Handling Engineering Group

Slides:



Advertisements
Similar presentations
Online Tenant Request System Reliable and accurate, the IMPAK online tenant request system significantly reduces telephone time and paperwork.
Advertisements


Unit I Module 1 - Introduction to RCM
COR2557: Revisions to the Metering Charges Pricing Module on Unique Sites UK Link Committee – January 2014.
INTRODUCTION 1. We will cover: -Focus Of Human Factors -Human Factors Emphasis - Human Factors’ Objectives -Human Factors Approach -Definition 2.
BIDDERS’ CONFERENCE IT-3980 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Up to 10 Tons Capacity 20 March.
INTRODUCTION TO PUBLIC PROCUREMENT
Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March.
BIDDERS’ CONFERENCE IT-3980 Replacement and Supply of Electrical Overhead Travelling Cranes up to 10 Tons Capacity March 20th 2014 Handling Engineering.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
Syed M. Ahmed, Ph.D. Department of Construction Management Risk Management in Construction Syed M. Ahmed, Ph.D. Department of Construction Management Florida.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
2015 HM section activity Helder Lourenço. E119/EN Maintenance Contract Maintenance services on industrial trucks on the CERN site 1700 assets (CH,CS,LV,RTL,RTH,RH,TP,DS)
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3972/EN PROVISION OF MAINTENANCE SERVICES ON INDUSTRIAL TRUCKS ON THE CERN SITE Insert.
Aerospace Ground Equipment (AGE) Support Services Pre-Proposal Conference/ Site Visit Kari M. Alvarado Contract Specialist NASA-DFRC November 8, 2006 Dryden.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Invitation To Tender Procedure IT – 4005/en Provision of engineering studies and drawings, the supply and installation of piping and its accessories.
More than experience CERN – 25 th November Initialization Phase Summary Maintenance Management Project Arek Burnos, Tony Vaclavicek Consultancy team.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
TENDERING PROCEDURE IT- 3927/EN
Specification & Quantities Estimating
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
Organization, Projects and Activity Forecast 2012 Oliver Böttcher, 29 th of March 2012 EN-HE-HM Handling Maintenance Section at CERN.
Operation & Maintenance in ST-MA presented by Rui Nunes.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
1 Barcelona May 2003 INFORMATICAL SYSTEM INTEGRATING THE RELIABILITY CENTERED MAINTENANCE THE SYSTEM IMPLEMENTATION.
Implementation structure The protocol stack was implemented formerly by UniControls, Inc. under the OS9 Real-Time OS. The new implementation for the VxWorks.
Safety Driven Performance Conference 2013 Integrating ModuSpec and WEST Engineering Services to advance excellence in drilling safety, integrity and performance.
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
Internet & for Learning The ICT in Schools Initiative of the Department of Education and Science 1 Internet & For Learning Objectives - Modules.
BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site May 5 th 2014 Handling Engineering Group2 Service.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
HNSciCloud Pre-Commercial Procurement Project Procurement Framework and Schedule Dante Gregorio CERN 26 January
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3976/EN PROVISION OF SPECIALIZED EOT CRANE MAINTENANCE SERVICES ON THE CERN SITE Insert.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Introduction to Codes, Standards, and Regulations Chattanooga State CC.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Optimizing the Contracts Management Module Dwight Busby TMA Systems.
Family Assessment Service Engagement Event 21 st August 2013 NWCE-9A3GPK.
FAILURE MODE EFFECTIVE ANALYSIS. Introduction Failure Mode Effect Analysis is an analytical technique that goes in for combining Technology and Experience.
UNIVERSITY OF PALESTINE FACULTY OF APPLIED ENGINEERING & URBAN PLANNING CIVIL ENGINEERING DEPARTMENT ENGINEERING PROJECT MANAGEMENT CHAPTER 3 INTRODUCTION.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
Models of Security Management Matt Cupp. Overview What is Security Management? What is Security Management? ISO/IEC ISO/IEC NIST Special Publication.
FIDIC Tendering Procedures
Asset Performance Improvement : Plans to Action
Maintenance strategies
BIL 424 NETWORK ARCHITECTURE AND SERVICE PROVIDING.
2012 Spring Simulation Interoperability Workshop
Asset & Maintenance EN-HE group
REPAIR FALL PROTECTION PROJECT
Particular Conditions of Contract & Appendix to Tender
Improving Community Safety through procurement practice and process Tim Oakley Head of Consultancy Trusted procurement for better buildings and homes.
Graduation Project (II): Operations Improvement at Mhanna Factory
(Additional materials)
PURCHASING AND SUPPLY MANAGEMENT
Reliability and Maintenance Management as a Part of Asset Management
IT-4328: Technical Specification
Overview of Asset Strategy and Maintenance Plan Development
Particular Conditions of Contract & Appendix to Tender
Washington Metropolitan Area Transit Authority (WMATA)
9/18/2018 Bids CONTRACTING Khamis…..
The Reliability Centred Maintenance (RCM) approach in Suriname
SEC Distribution Field Force Overview
التحكم في استخدام المصادر
Infor EAM in the Handling Engineering Group at CERN
Unit I Module 3 - RCM Terminology and Concepts
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

Handling Engineering Group

BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site Introduction to the Technical Specification May 5th 2014 Handling Engineering Group Handling Engineering Group

Handling Engineering Group Overview IT-3976 - BVFM appl. Laws (4P Doc) Technical Specification Service description (quality, quantity, lead times, costs) Full service + RCM Annexes A (separate doc.) B (Inventory + Service program – separate) C (links to Safety site) D (MSL 1-5 def.) E (Service Volume) F (Min. Requirements) G (Service Level Def.) H (KPI’s + Penalties) Envelop 1 Quality Memo Quality points (internal CERN) Evaluation Quest. Quality descr. Attachments ISO, EN, NF Norms General Conditions for ITs by CERN BVFM Result Quality 40% + Price 60% + Field Test General Conditions of CERN contracts Envelop 2 Annex B (Excel) Inventory Service Program Service Volume Service Prices Annex A: Working on CERN site Tender Form Contract price Annex C: Safety related to Service March 20th 2014 Handling Engineering Group

Handling Engineering Group Introduction of IT-3976 Part 1: Service description “Full service” contract Part 2: Service volume “Lump sum” services + Additional services Part 3: Service requirements + performance RCM Reliability Centered Maintenance Resources to be provided by the Contractor Evaluation of Services (KPIs) + Penalties Evaluation Questionnaire March 20th 2014 Handling Engineering Group

Reliability Centered Maintenance Reliability Centered Maintenance (RCM) is a process to ensure that assets continue to do what their users require in their present operating context. RCM can be used to create a cost-effective maintenance strategy to address dominant causes of equipment failure. It is a systematic approach to defining a routine maintenance program composed of cost-effective tasks that preserve important functions. RCM emphasizes the use of Predictive Maintenance (PdM) techniques in addition to traditional preventive measures. (Definition by Wikipedia and more information via http://en.wikipedia.org/wiki/Reliability_centered_maintenance ) March 20th 2014 Handling Engineering Group

Handling Engineering Group