MetroWest Phase 1 James Willcock.

Slides:



Advertisements
Similar presentations
Safe roads, Reliable journeys, Informed travellers REGIONAL WORKSHOP ON PPP IN TRANSPORT RIGA, LATVIA – 6 to 8 MARCH 2007 MEASUREMENT OF PERFORMANCE IN.
Advertisements

TravelWatch SouthWest MetroWest - from concept to delivery James White 4 October 2014.
Bath and North East Somerset – The place to live, work and visit BUDGET FAIR 2014 Cllr David Bellotti Cabinet Member for Community Resources.
Constructing Mobility Futures: The Case of HS2 Murray Goulden Robert Dingwall 1.
Public Conference 16th December 2010
OVERVIEW AND SCRUTINY COMMITTEE SCRUTINY OF 20MPH SPEED LIMITS Rupert Thacker Team Leader – Forward Planning and Rail Liaison.
1West of England Area Rail Studies - David Crockett 08/02/2012 West of England Area Rail Studies Outline Summary This presentation summarises the work.
Road development in an age of austerity Graham Dalton Chief Executive, Highways Agency CIC February 2012.
1 Nottingham-Lincoln Stakeholder Board – Network Rail update Doreen Marsh – 26 th February 2015.
HS2 A National Strategy for High Speed Rail Prof Andrew McNaughton.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Is the expenditure on the ‘HS2’ rail route to Birmingham justified? To see more of our products visit our website at Mark Evetts, Cheltenham.
Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2.
Presentation to the Executive of the Carlisle Partnership 13 July 2009.
Discussion Document By G How. History LeadershipStructureProcessesInformationEnvironment The path of Shared Services is littered with failed attempts.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
TRANSPORT INNOVATION FUND Stephen McFarlane Regional & Local Transport Delivery - DfT.
Finance: The Critical Link The Transportation – Land Use – Environment Connection Brian D. Taylor October 2003 Institute of Transportation Studies.
Transit Oriented Development in the city region; a dream? Reindert Augustijn Team manager traffic and transport Stadsregio Arnhem Nijmegen.
LTP3 Development Sean Parks Nottinghamshire County Council.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
North East Lincolnshire Council delivering change through partnership ( Physical Regeneration, Property and Technical Services Partnership) Planning in.
20 mph - The Cambridge Experience John Richards Acting Project Delivery & Environment Manager.
The Regional Transport Strategy Transport for Regional Growth Conference Edinburgh 5 November 2015 John Saunders SEStran.
Communities M40 J12-J14 – Data Analysis, Modelling and Scheme Development.
Study on Regulatory Options for Further Market Opening in Rail Passenger Transport Stakeholder Meeting 10 February 2010 Session 2B Great Britain Case Study.
1 DPW comments on the 2005/06 Medium Term Policy Statement Delivered by the Director General, James Maseko 1 st November 2005.
Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs.
MHPP Forum James Shuttleworth Planning and Infrastructure Manager, MCC 9 December 2015 Greater Manchester Spatial Framework.
Industry Briefing 25 May 2016.
Experiences with creation of sustainable mobility plans (LTPs) in UK David Blackledge Transport and Travel Research Czech – Slovak conference on Integrated.
Bath and North East Somerset – The place to live, work and visit Student Accommodation in Bath -The B&NES Placemaking Plan- Bath City Forum 21 st January.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
TfN Freight AND RAIL UPDATE
Maria Machancoses Programme Director
Highways Maintenance Contract Commissioning Project
MetroWest Phase 2 LGA PT Consortium Visit 7th September 2017
Gauteng Rapid Rail Network Extensions
West of England Joint Transport Study
What’s the Combined Authority all about
Downtown Valdosta Truck Traffic Mitigation Study
Tourism Growth Partnership – Round 5
Somewhereville town centre regeneration - EXAMPLE
Delivering transport and growth
The Freight RUS - a draft for consultation
Midlands Connect: A Pan Midlands Strategic Transport Partnership
2017 SCORT Conference Washington, DC
Technical and Public Advisory Committee Meeting #3
2017/18 Budget and One Organisation Plan 2020
UK Link Technology Refresh
Rail Service Update Peter Jermany Principal Planner (Planning Policy)
Fishermans Bend Draft Framework Transport Recommendations
KEYNOTE STAGE SPONSOR.
Delivering East West Rail
LEAN DECISION MAKING CHOOSING BY ADVANTAGES PhD Randi Christensen, Head of Lean, Value Management and Innovation, Lower Thames Crossing, COWI.
ALCA North Somerset: West of England working and devolution
New Public Transport Infrastructure
Controlling Project Cost and Schedule
Heathrow Expansion Programme
Bristol’s Transport Strategy and the role of ULEVs
Measuring the performance of the SRN
Walsall-Rugeley Electrification
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Marco Polo – Towards a policy revision
KEYNOTE STAGE SPONSOR.
Manilla Low Level Crossing Project
GEML SOBC GEML Rail Conference July 2019
Great Eastern Mainline
Delivering the North East Chelmsford Growth Ambition
Whittlesford Parkway Station Stakeholder Workshop
Presentation transcript:

MetroWest Phase 1 James Willcock

MetroWest Programme The MetroWest programme arose out of studies into developing the local rail network in 2011 / 2012 Our local rail network is not as well developed as comparative city regions Key driver is to deliver a ‘Metro’ style local rail network with improved frequencies and connectivity, through a phased approach The MetroWest programme comprises of Phase 1, Phase 2 and other smaller schemes, all of which are being promoted by the councils Key objectives of the programme are to support economic growth, job creation and the delivery of the WoE Joint Spatial Plan and Joint Transport Plan

MetroWest Phase 1 & 2

MetroWest Phase 1 Three local lines: Severn Beach Line - service upgrade Bath Spa to Bristol Line - service upgrade Portishead Line - re-opening (5km disused line and 9km freight only line) 16 existing stations 2 new stations, Portishead & Pill 4 tunnels Design based on class 16x trains initially operating in 3 car formations Extend UK passenger train network by 14 km Scheme is being promoted by North Somerset Council on behalf of the four councils We have commissioned all rail design through Network Rail – there are pro’s and con’s to this approach

MetroWest Phase 1 MetroWest Phase 1 Context

MetroWest Phase 1 MetroWest Phase 1 Scheme up to early 2017 Upgrade the Severn Beach line to ½ hourly service to Avonmouth (hourly beyond) Upgrade the Keynsham and Oldfield Park stations to ½ hourly service Re-open the Portishead Branch Line with a ½ hourly train service GRIP 3 Option Selection (Outline Design) encountered considerable design challenges due to the ‘unusual alignment characteristics’ of the Portbury freight line. Upshot was GRIP 3 took nearly 2 years with over 300 deliverables. The the extent of technical scope creep was such that the capital out-turn cost estimate came in at approx. £160M, against a GRIP2 estimated out-turn of £58M..... over £100M more.....! Clearly there were considerable credibility issues for Network Rail and also the Councils as the client.

MetroWest Phase 1 Key drivers for the cost increase were: A significant increase in the scope of work through the Avon Gorge in order to meet safety standards for passenger trains and to increase the line speed to 50 mph while also accommodating freight trains The impact of 2 trains per hour at the Ashton Vale Road level crossing on rail safety, highway safety, traffic impact resulting in the need for an alternative access The consequential impact from the above on the amount of land, DCO requirements and environmental mitigation needed to deliver the scheme The increased risks associated with the project following the expanded works and recently identified constraints  Clifton Tunnel No 1 – below Clifton Suspension Bridge

MetroWest Phase 1

MetroWest Phase 1

MetroWest Phase 1 Revised Scheme Scope – Summer 2017 Taking a staged approach to the delivery of the scheme: Severn Beach Line - service upgrade remains ½ hourly Bath Spa to Bristol Line - service upgrade remains ½ hourly Portishead Line – initial passenger service will now be hourly The ambition remains to ultimately delivery a ½ hourly service for the Portishead line but this post opening upgrade would be a separate project with separate funding, business case and statutory processes

MetroWest Phase 1 Re-opening the Portishead Line – Further Complexities Re-opening the line requires multiple major processes: a Development Consent Order – for powers to build and operate and acquire land compulsorily (where needed) Habitats Regulations Assessment – due to the multiple environmental designations, i.e. SSSI x 2 and an SAC Plus not forgetting the GRIP process !

MetroWest Phase 1 Complex governance arrangements – 4 Councils (+ WECA) promoting the scheme but led by North Somerset Interface with complex rail industry governance and regulation At Project Level there are 10 Major Work Streams Core Project Team Rail Network Network Rail Highway CH2MHill & NSC BusinessCase inc Demand Modelling & Appraisal CH2MHill & NR Client PM Team Operations FGW & Client Environment Planning & Legal Bond Dickinson Property & Land Ardent Commercial Comms Existing Stations Refresh WoE Office Project Delivery Group

MetroWest Phase 1 Lessons learnt so far – as third party rail scheme promoter Rail engineering is far more complex than we previously thought and the challenges of delivering a major rail enhancement project are substantial Rail design/PM costs (GRIP 1 to 5) can be eye watering compared with highway design costs. Total preparation costs for our scheme will be around 20% of the scheme out-turn Don’t use a GRIP2 cost estimate for setting your budget A good Network Rail sponsor is essential who is willing and able to operate in both the rail industry world and the local government world Continuity of Network Rail Project Team/design team/consultants is important Don’t try to compress GRIP timescales, in fact add in some ‘breathing room’ if possible (but cost and political pressures to deliver asap)

Any Questions ?