SCRF General Preparation for the AD&I Preparation for AAP Review
ML-SCRF: Monthly WebEx Meeting Dec., 19, 2012
, A. Yamamoto SCRF WebEx Meeting.
WG3: Main Linac SCRF(cavity,cryomodule)
ILC Global Design Effort
Presentation transcript:

SCRF WebEx Monthly Meeting Agenda and Reports from PM Feb. 18, 2009

Agenda Report from Project Mangers (A. Yamamoto) Visiting DESY InPAC-2009 Cavity company visit Brief Status Report from each GL AAP Review, SCRF Session Preparation for the presentation (A.Y.) Plug-compatibility docment Appdendix update Improvement of functional and envelope parameters Cavity Integration (H. Hayano) Cryomodule (N. Ohuchi) HLRF (S. Fukuda) MLI, Quadrupole package (magnet and monitor) (C. Adolphsen) Others

Visiting DESY (Jan. 26-27) S1-Global: MOU Addendum Company visit Work sharing and responsibilities agreed Cavity contribution Participation to the cavity assembly and test Company visit ACCEL visit: fixed to be on March 6, Presentation from GDE being prepared

InPAC 2009 Indian Particle Accelerator Conference, 2009 Held at RRCAT, Indore AY served a talk on “The global R&D effort for SCRF technology for the ILC”, Discussion with RRCAT director, Dr. V. Sahni Long term cooperative effort to be expected specially on Cavity and Cryomodule design work in view of cost-effective manufacturing, Exchange of scientists and engineers Discussion on Cavity, Tuner, and Cryomodule Cavity with “Plasma spray” method (K.C.Mittal, BARC) Cost effective manufacturing: Cavity, end group NC machning (K. Prashant, RRCAT) Cryomodule, Split-support link b/w Gas return pipe and cavity MOU established between FNAL-Indian Institutions

AAP Review for SCRF: Context given by AAP What is the path to finalizing the gradiend choice? >> (S0) Current experimental status Established standards, Extrapolation of results Time limitations Decision process Role of plug-compatibility What is the path toward industrialization? (S1~S2)) Internationalization of efforts, Outline toward tendering process Role of Plug-compatibility Lessons expected from system tests (S2) Operational limitation of the ILC cavities, FLASH: ILC like mode, (Long bunch, high charge, high gradient) … STF NML Experience and characterization of implication for ILC Time lines, Benefits

AAP Review General Agenda

Outline for Presentation from SCRF AM Cavity Field Gradient (S0) Improvement of Gradient with understanding of behavior (L.Lilje) Process for Field Gradient Re-optimization (A.Y.) Number of statistics and definition of the statistics Cavity and Cryomodule Industrialization (S1) Cavity Integration and Cryomodule Assembly S1 and S1-global Plan (N. Ohuchi) R&D Efforts for mass production Plug compatibility of cavity and cryomodule (H. Hayano) PM Test Facilities for SCRF with Beam Acceleration (S2) FLASH at DESY (J. Carwardine) STF at KEK (H. Hayano) NML at FNAL (M. Champion) Cryogenics (T. Peterson) HLRF (S. Fukuda) ML Integration C. Adorphsen