OMP: Major maintenance policy of the LHC Accelerator and Detectors Motors & Compressor for the EYETS, YETS & LS2 period.

Slides:



Advertisements
Similar presentations
MAINTENANCE MANAGEMENT Module 9
Advertisements

Total Productive Maintenance
Circulating Water System
Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
Case 3 – Increasing hydrogen partial pressure
Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
ZONE 18 CRYOGENICS M. Sanmarti On behalf of AT-ACR-OP section.
ESS Cryogenic System Design
Maintenance Cost. Total Cost Preventive maintenance cost Breakdown maintenance cost Maintenance cost (RM) Optimum.
Where We Go Wrong - With Compressors Dick Hawrelak Presented to ES-317y in 1999 at UWO.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
H. Herzog, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN LARGE SCALE CRYOGENIC.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Principles of correct VRV Installation A. Refrigerant pipe work
October, 2009 Cryogenics System Roberto Than October, 2009 Internal Review.
M. Battistin – 8 th April 2009 DC Project 1 M. Battistin 8 th April 2009 Detector Cooling Project - The present M&O Agreement.
ORNL is managed by UT-Battelle for the US Department of Energy Cryogenic System Operating Experience at SNS Presented at the CEC/ICMC 2015 – C3OrA Matthew.
STATUS OF THE SOLEIL RF SYSTEM
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Experience from large helium inventory management at CERN ILC Cryogenics and Helium inventory meeting CERN, Wed. 18 th of June 2014 D. Delikaris Technology.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
Modern Maintenance. Management
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
Main flexibility tools for the adoption of high emission standards for LCPs set in the new Industrial Emissions Directive Gerard Lipinski Coordinator of.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
LHC Performance Workshop LS1 Session Cryogenic system: strategy to achieve nominal performance and reliable operation J. Bremer, K. Brodzinski, J. Casas,
Desmi Pumps in operation at LHCA P4 & P6
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
First operation of the XFEL linac with the 2K cryogenic system
Z. W. Zhou, Q. Y. Zhang*, X. F. Lu, L. B. Hu and P. Zhu
Machine operation and daily maintenance management in SOLEIL
Riunione CSN1 del 29 settembre - 3 ottobre 2014, Catania
FRIB Cryogenic Support
IT-4189 Supply and installation of a cryogenic distribution system
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
OMP 15th May 2017 Krzysztof Brodzinski and Nicolas Bonetti
Update on HW commissioning
Gas Power Plant - Layout and Operation
Preparation of the activities for the LHC Long Shutdown 2
OMP Special YETS TE-CRG.
Accelerator and Experiment Interface Session: LS2, LS3
CRYOGENICS OPERATIONS 2008 Organized by CERN
the CERN Electrical network protection system
Activities of the ME section during LS2 ( )
CRG-ME YETS 2017/2018 activities
Overview & baseline of LS2 and roadmap for CRG
YETS 2017 TE-CRG-OP overview of tasks to perform during the first month _GF YETS2017_CRG-OP.
Status of the cryogenic system for B180
Cryo stop of P8 on 1st of November
Giorgio Beato Service sales development manager Maintenance stories
Cryogenic cavern in Asian site
Mathew C. Wright January 26, 2009
ILC Experimental Hall Cryogenics An Overview
ESR 2 Presented to Joint Hall A/C Summer Meeting
P8 cryogenic PLC problems on
Presentation transcript:

OMP: Major maintenance policy of the LHC Accelerator and Detectors Motors & Compressor for the EYETS, YETS & LS2 period.

Maintenance strategy Applied maintenance method: Condition based maintenance with periodically vibration analysis as main monitoring tool. PM (Maintenance Plan) Spare part strategy System relevant compressor must have an equivalent compressor as cold or hot spare. (List in appendix)

Preventive maintenance After LS1 four cases of performed preventive maintenance November 2014 - Major overhaul QCCV-AERH07 VMY536aH compressor sent for major overhauling caused by noted increased vibration. Aerzen analysed wrong axial bearing load. June 2015 - Bearing change QCCV-AERH08 Increasing of the bearing frequencies noted within one month. Aerzen analysed non conformity at bearing mounting November 2015 - Bearing change QCCV-AERB15 Increasing of the bearing frequencies over several months. Decision was taken based on strategy (one spare for two bearing issues). SKF analysed that bearing issue was caused by a large number of overrolled indentations caused by soft and large, but also hard micro-particles. October 2016 – Bearing change QCCV-AERB15 Increasing of the bearing frequencies over several month. Decision was taken after putting pressure to SercAL and their vibration expert to take position taking into account the increased vibration behavior.

Corrective Maintenance Since the LHC- restart, one case of corrective maintenance ANRS Kaeser FSB440 compressor break down on 26/09/2016 . A Lack of vibration expertise's and communication has led to a corrective maintenance task. Nous relevons sur les mesures de la vis femelle du côté accouplé (DS) la présence des pics à une fréquence de 5,2 ordres. Cette fréquence est caractéristique d'un défaut de piste externe du roulement FAG NU316E. Cette fréquence était déjà visible lors de la mesure du 6 septembre (I-care counter expertise from 06/10/2016) In addition to the standard exchange (2 wks), a complete (time consuming) cleaning of the complete oil circuit was performed. (CPMD 10th October 2016) ATLAS Liquid argon Cryogenics: low availability (58%) of the dedicated nitrogen plant due to compressor breakdowns; 100% availability of the detector due to liquid nitrogen supply (Plenary Meeting 2016 - Thursday 24th of November 2016)

Summary Since it has been decided that vibration expertise shall be part of S176 contract, CRG/ME has reported several non-conformities (Vibration analyses, measurement and communication) to CRG/ML. => Strategy of predictive maintenance is questionable; => CRG/ME can no longer support efficiently the maintenance strategy.

Actually Communication flow shows a lack of efficiency Sub-contractor Expert CRG-ME CRG Operation Communication flow until 30 June 2016 CRG-ME CRG-ML CRG Operation Sub-contractor Expert Advanced Vibration Analysis Not defined Advanced Vibration Analysis

Many thanks for your attention

Compressors with more than 34’000 running hours at the end of 2017 (YETS)

Compressor List Detector

Compressor List LHCA Air Liquide / Linde

LHCB

LHCC Air Liquide - Linde

LHC cryogenic warm compressors layout LPb MPb HPb LPa MPa HPa S1-2 P18 S2-3 P2 S3-4 S4-5 P4 S5-6 S6-7 P6 S7-8 S8-1 P8 Aerzen Stal LHC cryogenic warm compressors layout 9 types of compressors: 2 Aerzen types (536aM & 536aH) - 7 Stal types (S73_LP, S73_HP, S75, S87, S89, S93_LP & S93_HP) 8 cryo plants 5 cryo islands Available spares (2016) (HP/ LP) (HP/ LP)

ATLAS & CMS “Hot spare” solution Upgrade of ATLAS and CMS compressor stations during first long shutdown (LS1) period of LHC (2013-2014) ATLAS : exchange of C2 compressor to ensure a mininimum of 400 g/s with three boosters, and new C6 compressor CMS: new hot spare compressors