MBD at Festo Status since the last meeting.

Slides:



Advertisements
Similar presentations
Bringing Visibility and Control to Your Operations.
Advertisements

Usage of the memoQ web service API by LSP – a case study
Overview This session is aimed at both PeopleSoft Financials users and Security Administrators. We will discuss plans for the 9.2 upgrade including.
© University of Strathclyde Assessing Aesthetic Quality Martin Fitchie University of Strathclyde.
Agile development By Sam Chamberlain. First a bit of history..
T-FLEX DOCs PLM, Document and Workflow Management.
1 McGraw-Hill/Irwin Copyright © 2004, The McGraw-Hill Companies, Inc. All rights reserved. Chapter 5: Introduction to e-Business Systems E-Business: “…the.
What is workflow?  A workflow is a structured way of defining and automating structures and procedures within an organization. What is workflow management.
Chapter 9 Using Data Flow Diagrams
1 The prefabricated metal buildings A strategy for the adoption of advanced Information Technologies.
TEAM MORALE Team Assignment 12 SOFTWARE MEASUREMENT & ANALYSIS K15T2-Team 21.
Introduction to BIM BIM Curriculum 01.
ISO Tor Stålhane IDI / NTNU. What is ISO ISO 9001 was developed for the production industry but has a rather general structure ISO describes.
Content Strategy.
Ravi Block Application Software Module 1.8.
Creo Parametric
Databases. What is a database?  A database is used to store data. The word DATA is actually Latin for FACTS. A database is, therefore, a place, or thing.
Ms. Marjukka Ala-Harja MoF, Finland, 1 The Quality Criteria of Public Online Services Mr. Juhani Korhonen Counsellor Public Management.
INFORMATION MANAGEMENT Unit 2 SO 4 Explain the advantages of using a database approach compared to using traditional file processing; Advantages including.
Knowledge Map.
Ptc creo 2d & model based definition
PTC Creo Unite Technology
Automation of NC-code generation for NC machines in the engineering industry Researcher: Egor Obuhov Scientific advisor: Sergey Bochkarev Perm National.
PLM & CAD Consultancy USG Engineering | PLM & CAD Consultancy Re-use with Options and Variants 1 Bas van Goch & Arjan Wolfert.
Project Management PTM721S
Information Systems Development
WP4 Models and Contents Quality Assessment
Umbrella Support Workflow
Best Practices for Workflow, Dialogs and Business Process Flows
Inspection process for plastic parts
PC-DMIS Introduction to GD&T Selection
Windchill Customization
Introduction to DESIGN AND THE DESIGN PROCESS
Yogesh Khanzode Senior Manager, GTEC-GIS GPO Whirlpool Corporation
PLM, Document and Workflow Management
European Modelbased Definition TC Face to Face Meeting on May 7th
Product Liability and MBD
MBD European Technical Committee
Intracompany Stock Transfer Scenario Overview
MBD European Technical Committee
SuiteCRM – Magento Integration
22-INTEGRATION HUB
Materials in Projects from Project Purchase Requests Scenario Overview
Unit 9 – Spreadsheet Development
IT Asset Management Status Update Hardware Asset Handling
Intracompany Stock Transfer Scenario Overview
Maintenance module Martin Heigl CTO
Westok cellular non-composite and composite beams
Crossing the gap between multimedia data and semantics
Information Systems Development
Database Applications – Microsoft Access
Tapping the Power of Your Historical Data
Information Systems in Organizations 2
Kanban Replenishment for All Types of Industries
Health Ingenuity Exchange - HingX
From legacy to annotated model in 10 min
Reporting: Intermediate
Product Engineering Scenario Overview
Intracompany Stock Transfer Scenario Overview
Materials in Projects from Project Purchase Requests Scenario Overview
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Prepared by Peter Boško, Luxembourg June 2012
Change Highlights January 2013
Functionality summary
Fusion 360 integrated CAD/CAM for digital manufacturing
ELITE ENGINEERING SERVICES
T-FLEX DOCs PLM, Document and Workflow Management.
Closing event 16th July 2019 Technical Assistance for Establishing the Institutional Framework for the Implementation of AIS/AES Project funded by the.
Revision Update and Reports
Presentation transcript:

MBD at Festo Status since the last meeting

Tooling section works with MBD Creo 2.0 Creo View 3.0 Mostly color based communication with supplier Tolerance is descript by a color table

Internal CAM manufacturing is using 3D models Anbaufabrik Automatic creatation of CAM models from the customer order Automated CAM program creating from the 3D model Mostly the geometry is used CAD/CAM environment Creo 3.0 Pro/NC UDF Mapkeys

Actual Status Where we are? Where will we want to go? Status until Q3 / 2016 Postpone the MBD activities until Creo 4.0 for the designing departsments New activities driven by Introducing GPS standards (ISO 8015 / ISO 1101) Planed Update to M230 in Q1 / 2017 Update of Windchill 10.1 with Creo View 2.0  Windchill 10.2 with Creo 3.1 in Q1 / 2017

Problem: C12493770 can not display 3D annotation in 2D Problem solved since M180 M110 2D 2D Since M180

GPS4Festo Introducing GPS – standards at Festo Steps in CAD Analyse of the current workflows Analyse of the GPS capacity of Creo 2.0 3D MBD 2D Countermeasure Which module can solve the problem? (3D / 2D) Steps in the organisation Training of the user Coaches in the development departsments Introducing of new tolerance calculation tool

GPS4Festo Where we stand now? CAD – analyse result Not all can be done in 2D Either in 3D 3D annotation reduce the complexity for the creating of 2D symbols 3D datum symbol supports the standard case better (acc. To GPS standard) Creo 2.0 and Creo 3.0 will not support the actual ISO – standards User – analyse result Most user doing the GD&T annotation in 2D with symbols created by Festo from the Wildfire 3.0 time Only some user are using the 3D annotation Usage of the GPS – standards is a change in how to think Company know – ledge transfer Lesson learned from other companies

GPS4Festo activities CAD 2D Using the 3D annotation Adding information in 2D, which can be done in 3D  2D symbols New 3D combined views Evaluate Creo 2.0 capacities and open case at PTC support Evaluation of add – on, e.g. GD&T Advisor User training Improve of the GPS – training  based on more practise experience New training for CAD user in 3D annotations Training based on projects Organisation Management attention by Board of Directors New team from all departments to introduce the GPS – standards as a cooperate project Introducing of team for different purpose (GPS – experts for the usage of the standards / management team for organisation items 2D GTOL Dialog in 3D 3D

Creo 2.0 and GPS - standards Analyse of the current supported standards Creo 2.0 supports the following standards only partial: ISO 1101 ISO 5459 ISO 14405 – 1 ISO 14405 – 2 In 2017 many new standards will be Released updated Many new ISO – Symbol can be found in the Arial Unicode MS font.

GPS usability for the user How is it possible to support the CAD user during the usage of the GPS – standard? Test of GD&T Advisor Different version M110 / M230 Gap analyse of the supported standards in the software to the actual standards Usability test by CAD user (still running) Support by external expert Increase the knowledge of the internal experts Build a knowledge base for Use cases Best practise

Additional further steps Interaction with new Q-system iqs based on 3D models Handling assembly based on 3D assemblies and Creo View